VOLUME 3 OF 5                                        OMI NO. - S0007VL3
DATE: 07-08-99                                       REV.    - BF-1
 
 
 
                        SHUTTLE COUNTDOWN (LPS)
 
                               MAT COPY
 
 
DRAFT COPY
----------
RECIPIENT(S) SHALL REVIEW THIS COPY AND SUBMIT INPUT TO:
 
SFOC OMD:____________________  RM:________  EXT:________  DATE:________
 
 
PRELIMINARY REVIEW COPY
-----------------------
RECIPIENTS SHALL REVIEW THIS COPY, COORDINATE INPUT WITH CUSTOMER
COUNTERPARTS AND BRING MARKED UP COPY OF JOINT FUNCTIONAL INPUT
TO THE REVIEW MEETING SCHEDULED FOR:
 
DATE:__________  TIME:__________  RM:__________
 
FINAL REVIEW SIGNOFF COPY
-------------------------
RECIPIENTS SHALL REVIEW THIS COPY, COORDINATE INPUT WITH CUSTOMER
COUNTERPARTS AND BRING MARKED UP COPY OF JOINT FUNCTIONAL INPUT
TO SIGNOFF REVIEW MEETING SCHEDULED FOR:
 
DATE:__________  TIME:__________  RM:__________
 
 
PAGE BREAK COPY
---------------
RECIPIENT(S) SHALL REVIEW THIS COPY AND SUBMIT INPUT TO:
 
SFOC OMD:____________________  RM:________  EXT:________  DATE:________
 
                                             NOTE
 
                              IN EVENT OF A DISCREPANCY, THE
                              PUBLISHED OMI REVIEW MEETING SCHEDULE
                              TAKES PRECEDENCE OVER THIS SCHEDULE.
 
OMI TECHNICAL CONTACT:   ROGER GILLETTE, 1-7437                         |
 
OMI WRITER:   P.STIELER, 1-4958
 
 
DISTRIBUTION PER ATTACHED DISTRIBUTION LIST
 
 
   ------------------------------------------------------------------
             THIS PROCEDURE CONTAINS HAZARDOUS OPERATIONS
   ------------------------------------------------------------------
 
 
 
VOLUME 3 OF 5                                        OMI NO. - S0007VL3
DATE: 07-08-99                                       REV.    - BF-1
 
                         UNITED SPACE ALLIANCE
 
 
         ********************************************************
         *                                                      *
         *               SHUTTLE COUNTDOWN (LPS)                *
         *                                                      *
         ********************************************************
         *  EFFECTIVITY            CATEGORY: A                  *
         *                                   HA-                *
         *                                   VTBAGMQDSCWZF+ER   *
         *    CENTER:    KSC                                    *
         *                         SYSTEM:   TCO                *
         *    SITE: PAD A/B                                     *
         *                                                      *
         *    VEHICLE:   OV-102/103/104/105                     *
         *                                                      *
         *    FLOW: ALL                                         *
         *                                                      *
         *    DESIGN CENTER CONCURRENCE:     JSC & MSFC         *
         ********************************************************
 
   PREPARED BY:
 
   _________________________________
   SFOC TEST DOCUMENTATION
 
   APPROVED BY:
 
              CONTRACTOR
 
 
   _________________________________
   SFOC SAFETY
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
   ------------------------------------------------------------------
             THIS PROCEDURE CONTAINS HAZARDOUS OPERATIONS
   ------------------------------------------------------------------
 
 
 
VOLUME 3 OF 5                                        OMI NO. - S0007VL3
DATE: 07-08-99                                       REV.    - BF-1
 
 
 
 
 
 
 
 
 
 
 
         ********************************************************
         *                                                      *
         *               SHUTTLE COUNTDOWN (LPS)                *
         *                                                      *
         ********************************************************
         *  EFFECTIVITY            CATEGORY: A                  *
         *                                   HA-                *
         *                                   VTBAGMQDSCWZF+ER   *
         *    CENTER:    KSC                                    *
         *                         SYSTEM:   TCO                *
         *    SITE: PAD A/B                                     *
         *                                                      *
         *    VEHICLE:   OV-102/103/104/105                     *
         *                                                      *
         *    FLOW: ALL                                         *
         *                                                      *
         *    DESIGN CENTER CONCURRENCE:     JSC & MSFC         *
         ********************************************************
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
VOLUME 3 OF 5                                        OMI NO. - S0007VL3
DATE: 07-08-99                                       REV.    - BF-1
 
                         UNITED SPACE ALLIANCE
 
 
         ********************************************************
         *                                                      *
         *               SHUTTLE COUNTDOWN (LPS)                *
         *                                                      *
         ********************************************************
         *  EFFECTIVITY            CATEGORY: A                  *
         *                                   HA-                *
         *                                   VTBAGMQDSCWZF+ER   *
         *    CENTER:    KSC                                    *
         *                         SYSTEM:   TCO                *
         *    SITE: PAD A/B                                     *
         *                                                      *
         *    VEHICLE:   OV-102/103/104/105                     *
         *                                                      *
         *    FLOW: ALL                                         *
         *                                                      *
         *    DESIGN CENTER CONCURRENCE:     JSC & MSFC         *
         ********************************************************
   PREPARED BY:
 
   _________________________________
   SFOC TEST DOCUMENTATION
 
   APPROVED BY:
 
              CONTRACTOR                          GOVERNMENT
 
 
   _________________________________      ___________________________
   SFOC OPR                                SM
 
 
   _________________________________
   SFOC SAFETY
 
 
 
 
 
 
 
 
 
 
 
 
 
 
   ------------------------------------------------------------------
             THIS PROCEDURE CONTAINS HAZARDOUS OPERATIONS
   ------------------------------------------------------------------
 
 
 
VOLUME 3 OF 5                                        OMI NO. - S0007VL3
DATE: 07-08-99                                       REV.    - BF-1
 
                         REVISION RECORD PAGE
                         --------------------
 
   REV-CHANGE     DATE      REASON      PAGES AFFECTED       EFFECTIVITY
 ---------------------------------------------------------------------
 BF           : 05-05-99 :111/USK023 : ALL                :STS-96 & SUBS
 ---------------------------------------------------------------------  |
 BF-1         : 07-08-99 :112/USK217 : TOC,28-44,63,63.1, :STS-93 & SUBS|
              :          :           : 63.2,78,79,92,97,  :
              :          :           : 107,112,112.1,112.2:
              :          :           : 129,155,190,194,195:
              :          :           : 214,237,295,295.1- :
              :          :           : 295.4,299,328,328.1:
              :          :           : 328.2,363,371,373, :
              :          :           : 374,384.1,384.2,387:
              :          :           : 387.1,387.2,390,   :
              :          :           : 401.1-401.4,408,411:
              :          :           : 412,413,417,417.1, :
              :          :           : 417.2,418,425,426, :
              :          :           : 433,448,457,457.1, :
              :          :           : 457.2,473,479,515, :
              :          :           : 526,534,561,561.1, :
              :          :           : 576.1-576.4,633,634:
              :          :           : 634.1,634.2,685,704:
              :          :           : 704.1,704.2,729    :
 ---------------------------------------------------------------------
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
VOLUME 3 OF 5                                        OMI NO. - S0007VL3
DATE: 07-08-99                                       REV.    - BF-1
 
 
 
 
                        BACKUP SIGNATURE SHEET
 
         OMI TITLE:  SHUTTLE COUNTDOWN (LPS)
 
 
 
                  AGENCY                        SIGNATURES
 SYSTEM       CONTRACTOR/NASA      CONTRACTOR           GOVERNMENT
 ------       ---------------      ----------           ----------
 
 SUPPORT
 -------
 
 TSMO         SFOC                  ___________________  NA
 
 MILA         BFEC/GUSB            ___________________  NA
 
 RPS          SFOC                  ___________________  ______________
 
 CCMS         SFOC                  ___________________  ______________
 
 MEASUREMENTS USA/TE-CID-3B        ___________________  ______________
 
 ETR          PAN AM/SRO           ___________________  NA
 
 PHOTO        TGS                  ___________________  NA
 
 TIMING/
 COUNTDOWN    RCA-1                ___________________  NA
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
VOLUME 3 OF 5                                        OMI NO. - S0007VL3
DATE: 07-08-99                                       REV.    - BF-1
 
 
 
 
                        BACKUP SIGNATURE SHEET
 
         OMI TITLE:  SHUTTLE COUNTDOWN (LPS)
 
 
 
                  AGENCY                        SIGNATURES
 SYSTEM       CONTRACTOR/NASA      CONTRACTOR           GOVERNMENT
 ------       ---------------      ----------           ----------
 
 ORBITER
 -------
 
 NAVAIDS      SFOC/NASA           ___________________  ________________
 
 COMM         SFOC/NASA           ___________________  ________________
 
 INSTR        SFOC/NASA           ___________________  ________________
 
 HGDS         SFOC/NASA           ___________________  ________________
 
 PVD          SFOC/NASA           ___________________  ________________
 
 LAUNCH ACC   SFOC/NASA           ___________________  ________________
 
 EPD&C        SFOC/NASA           ___________________  ________________
 
 DPS          SFOC/NASA           ___________________  ________________
 
 DPSME        SFOC/NASA           ___________________  ________________
 
 QE           SFOC                 ___________________  NA
 
 CARGO/EXP    SFOC/NASA           ___________________  ________________
 
 HYDRAULICS   SFOC/NASA           ___________________  ________________
 
 APU          SFOC/NASA           ___________________  ________________
 
 MPS          SFOC/NASA           ___________________  ________________
 
 SSME         ROCKETDYNE           ___________________  NA
 
 SSME         SFOC/NASA            ___________________  ________________
 
 
 
 
 
 
 
 
 
 
VOLUME 3 OF 5                                        OMI NO. - S0007VL3
DATE: 07-08-99                                       REV.    - BF-1
 
 
 
 
                        BACKUP SIGNATURE SHEET
 
         OMI TITLE:  SHUTTLE COUNTDOWN (LPS)
 
 
 
                  AGENCY                        SIGNATURES
 SYSTEM       CONTRACTOR/NASA      CONTRACTOR           GOVERNMENT
 ------       ---------------      ----------           ----------
 
 (ORBITER CONTD)
 ---------------
 
 PRSD         SFOC/NASA           ___________________  ________________
 
 MECH/STRUC   SFOC/NASA           ___________________  ________________
 
 PYRO         SFOC/NASA           ___________________  ________________
 
 OMS/RCS      SFOC/NASA           ___________________  ________________
 
 ECLSS        SFOC/NASA           ___________________  ________________
 
 TPE/PEO      SFOC/NASA           ___________________  ________________
 
 VITT         NASA/JSC             NA                   ________________
 
 GLS          SFOC/NASA           ___________________  ________________
 
 G&N          SFOC/NASA           ___________________  ________________
 
 FLT CONT     SFOC/NASA           ___________________  ________________
 
 FCS          SFOC/NASA           ___________________  ________________
 
 ORB SOFTWARE SFOC/NASA           ___________________  ________________
 
 SFOC SAFETY   SFOC                 ___________________  NA
 
 JSC MISSION
 INTEG        RI-LSS/JSC-TA        ___________________  ________________
 
 
 
 
 
 
 
 
 
 
 
 
 
VOLUME 3 OF 5                                        OMI NO. - S0007VL3
DATE: 07-08-99                                       REV.    - BF-1
 
 
 
 
                        BACKUP SIGNATURE SHEET
 
         OMI TITLE:  SHUTTLE COUNTDOWN (LPS)
 
 
 
                  AGENCY                        SIGNATURES
 SYSTEM       CONTRACTOR/NASA      CONTRACTOR           GOVERNMENT
 ------       ---------------      ----------           ----------
 
 ET/SRB
 ------
 
 TEST COND          SFOC (ROR)     ___________________  NA
 
 PROJ ENGR          SFOC/NASA     ___________________  ________________
 
 ELECTRICAL         SFOC/NASA     ___________________  ________________
 
 INSTR              SFOC/NASA     ___________________  ________________
 
 MECH               SFOC/NASA     ___________________  ________________
 
 STRU               SFOC/NASA     ___________________  ________________
 
 PROPELLANTS (LOX)  SFOC/NASA     ___________________  ________________
 
 PROPELLANTS (LH2)  SFOC/NASA     ___________________  ________________
 
 FLT CONTLS         SFOC/NASA     ___________________  ________________
 
 SRSS               SFOC/NASA     ___________________  ________________
 
 DPS                SFOC/NASA     ___________________  ________________
 
 HYD                SFOC/NASA     ___________________  ________________
 
 MECH (SRB)         SFOC/NASA     ___________________  ________________
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
VOLUME 3 OF 5                                        OMI NO. - S0007VL3
DATE: 07-08-99                                       REV.    - BF-1
 
 
 
 
                        BACKUP SIGNATURE SHEET
 
         OMI TITLE:  SHUTTLE COUNTDOWN (LPS)
 
 
 
                  AGENCY                        SIGNATURES
 SYSTEM       CONTRACTOR/NASA      CONTRACTOR            GOVERNMENT
 ------       ---------------      ----------           ------------
 
 PAYLOAD
 -------
 
 TEST COND    MDS&DS               ___________________  NA
 
 PAYLOAD INTEG
 ENGR         MDS&DS/CS-PPD-1      ___________________  ________________
 
 ELECT ENGR   MDS&DS               ___________________  NA
 
 SOFTWARE     MDS&DS               ___________________  NA
 
 MIDDECK EXP  CS-EED-1             NA                   ________________
 
 IUS          BAO/6555TH           ___________________  ________________
 
 ULS          ESA                  ___________________  NA
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
VOLUME 3 OF 5                                        OMI NO. - S0007VL3
DATE: 07-08-99                                       REV.    - BF-1
 
                       DESIGN CENTER CONCURRENCE
                        BACKUP SIGNATURE SHEET
                       -------------------------
 
         OMI TITLE:  SHUTTLE COUNTDOWN (LPS)
 
 
                  AGENCY                        SIGNATURES
 SYSTEM       CONTRACTOR/NASA      CONTRACTOR*              GOVT
 ------       ---------------      -----------          ------------
 
 
 ORBITER      ORBITER ENGR         ___________________          NA
 
 SSP SYS
 INTEG        SYSTEM INTEG         ___________________          NA
 
 SSP KSC      SPACE SHUTTLE KSC
 INTEG        INTEG (ML-SIO)                 NA         ________________
 
 SSP CARGO
 INTEG        CARGO INTEG          ___________________          NA
 
 SSP CARGO    SPACE SHUTTLE SYS
 INTEG        INTEG (MS)                     NA         ________________
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
*  LSS REVIEWS ARE PER THE LIMITATIONS CONTAINED WITHIN THEIR
   RESPECTIVE MEMORANDA OF UNDERSTANDING WITH THE SFOC.
 
 
 
VOLUME 3 OF 5                                        OMI NO. - S0007VL3
DATE: 07-08-99                                       REV.    - BF-1
 
                         TABLE OF CONTENTS
                         -----------------
 
                                                              PAGE
                                                              ----
 
COVER PAGE
APPROVAL PAGE/CHANGE RECORD PAGE
TABLE OF CONTENTS
OBJECTIVE/DESCRIPTION .....................................     NA
ILLUSTRATIONS .............................................      1
HAZARDOUS MANLOADING ......................................     NA
BAR CHARTS ................................................      6
 
SECTION I - INFORMATION
 
    1.1  REFERENCED INSTRUCTIONS...........................      7
    1.2  COMPUTER SYSTEMS .................................     NA
    1.3  SPECIAL TOOLS, EQUIPMENT AND MATERIALS ...........     NA
    1.4  SUPPORT TOOLS, EQUIPMENT AND MATERIALS ...........     NA
    1.5  PERSONNEL REQUIREMENTS............................     27
    1.6  SAFETY REQUIREMENTS ..............................     NA
    1.7  SPECIAL INSTRUCTIONS  ............................     NA
    1.8  OMRS REQUIREMENTS SATISFIED BY THIS TOP...........     28
 
SECTION II - PRE-OPERATION SETUP INSTRUCTIONS                   NA
 
SECTION III - OPERATION SUPPORT SETUP INSTRUCTIONS              NA
 
SECTION IV - OPERATION INSTRUCTIONS
 
    29-000   HOLD OPTION NO. 2 - EXTENDED HOLD AT T-6 HR
             (PRIOR TO ET CRYO TANKING)....................     45
    30-000   INITIAL SCRUB................................     111
    31-000   24 HOUR SCRUB TURNAROUND......................    271
    32-000   48 HOUR OR LONGER SCRUB TURNAROUND............    455
    33-000   PAYLOAD SCRUB (24,48 AND 72 HOUR)............     633
    34-000   RSS/OWP MOVE OPERATIONS......................     635
    35-000   LAUNCH SCRUB AND SECURE......................     685
    36-000   PRSD SCRUB TURNAROUND OPTIONS................     835
 
SECTION V - POST OPERATION INSTRUCTIONS                         NA
 
APPENDICES
 
    A THRU Y ..............................................     NA
 
    Z        EMERGENCY INSTRUCTIONS .......................    967
 
 
 
 
 
 
 
 
 
VOLUME 3 OF 5                                        OMI NO. - S0007VL3
DATE: 07-08-99                                       REV.    - BF-1
 
1.5      PERSONNEL REQUIREMENTS
         ----------------------
 
         FOLLOWING CRITICAL SKILLS ARE REQUIRED FOR PERFORMANCE
         OF INDICATED PORTIONS OF THIS OMI.
 
         CONTROL NO.           TITLE                            SEQUENCE
         -----------           -----                            --------
 
 
         242           TORQUE AND SAFETY WIRING (TQ)            35,36
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
                                                                      27
 
VOLUME 3 OF 5                                        OMI NO. - S0007VL3
DATE: 07-08-99                                       REV.    - BF-1
 
1.8      OMRS REQUIREMENTS SATISFIED BY THIS TOP                      -1
         ---------------------------------------
 
VEHICLE/ELEMENT NO.  ORB_____/FLT_____  ET_____   SRB_____  LH___  RH___
 
GROUND HARDWARE PMN/SN _________  COMPONENT/SEGMENT ___________/FLT_____
 
SITE ______     TCN _______________                     DATE ___________
 
TOP WAS RUN AS A STANDALONE   YES _____   NO _____
TOP WAS RUN AS A SUBTASK TO TOP _________________.
 
                NOMENCLATURE/                            SEQ-STEP QC/ENG
OMRS NO./CIL NO EFFECTIVITY                              (CAP)    VERIF
--------------- -------------                            --------  -----
 
                                                                        |
B42AP0.050-B    APU BITE TEST (POST N2H4 LD TO L-24 HR)    31-289  _____|
(1R  )      L02 B056-999                                                |
                                                                        |
B42AP0.060-B    APU FREQ BITE (POST N2H4 LD TO L-24 HR)    31-289  _____|
(1   )      L02 B056-999                                                |
                                                                        |
B42AP0.080-B    BEARING SOAK (T-9 HR)                      31-293  _____|
(1R  )      L02 B056-999                                                |
                                                                        |
GLUGGDMF0.004   HUMS GAS ANALYSIS MLP-3                    31-348  _____|
                GOTBU                                    (MLP-3)        |
                                                                        |
GLVGGDMF0.004   HUMS GAS ANALYSIS MLP-2                    31-348  _____|
                GOTBU                                    (MLP-2)        |
                                                                        |
GLWGGDMF0.004   HUMS GAS ANALYSIS MLP-1                    31-348  _____|
                GOTBU                                    (MLP-1)        |
                                                                        |
GRVFEVRA1.005   PAD A FSS ELEVATOR#1 OPERATIONAL CHECK     31-314  _____|
(1   )          GFF1-90                                                 |
                                                                        |
GRVFEVRA2.005   PAD A FSS ELEVATOR#2 OPERATIONAL CHECK     31-314  _____|
(1   )          GFF1-90                                                 |
                                                                        |
GRXFEVRC0.005   PAD B FSS ELEVATOR#1 OPERATIONAL CHECK     31-314  _____|
(1   )          GFF1-90                                                 |
                                                                        |
GRXFEVRD0.005   PAD B FSS ELEVATOR#2 OPERATIONAL CHECK     31-314  _____|
(1   )          GFF1-90                                                 |
                                                                        |
G51FGDMA0.060   HGDS - SYSTEM GAS ANALYSIS                 31-348  _____|
                GOTBU                                    (PAD)          |
                                                                        |
G51FGDMA0.095   B/U HGDS-SYSTEM GAS ANALYSIS               31-348  _____|
                GOTBU                                    (PAD)          |
 
 
 
28
 
VOLUME 3 OF 5                                        OMI NO. - S0007VL3
DATE: 07-08-99                                       REV.    - BF-1
 
1.8      OMRS REQUIREMENTS SATISFIED BY THIS TOP                      -1
         ---------------------------------------
 
VEHICLE/ELEMENT NO.  ORB_____/FLT_____  ET_____   SRB_____  LH___  RH___
 
GROUND HARDWARE PMN/SN _________  COMPONENT/SEGMENT ___________/FLT_____
 
SITE ______     TCN _______________                     DATE ___________
 
TOP WAS RUN AS A STANDALONE   YES _____   NO _____
TOP WAS RUN AS A SUBTASK TO TOP _________________.
 
                NOMENCLATURE/                            SEQ-STEP QC/ENG
OMRS NO./CIL NO EFFECTIVITY                              (CAP)    VERIF
--------------- -------------                            --------  -----
 
G51FG0000.104   VERIFY VENT SEALS SUPPORT TANKING          31-559  _____|
                GOA;C                                                   |
                                                                        |
G61FGDMA0.060   HGDS - SYSTEM GAS ANALYSIS                 31-348  _____|
                GOTBU                                    (PAD)          |
                                                                        |
G61FGDMA0.095   B/U HGDS-SYSTEM GAS ANALYSIS               31-348  _____|
                GOTBU                                    (PAD)          |
                                                                        |
G61FG0000.104   VERIFY VENT SEALS SUPPORT TANKING          31-559  _____|
                GOA;C                                                   |
                                                                        |
PO18JD.020      REQUIREMENT RECORD IS NOT IN DATA BASE     33-003  _____|
                                                                        |
P018JB.035-C    QUIET TIME - LAUNCH COUNTDOWN              31-070B _____|
                PIUS                                                    |
                V04F10                                     31-157A _____|
                                                                        |
                                                           32-404C _____|
                                                                        |
P018JC.010      LAUNCH COUNTDOWN - IUS RQMTS.              31-157A _____|
                PAXAF                                                   |
                                                                        |
P018JD.015      HOLDS/RECYCLES (POWER UP)                  33-002  _____|
                PIUS;C                                                  |
                V04FE10;C                                               |
                                                                        |
P018JD.020      HOLDS/RECYCLES (POWER DOWN)                33-006  _____|
                PIUS;C                                                  |
                                                                        |
P095PR.895      MODULE COOLING - LAUNCH SCRUB              30-143  _____|
                PSHM;C                                   (SPACEHA)      |
                                                                        |
P329DB.240      MODULE COOLING - LAUNCH DELAY              30-143  _____|
                PLNEUROLAB;C                             (NEUROCA)      |
 
 
 
 
                                                                      29
 
VOLUME 3 OF 5                                        OMI NO. - S0007VL3
DATE: 07-08-99                                       REV.    - BF-1
 
1.8      OMRS REQUIREMENTS SATISFIED BY THIS TOP                      -1
         ---------------------------------------
 
VEHICLE/ELEMENT NO.  ORB_____/FLT_____  ET_____   SRB_____  LH___  RH___
 
GROUND HARDWARE PMN/SN _________  COMPONENT/SEGMENT ___________/FLT_____
 
SITE ______     TCN _______________                     DATE ___________
 
TOP WAS RUN AS A STANDALONE   YES _____   NO _____
TOP WAS RUN AS A SUBTASK TO TOP _________________.
 
                NOMENCLATURE/                            SEQ-STEP QC/ENG
OMRS NO./CIL NO EFFECTIVITY                              (CAP)    VERIF
--------------- -------------                            --------  -----
 
S00E00.A11      ET BIPOD HEATERS DEACTIVATION              30-293  _____|
            L03 TCN57,59-999;C                                          |
                                                                        |
S00E00.012      GH2 REDLINES                               30-011  _____|
(1   )          SAF;C                                                   |
                                                                        |
S00E00.015      HGDS REDLINES                              30-010  _____|
(1   )          VAF;C                                                   |
                                                                        |
S00E00.021      ET TPS MON DURING DETANK                   30-485  _____|
                TAF;C                                                   |
                                                                        |
S00E00.031      POST DETANK ET TPS INSPECT                 31-083  _____|
                TAF;C                                                   |
                                                           32-070  _____|
                                                                        |
S00E00.112      CONDITIONS FOR LO2 TANK VENTING            30-312  _____|
(1   )      L04 TCN90-999;C                                             |
                                                                        |
S00E00.161      ACTIVATE SSME GN2 PURGE HEATER POWER       30-312  _____|
(1   )      L02 V02FR12;C                                               |
                V03FR12;C                                               |
                V04FR8;C                                                |
                V05F;C                                                  |
                                                                        |
S00E00.230      MAINTAIN ET LO2 TANK PRESS DURING DRAIN    30-312  _____|
(1   )      L06 TCN76-999;C                                             |
                                                                        |
S00E00.240      ET LH2 TANK PRESS DURING/AFTER DRAIN       30-427  _____|
(1   )      L02 TCN76-95;C                                              |
                ET LH2 TANK PRESS DURING/AFTER DRAIN                    |
            L03 TCN96-999;C                                             |
                                                                        |
S00E00.250      MPS LH2 DETANK VALVE CONFIGURATION         30-190  _____|
(1   )          VAF;C                                                   |
 
 
 
 
30
 
VOLUME 3 OF 5                                        OMI NO. - S0007VL3
DATE: 07-08-99                                       REV.    - BF-1
 
1.8      OMRS REQUIREMENTS SATISFIED BY THIS TOP                      -1
         ---------------------------------------
 
VEHICLE/ELEMENT NO.  ORB_____/FLT_____  ET_____   SRB_____  LH___  RH___
 
GROUND HARDWARE PMN/SN _________  COMPONENT/SEGMENT ___________/FLT_____
 
SITE ______     TCN _______________                     DATE ___________
 
TOP WAS RUN AS A STANDALONE   YES _____   NO _____
TOP WAS RUN AS A SUBTASK TO TOP _________________.
 
                NOMENCLATURE/                            SEQ-STEP QC/ENG
OMRS NO./CIL NO EFFECTIVITY                              (CAP)    VERIF
--------------- -------------                            --------  -----
 
S00E00.272      VFY ET LH2 LIQ LVL SNSR DURING DRAIN       30-345  _____|
(1R  )          TAF;C                                                   |
                                                                        |
S00E00.280      POST DETANK LH2 VLV CONFIG                 30-422  _____|
(1   )          VAF;C                                                   |
                                                                        |
S00E00.310      MPS LO2 DETANK VLV CONFIG                  30-312  _____|
(1   )          VAF;C                                                   |
                                                                        |
S00E00.332      VFY ET LO2 LIQ LVL SNSRS DURING TK DN      30-312  _____|
(1R  )          VAF;C                                                   |
                                                                        |
S00E00.340      POST DETANK MPS LO2 VLV CONFIG             30-312  _____|
(1   )          VAF;C                                                   |
                                                                        |
S00E00.400      CLOSE SSME BLEED VLVS POST DETANK          32-103  _____|
(1   )          VAF;C                                                   |
                                                           35-143  _____|
                                                                        |
S00E00.430      VFY ORB/ET LH2 TNK H2 CONCENTRATION        32-092  _____|
(1   )          VAF;C                                                   |
                                                           35-152  _____|
                                                                        |
S00E00.490      VERIFY ET INTERTANK COMPARTMENT TEMP       30-345  _____|
(1   )          TAF;C                                                   |
                                                                        |
S00E00.500      REINSTALL NOSE CONE GO2 VENT HOOD          30-312  _____|
(1   )          VAF;C                                                   |
                                                                        |
S00E00.520      REMOVE NOSE CONE GO2 VENT HOOD             30-400  _____|
                VAF;C                                                   |
                                                                        |
S00E00.552      VERIFY ET NOSE CONE PURGE                  30-312  _____|
(1   )      L03 TCN68-999;C                                             |
 
 
 
 
 
                                                                      31
 
VOLUME 3 OF 5                                        OMI NO. - S0007VL3
DATE: 07-08-99                                       REV.    - BF-1
 
1.8      OMRS REQUIREMENTS SATISFIED BY THIS TOP                      -1
         ---------------------------------------
 
VEHICLE/ELEMENT NO.  ORB_____/FLT_____  ET_____   SRB_____  LH___  RH___
 
GROUND HARDWARE PMN/SN _________  COMPONENT/SEGMENT ___________/FLT_____
 
SITE ______     TCN _______________                     DATE ___________
 
TOP WAS RUN AS A STANDALONE   YES _____   NO _____
TOP WAS RUN AS A SUBTASK TO TOP _________________.
 
                NOMENCLATURE/                            SEQ-STEP QC/ENG
OMRS NO./CIL NO EFFECTIVITY                              (CAP)    VERIF
--------------- -------------                            --------  -----
 
S00E00.620      OPEN LH2 FDLN RELIEF SOV POST DETANK       30-345  _____|
(1   )          VAF;C                                                   |
                                                                        |
S00E00.621      LH2 BOILOFF TIMELINES                      30-346  _____|
                TAF;C                                                   |
                                                           32-079  _____|
                                                                        |
                                                           35-128  _____|
                                                                        |
S00E00.630      OPEN LO2 FDLN RELIEF SOV POST DETANK       30-312  _____|
(1   )          VAF;C                                                   |
                                                                        |
S00E00.650      SECURE RCS                                 30-100  _____|
(1R  )          VAF;C                                                   |
                                                                        |
S00E00.660      SECURE OMS                                 30-105  _____|
                VAF;C                                                   |
                                                                        |
S00E00.690      SHUTDOWN FUEL CELLS                        30-487  _____|
                VAF;C                                                   |
                                                                        |
S00E00.700      PRSD TOPOFF                                36-473  _____|
(1R  )          VAF;C                                                   |
                                                                        |
S00E00.721-B    FUEL ISOLATION VALVE CYCLE (E)             30-323  _____|
(1   )          BAF;C                                                   |
                                                                        |
S00E00.745      RSRM EXTERNAL INSPECTION                   35-550  _____|
                BAF;C                                                   |
                                                                        |
S00E00.755      NOZZLE BLOWOUT PLUG INSPECTION             35-550  _____|
(1   )          BAF;C                                                   |
 
 
 
 
 
 
 
32
 
VOLUME 3 OF 5                                        OMI NO. - S0007VL3
DATE: 07-08-99                                       REV.    - BF-1
 
1.8      OMRS REQUIREMENTS SATISFIED BY THIS TOP                      -1
         ---------------------------------------
 
VEHICLE/ELEMENT NO.  ORB_____/FLT_____  ET_____   SRB_____  LH___  RH___
 
GROUND HARDWARE PMN/SN _________  COMPONENT/SEGMENT ___________/FLT_____
 
SITE ______     TCN _______________                     DATE ___________
 
TOP WAS RUN AS A STANDALONE   YES _____   NO _____
TOP WAS RUN AS A SUBTASK TO TOP _________________.
 
                NOMENCLATURE/                            SEQ-STEP QC/ENG
OMRS NO./CIL NO EFFECTIVITY                              (CAP)    VERIF
--------------- -------------                            --------  -----
 
S00E00.815      OEX/MADS RCDR ERASE FOR RECYCLE            32-010  _____|
                VAF;C                                                   |
                                                           35-110  _____|
                                                                        |
S00E00.850      DEACTIVATE HYD CIRCULATION PUMPS           29-093  _____|
(1R  )          VAF;C                                                   |
                                                           30-469  _____|
                                                                        |
S00E00.860      EQUALIZE CABIN PRESSURE                    30-157  _____|
(1   )          VAF;C                                    (VAG29)        |
                                                                        |
S00E00.995-B    WSB STEAM VENT PLUGS INSPECTION            35-325  _____|
                VAF;C                                                   |
                                                                        |
S00E00.995-E    ET UMBILICAL BAGGIES INSPECTION            35-489  _____|
                VAF;C                                                   |
                                                                        |
S00FA0.116      ET LO2 LOW RANGE ULLAGE PRESS XDCR CK      31-455  _____|
(1   )      L02 T90-999                                                 |
                                                                        |
S00FA0.120      LO2 VENT/RELIEF VLV ACTUATION LINE PGE     31-455  _____|
(1   )          TAF1-999                                                |
                                                                        |
S00FA0.141      VERIFY ET LO2 LOW RANGE PRESSURES          31-455  _____|
(1   )      L02 T45,49,51,54-999                                        |
 
 
 
 
 
 
 
 
 
 
 
 
 
 
                                                                      33
 
VOLUME 3 OF 5                                        OMI NO. - S0007VL3
DATE: 07-08-99                                       REV.    - BF-1
 
1.8      OMRS REQUIREMENTS SATISFIED BY THIS TOP                      -1
         ---------------------------------------
 
VEHICLE/ELEMENT NO.  ORB_____/FLT_____  ET_____   SRB_____  LH___  RH___
 
GROUND HARDWARE PMN/SN _________  COMPONENT/SEGMENT ___________/FLT_____
 
SITE ______     TCN _______________                     DATE ___________
 
TOP WAS RUN AS A STANDALONE   YES _____   NO _____
TOP WAS RUN AS A SUBTASK TO TOP _________________.
 
                NOMENCLATURE/                            SEQ-STEP QC/ENG
OMRS NO./CIL NO EFFECTIVITY                              (CAP)    VERIF
--------------- -------------                            --------  -----
 
S00FA0.213-A    PERFORM AND VERIFY SSMEC POWER ON          32-249  _____|
(1   )      L02 V02F25-90                                               |
                V03F24-90                                               |
                V04F21-90                                               |
                V05F12-90                                               |
                                                                        |
S00FA0.213-B    LOAD CONTROLLER MEMORY                     32-249  _____|
(1   )      L02 V02F25-90                                               |
                V03F24-90                                               |
                V04F21-90                                               |
                V05F12-90                                               |
                                                                        |
S00FA0.213-C    EXECUTE SENSOR AND SPARK IGNITER C/O       32-249  _____|
(1   )      L02 V02F25-90                                               |
                V03F24-90                                               |
                V04F21-90                                               |
                V05F12-90                                               |
                                                                        |
S00FA0.213-D    EXECUTE COMMANDED CONTROLLER CHECKOUT      32-249  _____|
(1   )      L02 V02F25-90                                               |
                V03F24-90                                               |
                V04F21-90                                               |
                V05F12-90                                               |
                                                                        |
S00FA0.213-E    EXECUTE PNEU COMPONENT CHECKOUT            32-249  _____|
(1   )      L02 V02F25-90                                               |
                V03F24-90                                               |
                V04F21-90                                               |
                V05F12-90                                               |
 
 
 
 
 
 
 
 
 
 
34
 
VOLUME 3 OF 5                                        OMI NO. - S0007VL3
DATE: 07-08-99                                       REV.    - BF-1
 
1.8      OMRS REQUIREMENTS SATISFIED BY THIS TOP                      -1
         ---------------------------------------
 
VEHICLE/ELEMENT NO.  ORB_____/FLT_____  ET_____   SRB_____  LH___  RH___
 
GROUND HARDWARE PMN/SN _________  COMPONENT/SEGMENT ___________/FLT_____
 
SITE ______     TCN _______________                     DATE ___________
 
TOP WAS RUN AS A STANDALONE   YES _____   NO _____
TOP WAS RUN AS A SUBTASK TO TOP _________________.
 
                NOMENCLATURE/                            SEQ-STEP QC/ENG
OMRS NO./CIL NO EFFECTIVITY                              (CAP)    VERIF
--------------- -------------                            --------  -----
 
S00FA0.213-F    VERIFY SSME FLIGHT ACTIVE                  32-249  _____|
(1   )      L02 V02F25-90                                               |
                V03F24-90                                               |
                V04F21-90                                               |
                V05F12-90                                               |
                                                                        |
S00FA0.213-G    ISSUE SSME PSN 3 COMMAND (REF. C-6)        32-249  _____|
(1   )      L02 V02F25-90                                               |
                V03F24-90                                               |
                V04F21-90                                               |
                V05F12-90                                               |
                                                                        |
S00FA0.213-H    ISSUE SSME CONT RESET CMD                  32-249  _____|
(1   )      L02 V02F25-90                                               |
                V03F24-90                                               |
                V04F21-90                                               |
                V05F12-90                                               |
                                                                        |
S00FA0.213-I    ISSUE SSME PSN1 COMMAND (REF. R-1)         32-249  _____|
(1   )      L02 V02F25-90                                               |
                V03F24-90                                               |
                V04F21-90                                               |
                V05F12-90                                               |
                                                                        |
S00FA0.213-J    VERIFY ACTUATOR COMMAND/POSITION           32-249  _____|
(1   )      L02 V02F25-90                                               |
                V03F24-90                                               |
                V04F21-90                                               |
                V05F12-90                                               |
                                                                        |
S00FA0.225      PERF/VFY INIT LH2 ORB/ET DISC CAV PURG     31-190  _____|
            L02 V02F22-90                                               |
                V03F22-90                                  31-629  _____|
                V04F18-90                                               |
                V05F12-90                                               |
 
 
 
 
                                                                      35
 
VOLUME 3 OF 5                                        OMI NO. - S0007VL3
DATE: 07-08-99                                       REV.    - BF-1
 
1.8      OMRS REQUIREMENTS SATISFIED BY THIS TOP                      -1
         ---------------------------------------
 
VEHICLE/ELEMENT NO.  ORB_____/FLT_____  ET_____   SRB_____  LH___  RH___
 
GROUND HARDWARE PMN/SN _________  COMPONENT/SEGMENT ___________/FLT_____
 
SITE ______     TCN _______________                     DATE ___________
 
TOP WAS RUN AS A STANDALONE   YES _____   NO _____
TOP WAS RUN AS A SUBTASK TO TOP _________________.
 
                NOMENCLATURE/                            SEQ-STEP QC/ENG
OMRS NO./CIL NO EFFECTIVITY                              (CAP)    VERIF
--------------- -------------                            --------  -----
 
S00FA0.510      RSS STATUS CHECK                           31-499  _____|
(1   )      L03 B082-999                                                |
                                                                        |
S00FA0.600      RSRM PMBT                                  31-421  _____|
(1   )          B025,027-999;C                                          |
                                                           32-450  _____|
                                                                        |
S00FA0.610      RSRM SEGMENT JOINT HEATER SYSTEM           31-323  _____|
(1R  )      L01 B042-098                                                |
                RSRM SEGMENT JOINT HEATER SYSTEM                        |
            L02 B099-999                                                |
                                                                        |
S00FA0.620      RSRM IGNITER HEATER SYSTEM                 31-073  _____|
(1R  )      L02 B073-098                                                |
                RSRM IGNITER HEATER SYSTEM                              |
            L03 B099-999                                   31-324  _____|
                                                                        |
                                                           32-433  _____|
                                                                        |
S00FA0.770      FLT CNTL SRB TVC POWER UP                  31-270  _____|
                VAF1-90                                                 |
                                                                        |
S00FA0.810-A    LO2 17-INCH DISC AND LATCH POSITIONING     31-175  _____|
                VAF1-90                                                 |
                                                           32-487  _____|
                                                                        |
S00FA0.810-B    LH2 17-INCH DISC AND LATCH POSITIONING     32-476  _____|
                VAF1-90                                                 |
                                                                        |
S00FA0.820      VERIFY CREW ESC ROUTE TEMP/H2 SENSORS      31-409  _____|
                SAF1-999                                                |
 
 
 
 
 
 
 
 
36
 
VOLUME 3 OF 5                                        OMI NO. - S0007VL3
DATE: 07-08-99                                       REV.    - BF-1
 
1.8      OMRS REQUIREMENTS SATISFIED BY THIS TOP                      -1
         ---------------------------------------
 
VEHICLE/ELEMENT NO.  ORB_____/FLT_____  ET_____   SRB_____  LH___  RH___
 
GROUND HARDWARE PMN/SN _________  COMPONENT/SEGMENT ___________/FLT_____
 
SITE ______     TCN _______________                     DATE ___________
 
TOP WAS RUN AS A STANDALONE   YES _____   NO _____
TOP WAS RUN AS A SUBTASK TO TOP _________________.
 
                NOMENCLATURE/                            SEQ-STEP QC/ENG
OMRS NO./CIL NO EFFECTIVITY                              (CAP)    VERIF
--------------- -------------                            --------  -----
 
S00FA0.900      PRELAUNCH WEATHER BRIEFING (L-1 DAY)       30-016  _____|
                VAF1-90                                                 |
                                                           32-453  _____|
                                                                        |
S00FA0.960      RSRM IGNITER HEATER SYS CURRENT VERIF      31-073  _____|
                B025,027,028                                            |
                B032-999                                   31-324  _____|
                                                                        |
                                                           32-433  _____|
                                                                        |
S00FA0.970      RSRM FLD JNT HEATER SYS CURRENT VERIF      31-323  _____|
                B025,027,028                                            |
                B032-999                                                |
                                                                        |
S00FB0.070      VFY MPS HE SYS CONFIG                      31-629  _____|
(1R  )          VAF1-90                                                 |
                                                                        |
S00FB0.080      MPS HELIUM SYSTEM ACTIVATION               31-629  _____|
(1R  )          VAF1-90                                                 |
                                                                        |
S00FB0.082      SSME REG MONITORING REQUIREMENTS           31-629  _____|
(1R  )      L02 V02F23-90                                               |
                V03F23-90                                               |
                V04F20-90                                               |
                V05F12-90                                               |
                                                                        |
S00FB0.083      PNEU REG MONITORING REQUIREMENTS           31-629  _____|
                VAF1-90                                                 |
                                                                        |
S00FB0.090-B    MPS LH2 VLV PRELOADING CONFIGURATION       31-629  _____|
(1   )          VAF1-90                                                 |
 
 
 
 
 
 
 
 
                                                                      37
 
VOLUME 3 OF 5                                        OMI NO. - S0007VL3
DATE: 07-08-99                                       REV.    - BF-1
 
1.8      OMRS REQUIREMENTS SATISFIED BY THIS TOP                      -1
         ---------------------------------------
 
VEHICLE/ELEMENT NO.  ORB_____/FLT_____  ET_____   SRB_____  LH___  RH___
 
GROUND HARDWARE PMN/SN _________  COMPONENT/SEGMENT ___________/FLT_____
 
SITE ______     TCN _______________                     DATE ___________
 
TOP WAS RUN AS A STANDALONE   YES _____   NO _____
TOP WAS RUN AS A SUBTASK TO TOP _________________.
 
                NOMENCLATURE/                            SEQ-STEP QC/ENG
OMRS NO./CIL NO EFFECTIVITY                              (CAP)    VERIF
--------------- -------------                            --------  -----
 
S00FB0.230      VERIFY ORB/LPS LDB REDUNDANCY              31-397  _____|
(1R  )      L03 V02F22-90                                               |
                V03F23-90                                               |
                V04F19-90                                               |
                V05F12-90                                               |
                                                                        |
S00FB0.290      INITIATE ET INTERTANK PURGE                31-629  _____|
(1   )          T37-999                                                 |
                                                                        |
S00FB0.330      INITIATE ET NOSE CONE PURGE & CONTROL      31-455  _____|
(1   )      L04 T64-999;C                                               |
                                                                        |
S00FB0.350      MONITOR GO2 VENT HOOD                      30-484  _____|
(1   )          VAF1-90                                                 |
                                                           31-559  _____|
                                                                        |
S00FB0.370      VFY RSS/RCVY BATTERY AMP-HR                31-627  _____|
            L02 B082-999                                                |
                                                                        |
S00FC0.070      PFM HYD SYS CONFIG FOR CRYO LOAD           31-226  _____|
(1R  )      L04 V02F17-90                                               |
                V03F19-90                                               |
                V04F13-90                                               |
                V05F7-90                                                |
                                                                        |
S00FC0.072      PFM LDG GR SYS FINAL FILL                  31-227  _____|
(1R  )      L03 V02F12-90                                               |
                V03F15-90                                               |
                V04F13-90                                               |
                V05F2-90                                                |
                                                                        |
S00FC0.090      INSTL GO2 VENT HOOD & INITIATE PURGE       31-466  _____|
(1   )          VAF1-90                                                 |
                                                                        |
S00FE0.020      ACTIVATE LH2 T-0 UMB PLATE HE PURGE        31-190  _____|
(1   )          VAF1-90                                                 |
 
 
 
38
 
VOLUME 3 OF 5                                        OMI NO. - S0007VL3
DATE: 07-08-99                                       REV.    - BF-1
 
1.8      OMRS REQUIREMENTS SATISFIED BY THIS TOP                      -1
         ---------------------------------------
 
VEHICLE/ELEMENT NO.  ORB_____/FLT_____  ET_____   SRB_____  LH___  RH___
 
GROUND HARDWARE PMN/SN _________  COMPONENT/SEGMENT ___________/FLT_____
 
SITE ______     TCN _______________                     DATE ___________
 
TOP WAS RUN AS A STANDALONE   YES _____   NO _____
TOP WAS RUN AS A SUBTASK TO TOP _________________.
 
                NOMENCLATURE/                            SEQ-STEP QC/ENG
OMRS NO./CIL NO EFFECTIVITY                              (CAP)    VERIF
--------------- -------------                            --------  -----
 
S00FE0.040      ACTIVATE TSM AND TUNNEL PURGES             31-629  _____|
(1   )          VAF1-90                                                 |
                                                                        |
S00FE0.050      VFY ET GUCP LH2 VENT DISC CAVITY PURGE     31-629  _____|
(1   )      L02 T68-999                                                 |
                                                                        |
S00L00.030      ET TANKING WIND VELOCITY LIMIT (KSC)       31-317  _____|
(1   )          SAF1-999                                                |
                                                                        |
S00L00.051-A    LH2 TANK PRESSURE (WIND CONDITION)         30-425  _____|
(1   )      L02 T43,45,48-51                                            |
                T54-999                                    30-428  _____|
                                                                        |
                                                           32-087  _____|
                                                                        |
                                                           32-467  _____|
                                                                        |
                                                           35-138  _____|
                                                                        |
S00L00.051-B    LO2 TANK PRESSURE (WIND CONDITION)         31-455  _____|
(1   )      L02 T43,45,48-51                                            |
                T54-999                                                 |
                                                                        |
S00L00.080      ET PROP LOADING LIGHTNING CONSTRAINTS      31-317  _____|
(1   )          SAF1-999                                                |
                                                                        |
S00L00.085      WIND PREDICTION - SRB RETRIEVAL AREA       31-643  _____|
                B072-999                                                |
                                                                        |
S00U00.030      PRELAUNCH SHUTTLE/PAD AREA INSPECTION      31-084  _____|
(1   )          SAF1-999                                                |
                                                           32-454  _____|
                                                                        |
T09QAL.030      ET TPS INSPECTION ON PAD                   32-590  _____|
(1   )      L04 T57-999                                                 |
 
 
 
 
                                                                      39
 
VOLUME 3 OF 5                                        OMI NO. - S0007VL3
DATE: 07-08-99                                       REV.    - BF-1
 
1.8      OMRS REQUIREMENTS SATISFIED BY THIS TOP                      -1
         ---------------------------------------
 
VEHICLE/ELEMENT NO.  ORB_____/FLT_____  ET_____   SRB_____  LH___  RH___
 
GROUND HARDWARE PMN/SN _________  COMPONENT/SEGMENT ___________/FLT_____
 
SITE ______     TCN _______________                     DATE ___________
 
TOP WAS RUN AS A STANDALONE   YES _____   NO _____
TOP WAS RUN AS A SUBTASK TO TOP _________________.
 
                NOMENCLATURE/                            SEQ-STEP QC/ENG
OMRS NO./CIL NO EFFECTIVITY                              (CAP)    VERIF
--------------- -------------                            --------  -----
 
V05AG0.060-C    GN2 PURGE INITIATION TIME                  31-563  _____|
            L05 V02F22-90                                               |
                V03F23-90                                               |
                V04F19-90                                               |
                V05F12-90                                               |
                                                                        |
V05AH0.050-C    GN2 PURGE INITIATION TIME                  31-563  _____|
            L06 V02F22-90                                               |
                V03F23-90                                               |
                V04F19-90                                               |
                V05F12-90                                               |
                                                                        |
V05AI0.060-C    PURGE PARAMETERS FOR ET LOADING - GN2      31-563  _____|
            L04 V02F22-90                                               |
                V03F23-90                                               |
                V04F19-90                                               |
                V05F12-90                                               |
                                                                        |
V09AG0.020      WINDOW CLEANING/INSPECTION                 34-086  _____|
(1   )      L03 V02F19-90                                               |
                V03F22-90                                               |
                V04F15-90                                               |
                V05F9-90                                                |
                                                                        |
V09AH0.090      RSI - PCR SEAL/INTERFACE                   34-084  _____|
(1   )      L03 V02F21-90                                               |
                V03F22-90                                               |
                V04F18-90                                               |
                V05F12-90                                               |
                                                                        |
V30C00.010      PLBD MOISTURE CONDITIONING                 31-105  _____|
                V02F25-90;C                                             |
                V03F25-90;C                                32-585  _____|
                V04F21-90;C                                             |
                V05F13-90;C                                             |
 
 
 
 
40
 
VOLUME 3 OF 5                                        OMI NO. - S0007VL3
DATE: 07-08-99                                       REV.    - BF-1
 
1.8      OMRS REQUIREMENTS SATISFIED BY THIS TOP                      -1
         ---------------------------------------
 
VEHICLE/ELEMENT NO.  ORB_____/FLT_____  ET_____   SRB_____  LH___  RH___
 
GROUND HARDWARE PMN/SN _________  COMPONENT/SEGMENT ___________/FLT_____
 
SITE ______     TCN _______________                     DATE ___________
 
TOP WAS RUN AS A STANDALONE   YES _____   NO _____
TOP WAS RUN AS A SUBTASK TO TOP _________________.
 
                NOMENCLATURE/                            SEQ-STEP QC/ENG
OMRS NO./CIL NO EFFECTIVITY                              (CAP)    VERIF
--------------- -------------                            --------  -----
 
V51AG0.075-A    LH NLG TPDMS LONG TERM DECAY RATE          31-607  _____|
            L04 V02F16-20E20;C                                          |
                V03F18-21E21;C                                          |
                V04F13-17E17;C                                          |
                V05F5-11E11;C                                           |
                LH NLG TPDMS LONG TERM DECAY RATE                       |
            L05 V02F21-90R21;C                                          |
                V03F22-90R22;C                                          |
                V04F18-90R18;C                                          |
                V05F12-90R12;C                                          |
                                                                        |
V51AG0.075-B    RH NLG TPDMS LONG TERM DECAY RATE          31-607  _____|
            L04 V02F16-20E20;C                                          |
                V03F18-21E21;C                                          |
                V04F13-17E17;C                                          |
                V05F5-11E11;C                                           |
                RH NLG TPDMS LONG TERM DECAY RATE                       |
            L05 V02F21-90R21;C                                          |
                V03F22-90R22;C                                          |
                V04F18-90R18;C                                          |
                V05F12-90R12;C                                          |
                                                                        |
V51AG0.075-C    LH INBD TPDMS LONG TERM DECAY RATE         31-607  _____|
            L04 V02F16-20E20;C                                          |
                V03F18-21E21;C                                          |
                V04F13-17E17;C                                          |
                V05F5-11E11;C                                           |
                LH INBD TPDMS LONG TERM DECAY RATE                      |
            L05 V02F21-90R21;C                                          |
                V03F22-90R22;C                                          |
                V04F18-90R18;C                                          |
                V05F12-90R12;C                                          |
 
 
 
 
 
 
 
                                                                      41
 
VOLUME 3 OF 5                                        OMI NO. - S0007VL3
DATE: 07-08-99                                       REV.    - BF-1
 
1.8      OMRS REQUIREMENTS SATISFIED BY THIS TOP                      -1
         ---------------------------------------
 
VEHICLE/ELEMENT NO.  ORB_____/FLT_____  ET_____   SRB_____  LH___  RH___
 
GROUND HARDWARE PMN/SN _________  COMPONENT/SEGMENT ___________/FLT_____
 
SITE ______     TCN _______________                     DATE ___________
 
TOP WAS RUN AS A STANDALONE   YES _____   NO _____
TOP WAS RUN AS A SUBTASK TO TOP _________________.
 
                NOMENCLATURE/                            SEQ-STEP QC/ENG
OMRS NO./CIL NO EFFECTIVITY                              (CAP)    VERIF
--------------- -------------                            --------  -----
 
V51AG0.075-D    LH OUTBD TPDMS LONG TERM DECAY RATE        31-607  _____|
            L04 V02F16-20E20;C                                          |
                V03F18-21E21;C                                          |
                V04F13-17E17;C                                          |
                V05F5-11E11;C                                           |
                LH OUTBD TPDMS LONG TERM DECAY RATE                     |
            L05 V02F21-90R21;C                                          |
                V03F22-90R22;C                                          |
                V04F18-90R18;C                                          |
                V05F12-90R12;C                                          |
                                                                        |
V51AG0.075-E    RH INBD TPDMS LONG TERM DECAY RATE         31-607  _____|
            L04 V02F16-20E20;C                                          |
                V03F18-21E21;C                                          |
                V04F13-17E17;C                                          |
                V05F5-11E11;C                                           |
                RH INBD TPDMS LONG TERM DECAY RATE                      |
            L05 V02F21-90R21;C                                          |
                V03F22-90R22;C                                          |
                V04F18-90R18;C                                          |
                V05F12-90R12;C                                          |
                                                                        |
V51AG0.075-F    RH OUTBD TPDMS LONG TERM DECAY RATE        31-607  _____|
            L04 V02F16-20E20;C                                          |
                V03F18-21E21;C                                          |
                V04F13-17E17;C                                          |
                V05F5-11E11;C                                           |
                RH OUTBD TPDMS LONG TERM DECAY RATE                     |
            L05 V02F21-90R21;C                                          |
                V03F22-90R22;C                                          |
                V04F18-90R18;C                                          |
                V05F12-90R12;C                                          |
 
 
 
 
 
 
 
42
 
VOLUME 3 OF 5                                        OMI NO. - S0007VL3
DATE: 07-08-99                                       REV.    - BF-1
 
1.8      OMRS REQUIREMENTS SATISFIED BY THIS TOP                      -1
         ---------------------------------------
 
VEHICLE/ELEMENT NO.  ORB_____/FLT_____  ET_____   SRB_____  LH___  RH___
 
GROUND HARDWARE PMN/SN _________  COMPONENT/SEGMENT ___________/FLT_____
 
SITE ______     TCN _______________                     DATE ___________
 
TOP WAS RUN AS A STANDALONE   YES _____   NO _____
TOP WAS RUN AS A SUBTASK TO TOP _________________.
 
                NOMENCLATURE/                            SEQ-STEP QC/ENG
OMRS NO./CIL NO EFFECTIVITY                              (CAP)    VERIF
--------------- -------------                            --------  -----
 
V58AA0.041-J    HYD SYS 1 BOOTSTRAP ACCUM PRESS            35-485  _____|
                VAF1-90                                                 |
                                                                        |
V58AA0.041-K    HYD SYS 2 BOOTSTRAP ACCUM PRESS            35-485  _____|
                VAF1-90                                                 |
                                                                        |
V58AA0.041-L    HYD SYS 3 BOOTSTRAP ACCUM PRESS            35-485  _____|
                VAF1-90                                                 |
                                                                        |
V65BA0.010-B    SAMPLING AT F-2 TO F-0 DAYS                32-400  _____|
            L02 V02F24                                                  |
                V03F24                                                  |
                V04F20                                                  |
                V05F12                                                  |
                                                                        |
V67AA0.030-B    SAMPLING AT L-2 TO L-0 DAYS                31-030  _____|
                V02F25-90                                               |
                V03F25-90                                               |
                V04F21-90                                               |
                V05F13-90                                               |
                                                                        |
V75AP0.010      CONFIGURE OI PCMMU FOR LCD (GND CNTR)      30-149  _____|
(1R  )          V02F22-90                                               |
                V03F23-90                                               |
                V04F19-90                                               |
                V05F12-90                                               |
 
 
 
 
 
 
 
 
 
 
 
 
 
                                                                      43
 
VOLUME 3 OF 5                                        OMI NO. - S0007VL3
DATE: 07-08-99                                       REV.    - BF-1
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
                    THIS PAGE INTENTIONALLY BLANK
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
44
 
VOLUME 3 OF 5                                        OMI NO. - S0007VL3
DATE: 07-08-99                                       REV.    - BF-1
 
                        OPERATION INSTRUCTIONS
 
   SEQ   TIME       CMD  RESP       DESCRIPTION                 VERIF.
-------- ---------- ---- ---- --------------------------------- ------
 
                              RAISE GOX VENT HOOD
                              -------------------
 
29-102   +00H30M    TBC  CMEC TERMINATE GN2 PURGE AND RAISE     SU73040
                    136       GOX VENT HOOD PER OMI G2158.
                              CMEC COORDINATE WITH GSPN ON CH 114.
                              REPORT COMPLETION.
 
29-103              CMEC TBC  GN2 PURGE HAS BEEN TERMINATED AND
                    136       GOX VENT HOOD RAISED PER G2158.
 
                              GN2 TO AIR CHANGEOVER COMPLETE
                              ------------------------------
 
29-104   +00H35M    CPVD OTC  ORBITER "GN2 TO AIR CHANGEOVER,"  SU73003
                    132       OPTION A ACCOMPLISHED.
                    OTC  NTD
                    232
                    NTD  *SCC
                    *SCC *PSE
                    NET
                    105
 
29-104A             PTC  OTC  AFTER CIRCUIT STABILIZES, PERFORM       -1|
                    132       ORBITER OPERATION SUPPORT SETUP 15,       |
                    OTC  CPVD PAYLOAD BAY PURGE VERIFICATION.           |
                         CMQC                                           |
                              NOTIFY PTC IMMEDIATELY IF PURGE           |
                              GOES OUT OF SPEC. (STS-93)                |
                                                                        |
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
                                                                      63
 
VOLUME 3 OF 5                                        OMI NO. - S0007VL3
DATE: 07-08-99                                       REV.    - BF-1
 
                        OPERATION INSTRUCTIONS
 
   SEQ   TIME       CMD  RESP       DESCRIPTION                 VERIF.
-------- ---------- ---- ---- --------------------------------- ------
 
                              MLP O2 MONITOR STATUS                   -1|
                              ---------------------
 
29-105   +00H35M    NTD  STM  PERFORM MLP O2 MONITOR STATUS.    PWR
                    232                                         SU73021
                    STM  JBEP                                   SU73050
                    111
 
29-106              JBEP STM  MLP O2 MONITOR STATUS COMPLETE.   PWR
                    111       RECORD OUT OF LIMITS OR TROUBLE
                    STM  NTD  INDICATIONS (IF ANY):
                    232
                    NTD  *SCC
                              _______________________________
 
                              _______________________________
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
63.1
 
VOLUME 3 OF 5                                        OMI NO. - S0007VL3
DATE: 07-08-99                                       REV.    - BF-1
 
                        OPERATION INSTRUCTIONS
 
   SEQ   TIME       CMD  RESP       DESCRIPTION                 VERIF.
-------- ---------- ---- ---- --------------------------------- ------
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
                    THIS PAGE INTENTIONALLY BLANK
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
                                                                    63.2
 
VOLUME 3 OF 5                                        OMI NO. - S0007VL3
DATE: 07-08-99                                       REV.    - BF-1
 
                        OPERATION INSTRUCTIONS
 
   SEQ   TIME       CMD  RESP       DESCRIPTION                 VERIF.
-------- ---------- ---- ---- --------------------------------- ------
 
                              VENT DOORS TO PURGE POSITION
                              ----------------------------
 
29-107              OTC  CPVD RETURN VENT DOORS TO ADVERSE      SU73022
                    132       WEATHER PURGE CONFIGURATION.
 
29-108                   CPVD CURSOR CNTL (VAM31/VAM09)
                              RETURN VENT DOORS 1 AND 2 (BOTH
                              SIDES) TO PURGE POSITION.  CLOSE
                              VENT DOORS 8 AND 9 R/H
 
29-109              CPVD OTC  VENT DOORS IN ADVERSE WEATHER
                              PURGE CONFIGURATION.
 
29-110              OTC  CPVD INCREASE CREW MODULE TEMP TO
                    132       70 +/- 5 DEG F.
 
                              DPS LCD SEQ SECURING
                              --------------------
 
                                             NOTE
 
                                   PERFORM NEXT STEP IF
                                   VASJ6 ACTIVE.
 
29-111                   CDPS PFP (VASJ6)
                              TERMINATE - PRESS
                                                NOT PERFORMED     ______
 
                                             NOTE
 
                                   PERFORM NEXT STEP IF LCC
                                   MONITORING ACTIVE.
 
29-112                   CDPS CURSOR CNTL (VASP9 PGB)
                              RETURN TO HOST
                              XMIT CURSOR KEY - PRESS
 
                              CURSOR CNTL (VASP9 PG B)
                              INHIBIT LCC MONITORING
                              XMIT CURSOR KEY - PRESS
 
                                                NOT PERFORMED     ______
 
29-113                   CDPS APPL PAGE (VASP9 PG B)
                              PFK15 KEY - PRESS
                              PFK15 KEY - PRESS
 
 
 
64
 
VOLUME 3 OF 5                                        OMI NO. - S0007VL3
DATE: 07-08-99                                       REV.    - BF-1
 
                        OPERATION INSTRUCTIONS
 
   SEQ   TIME       CMD  RESP       DESCRIPTION                 VERIF.
-------- ---------- ---- ---- --------------------------------- ------
 
                                             NOTE
 
                                   PERFORM NEXT STEP AFTER
                                   INITIAL SAFING CREWS HAVE
                                   ENTERED PAD.
 
29-144   +00H50M    NTD  *SEC DROP BDA ROADBLOCK REQUIREMENTS   SEC
                    232       AT A-3, B-4, A-5, A-6 (PAD A)     SU73027
                              OR B-3, B-4 (PAD B).
 
29-145              *SEC NTD  BDA ROADBLOCKS DISABLED.          SEC
                    232       PAD NOW CONTROLLED AT PAD GATE.
                    NTD  OTC
                         TBC
                         STM
                         *SCC
                    *SCC *PSE
                    NET
                    105
 
                                             WARNING
 
                                   PTCR AND ECS ROOM IS
                                   PRESSURIZED - DOOR MUST
                                   BE RESTRAINED WHEN
                                   OPENING.
 
                                   PTCR AND ECS ROOM WILL
                                   DEPRESSURIZE WHEN ECS
                                   ROOM DOOR IS OPENED.
 
29-146   +00H50M    NTD  STM  OPEN SOUTH ECS ROOM DOOR AND      HVAA
                    232       RESTRAIN IN OPEN POSITION.
                    STM  JBAC
                    111
 
29-147              NTD  *SCC PERFORM O2 LEVEL CHECK OF PTCR
                    232       AND ECS CONTROL ROOM.
                    *SCC *PSE
                    NET
                    105
 
29-148              *PSE *SCC O2 LEVEL CHECKS ACCEPTABLE AND
                    NET       SAFETY CONCURS IN OPENING PTCR/ECS
                    105       ROOM FOR CONTROLLED WORK.
                    *SCC NTD
                    232
 
 
 
                                                                      77
 
VOLUME 3 OF 5                                        OMI NO. - S0007VL3
DATE: 07-08-99                                       REV.    - BF-1
 
                        OPERATION INSTRUCTIONS
 
   SEQ   TIME       CMD  RESP       DESCRIPTION                 VERIF.
-------- ---------- ---- ---- --------------------------------- ------
 
                              GN2 ISO VALVE LOCKOUT
                              ---------------------
 
29-149   +00H50M    NTD  OTC  SECURE ECS ROOM GN2 MANUAL        SU73028
                    232  *SCC ISOLATION VALVES PER OMI V1122
                    OTC  CPVD SEQ - TERMINATION OF ECS HAZ
                    132       PURGE GN2 OPERATIONS.
                    *SCC *PSE
                    NET       RT OMI LOG NO.__________
                    105
 
                              LH2 SAFING
                              ----------
 
29-150              CLHY TBC  LH2 SAFING CREW AT LH2 STORAGE    SU73046
                    136       AREA.  READY TO BEGIN LH2 STORAGE       -1|
                    TBC  NTD  AREA SECURING.                            |
                    232                                                 |
                    NTD  *SCC
 
29-151              TBC  CLHY ESTABLISH REQUIRED ROADBLOCKS, TURN
                    136       ON AREA HAZARD WARNING LIGHTS TO
                    CLHY PLHY FLASHING AMBER AND CLEAR NONESSENTIAL
                    166       PERSONNEL FROM LH2 STORAGE AREA AND
                              ALL PERSONNEL CLEAR LH2 FLARE STACK
                              AREA.  PERFORM COMMUNICATIONS CHECK
                              ON NET 105 AND BACKUP NET 205.
 
                              ESSENTIAL PERSONNEL
                              -------------------
 
                                           SFOC    NASA    JBOSC
                                           ----   ------   -----
                              SYS ENG        1       1
                              TECH           4
                              SAFETY ENG     1
                              FIRE                           1
 
 
 
 
 
 
 
 
 
 
 
 
 
78
 
VOLUME 3 OF 5                                        OMI NO. - S0007VL3
DATE: 07-08-99                                       REV.    - BF-1
 
                        OPERATION INSTRUCTIONS
 
   SEQ   TIME       CMD  RESP       DESCRIPTION                 VERIF.
-------- ---------- ---- ---- --------------------------------- ------
 
29-152              PLHY CLHY CLEARS ESTABLISHED.  BARRIERS           -1|
                    166       AND HAZARDOUS WARNING SIGNS
                    CLHY TBC  INSTALLED. FIRE ON SITE. READY TO         |
                    136       PROCEED WITH LH2 STORAGE AREA             |
                    TBC  NTD  SECURING PER OMI G3251 OPERATION          |
                    232       SUPPORT SETUP 4 TO EXTINGUISH LH2         |
                    NTD  *SCC FLARE STACK, AND OPERATION SUPPORT        |
                              SETUP 7 TO SECURE LH2 STORAGE TANK        |
                              BLOCK VALVES. REQUEST SAFETY              |
                              CONCURRENCE TO PROCEED WITH LH2           |
                              STORAGE AREA SECURING.                    |
 
29-153              *SCC NTD  YOU HAVE SAFETY CONCURRENCE TO
                    232       PROCEED WITH LH2 STORAGE AREA
                    NTD  TBC  SECURING.
                    TBC  CLHY
                    136
                    CLHY PLHY
                    166
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
                                                                      79
 
VOLUME 3 OF 5                                        OMI NO. - S0007VL3
DATE: 07-08-99                                       REV.    - BF-1
 
                        OPERATION INSTRUCTIONS
 
   SEQ   TIME       CMD  RESP       DESCRIPTION                 VERIF.
-------- ---------- ---- ---- --------------------------------- ------
 
                              LOX SAFING
                              ----------
 
29-154              PLOX CLOX LOX SAFING CREW AT LOX STORAGE    SU73042
                    156       AREA.  PERFORM THE FOLLOWING:
                    CLOX TBC
                    136       1.   CLEAR 150 FT RADUS FROM LOX
                    TBC  NTD       STORAGE AREA FOR G3155 OPERATIONS.
                    NTD  *SCC
                              2.   VERIFY FIRE SUPPORT ON-SITE AT
                                   LOX STORAGE AREA AND MEDICAL ON
                                   STANDBY AT FIRE STATION NO. 2.
                                   PLOX PERFORM COMM CHECK WITH
                                   FIRE SUPPORT AND *SCC ON RADIO
                                   NET 105/205.  VERIFY LOX STORAGE
                                   AREA WARNING LIGHTS ON AND
                                   FLASHING AMBER.
 
29-155              PLOX CLOX CONTROL AREA ESTABLISHED AND WARNING
                    156       LIGHTS ON, FLASHING AMBER.  FIRE
                    CLOX TBC  SUPPORT ON SITE AND EMERGENCY
                    136       MEDICAL ON STANDBY AT FIRE STATION
                    TBC  NTD  NO. 2.  REQUEST SAFETY CONCURRENCE
                    232       TO PROCEED WITH LOX SYSTEM SAFING.
                    NTD  *SCC
 
29-156              *SCC NTD  YOU HAVE SAFETY CONCURRENCE TO
                    232       PROCEED WITH LOX SYSTEM SAFING
                    NTD  TBC  PER OMI G3155.
                    TBC  CLOX
                    136
                    CLOX PLOX
                    156
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
80
 
VOLUME 3 OF 5                                        OMI NO. - S0007VL3
DATE: 07-08-99                                       REV.    - BF-1
 
                        OPERATION INSTRUCTIONS
 
   SEQ   TIME       CMD  RESP       DESCRIPTION                 VERIF.
-------- ---------- ---- ---- --------------------------------- ------
 
                                             NOTE
 
                                   PERFORM NEXT TWO STEPS IF
                                   EXTENDED HOLD GREATER THAN
                                   24 HOURS.
 
29-189              OTC  *PAD PERFORM LOCK INSTALLATION ON SIDE
                    132       HATCH JETTISON "T" HANDLE BOX:
 
                              1.   REMOVE V070-660385-008 PIN/FLAG
                                   FROM "T" HANDLE BOX.
 
                              2.   SA-26R-124 COMBINATION LOCK
 
                                                OK TO INSTALL   T:______
                                                                  SS2
 
                                   INSTALL SA-26R-124 COMBINATION
                                   LOCK ON "T" HANDLE BOX.
 
                                   TIR NO.__________
 
                              3.   RETAIN V070-660385-008 PIN/FLAG
                                   FOR REINSTALLATION.
                                                                T:______
 
                                                NOT PERFORMED     ______
 
29-190              *PAD OTC  SIDE HATCH "T" HANDLE BOX LOCK    SU73002
                    132       INSTALLATION COMPLETE.
 
                                                NOT PERFORMED     ______
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
                                                                      91
 
VOLUME 3 OF 5                                        OMI NO. - S0007VL3
DATE: 07-08-99                                       REV.    - BF-1
 
                        OPERATION INSTRUCTIONS
 
   SEQ   TIME       CMD  RESP       DESCRIPTION                 VERIF.
-------- ---------- ---- ---- --------------------------------- ------
 
                              LOX STORAGE AREA SAFING COMPLETE
                              --------------------------------
 
                                             NOTE
 
                                   HAZARDOUS OPERATIONS COMPLETE.
 
29-191              PLOX CLOX LOX SYSTEM SAFING COMPLETE.       SU73042 |
                    156       STORAGE CONTROL AREA IS OPENED    SU73043 |
                    CLOX TBC  FOR CONTROLLED WORK. "E" ROAD     SU73053 |
                    136       WILL REMAIN CLOSED UNTIL LOX DUMP         |
                    TBC  NTD  BASIN BOILOFF COMPLETE.                 -1|
                    232       PROCEEDING WITH STORAGE AREA
                    NTD  *SCC SECURING.
 
29-192              *PSE *SCC FIRE COMBAT CREW AT LOX STORAGE   FIRE
                    NET       AREA MAY BE RELEASED BACK TO
                    105       PAD A/B GATE TO SUPPORT OPERATIONS.
                    *SCC NTD  FIRE COMBAT CREW AT LH2 STORAGE
                    232       AREA TO REMAIN AT LH2 STORAGE AREA
                    NTD  STM  FOR CONTINUED SAFING/SECURING
                    STM  JSTC OPERATIONS.
                    111
                    JSTC JFIR
                    114
 
29-193   +01H15M    JBWC STM  PADLOCKS REMOVED, SS HYDRAULIC    WSSA
                    111       LOCKING VALVES CLOSED AND         SU73033
                    STM  NTD  PADLOCKS REINSTALLED.  SAFING TEAM
                    232       CLEARING AREA.
                    NTD  *SCC
                    *SCC *PSE
                    NET
                    105
 
29-194              *PSE *SCC SOUND SUPPRESSION SAFING TEAM HAS
                    NET       CLEARED PAD (TANK NOT DRAINED).
                    105
                    *SCC NTD
                    232
 
29-195   +01H20M    CPVD OTC  ECS CONTROL STATION TRANSFER AND  SU73031
                    132       HAZARDOUS GN2 PURGE TERMINATION
                              COMPLETE.
 
 
 
 
 
 
92
 
VOLUME 3 OF 5                                        OMI NO. - S0007VL3
DATE: 07-08-99                                       REV.    - BF-1
 
                        OPERATION INSTRUCTIONS
 
   SEQ   TIME       CMD  RESP       DESCRIPTION                 VERIF.
-------- ---------- ---- ---- --------------------------------- ------
 
                              XENON LIGHTS - OFF/GENERATOR REFUEL
                              -----------------------------------
 
                                             NOTE
 
                                   PERFORM NEXT STEP IF
                                   LIGHTS WERE TURNED ON.
 
29-209   +01H50M    NTD  STM  PROVIDE PERSONNEL AND TURN OFF    SU73056
                    232       PAD XENON LIGHTS AND/OR REFUEL          -1|
                    STM  JSTC GENERATORS.                       ELEC    |
                    111
 
                                                NOT PERFORMED     ______
 
                              ESSENTIAL PERSONNEL
                              -------------------
                                                  JBOSC   JCI
                                                  -----   ---
 
                              TECHS                6       1
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
                                                                      97
 
VOLUME 3 OF 5                                        OMI NO. - S0007VL3
DATE: 07-08-99                                       REV.    - BF-1
 
                        OPERATION INSTRUCTIONS
 
   SEQ   TIME       CMD  RESP       DESCRIPTION                 VERIF.
-------- ---------- ---- ---- --------------------------------- ------
 
                              DESTOW TIME CRITICAL ITEMS
                              --------------------------
 
                                             NOTE
 
                                   PERFORM NEXT STEP IF EXPERIMENTS/
                                   ITEMS MUST BE CHANGED OUT FOR
                                   EXTENDED HOLD OPERATIONS.
 
29-210   +01H50M    OTC  *PAD PERFORM DESTOWAGE OF FCE TIME     SU73007
                    132       CRITICAL ITEMS PER TPS FCS-_____
 
                              ESSENTIAL PERSONNEL
                              -------------------
 
                                             ORB  NASA
                                             ---  ----
                              ENGR            1    1
                              QUAL            1    1
                              TECH            2
 
                                             NASA   BOEING
                                             ----   ------
                              NASA OPS        2
                              NASA PL ENGR    2
                              NASA QUALITY    1
                              PL TECH                4
 
                                                NOT PERFORMED     ______
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
98
 
VOLUME 3 OF 5                                        OMI NO. - S0007VL3
DATE: 07-08-99                                       REV.    - BF-1
 
                        OPERATION INSTRUCTIONS
 
   SEQ   TIME       CMD  RESP       DESCRIPTION                 VERIF.
-------- ---------- ---- ---- --------------------------------- ------
 
29-242              STM  JSTC 150 PSIG GN2 FOR LO2/LH2 TSM      PNU
                    111       PURGE PANEL NO LONGER REQUIRED.
                    JSTC GSPN
                    114       SECURE CONTROL STATION PER OPERATION
                              INSTRUCTIONS OF M3703.  RELEASE
                              PNEUMATIC PERSONNEL AT INDUSTRIAL
                              SUPPLY INTERFACE.  (30 MIN)
                              RELEASE GN2 PRODUCTION PLANT.
 
                                                NOT PERFORMED     ______
 
29-243              CLHY TBC  G3251 OPERATION SUPPORT SETUP 4 - SU73048
                    136       LH2 FLARE STACK EXTINGUISH A3306
                    TBC  NTD  (STORAGE TANK VENT) VALVE CLOSING,
                    232       AND SECURING T-0 GHE AND LH2 ORB/
                              ET CARRIER PLATE PURGES COMPLETE.
 
29-244              PLHY CLHY HAZARDOUS LH2 OPERATIONS COMPLETE  SU73046
                    166       IN LH2 STORAGE AREA.  LH2               -1|
                    CLHY TBC  STORAGE AREA AND EAST PERIMETER           |
                    136       ROAD ARE OPEN FOR CONTROLLED WORK.        |
                    TBC  NTD                                            |
                    232
                    NTD  *SCC
 
29-245                        DELETED                                 -1|
 
29-246              CLHY TBC  FIRE COMBAT CREW AT LH2 STORAGE   FIRE
                    136       MAY BE RELEASED.  ONE FIRE COMBAT
                    TBC  NTD  CREW WILL REMAIN AT FIRE STATION
                    232       NO. 6 TO SUPPORT CONTINUED SCRUB/
                    NTD  *SCC TURNAROUND ACTIVITIES.
                         STM
                    STM  JSTC
                    111
                    JSTC JFIR
                    114
 
 
 
 
 
 
 
 
 
 
 
 
 
                                                                     107
 
VOLUME 3 OF 5                                        OMI NO. - S0007VL3
DATE: 07-08-99                                       REV.    - BF-1
 
                        OPERATION INSTRUCTIONS
 
   SEQ   TIME       CMD  RESP       DESCRIPTION                 VERIF.
-------- ---------- ---- ---- --------------------------------- ------
 
                              WEATHER UPDATE
                              --------------
 
29-247              NTD  STM  REQUEST CURRENT WEATHER AND       SU73064
                    232       FORECAST FOR __ HR TURNAROUND.
 
29-248              STM  JBDY REQUEST CURRENT WEATHER AND FORECAST
                    111       FROM RANGE WX TO INCLUDE SEVERE
                              WEATHER FORECAST THRU TANKING AND
                              LAUNCH WEATHER OUTLOOK.
 
29-249              JBDY *WEA PERFORM FOLLOWING:
                    231
                    111  STM  1.   TANKING WEATHER OUTLOOK
                    STM  NTD
                    232            __________(GOOD/BAD/MARGINAL)
 
                              2.   LAUNCH WEATHER OUTLOOK
 
                                   __________(GOOD/BAD/MARGINAL)
 
                              3.   CURRENT FORECAST THRU
                                   L- 8HR 20 MIN (T-6 HR):
 
                                   A.  ELECTRICAL STORMS WITHIN
 
                                       5 NM__________(YES/NO)
 
                                       IF YES, TIMING__________
 
                                   B.  PRECIPITATION__________
                                       (LIGHT/MEDIUM/HEAVY)
 
                                       IF ANY PRECIP,
 
                                       TIMING__________
 
                                   C.  HAIL__________(YES/NO)
 
                                   D.  WIND DIRECTION__________
 
                                       SPEED__________
 
                                   E.  TEMPERATURE RANGE__________
 
                                   F.  RH RANGE__________
 
 
 
 
108
 
VOLUME 3 OF 5                                        OMI NO. - S0007VL3
DATE: 07-08-99                                       REV.    - BF-1
 
                        OPERATION INSTRUCTIONS
 
   SEQ   TIME       CMD  RESP       DESCRIPTION                 VERIF.
-------- ---------- ---- ---- --------------------------------- ------
 
30-000   +00H00M              INITIAL SCRUB
                              -------------
 
                                             WARNING
 
                                   THIS SEQUENCE CONTAINS
                                   MULTIPLE/PARALLEL HAZARDOUS
                                   OPERATIONS.  ALL ESSENTIAL
                                   PERSONNEL WILL BE BRIEFED
                                   ON HAZARDS THAT ARE PRESENT
                                   FOR THAT TASK AND APPLICABLE
                                   SEQUENCES OF APPENDIX Z.  THIS
                                   BRIEFING MUST BE REPEATED FOR
                                   EACH SHIFT CHANGE.
 
                                             NOTE
 
                                   OPERATIONS INVOLVING CRIT 1,
                                   1R AND/OR 1S ITEMS ARE CONTAINED
                                   IN THE FOLLOWING SEQUENCE/STEPS.
 
                                   THIS SEQUENCE INITIATES A
                                   SCRUB ANYTIME AFTER ET CRYO
                                   TANKING HAS BEEN INITIATED.
                                   DO NOT PERFORM THIS SEQUENCE
                                   IF COUNTDOWN IS ON HOLD PRIOR
                                   TO ET CRYO TANKING.
 
                                   THIS SEQUENCE MUST BE
                                   INITIATED, BUT IS NOT REQUIRED
                                   TO BE COMPLETE PRIOR TO ENTERING
                                   ANY OF THE FOLLOWING
                                   TURNAROUND SEQUENCES:
 
                                   1.  SEQ 31 FOR 24 HR DELAY/SCRUB
                                       TURNAROUND
 
                                   2.  SEQ 32 FOR 48 HR OR LONGER
                                       SCRUB TURNAROUND
 
                                   3.  SEQ 35 FOR LAUNCH SCRUB AND
                                       SECURE
 
                                ENTIRE SEQUENCE NOT PERFORMED     ______
 
 
 
 
 
 
                                                                     111
 
VOLUME 3 OF 5                                        OMI NO. - S0007VL3
DATE: 07-08-99                                       REV.    - BF-1
 
                        OPERATION INSTRUCTIONS
 
   SEQ   TIME       CMD  RESP       DESCRIPTION                 VERIF.
-------- ---------- ---- ---- --------------------------------- ------
 
30-001              NTD  OTC  PROCEED WITH INITIAL SCRUB
                    232  TBC  TURNAROUND OPERATIONS.
                         PTC
                         STM
                         *SCC
                         LPS
 
30-002              LRD  *DCD A SCRUB HAS BEEN DECLARED.  RTLS
                    135  ROC  AND ABORT LANDING SITE SUPPORT IS
                    CCN  EMS  RELEASED.  DOD JOLLYS REMAIN
                    LF1  STM  ON STATION UNTIL FLIGHT CREW AND
                         NCC  CLOSEOUT CREW EGRESS PAD.
                         LSO
                         GOMS
                         *SLF
 
                                             CAUTION                  -1|
                                                                        |
                                   FOR IUS MISSIONS ONLY, PAYLOAD       |
                                   PRIMARY POWER MUST REMAIN ON FROM    |
                                   IUS POWER ON THROUGH LAUNCH.  IF     |
                                   PAYLOAD PRIMARY MAIN C IS LOST       |
                                   BEFORE L-20 MINUTES, IUS WILL        |
                                   POWER DOWN.  IUS COUNTDOWN MUST      |
                                   BE REPEATED.  AFTER L-20 MINUTES,    |
                                   IUS WILL SWITCH TO ASE BATTERIES     |
                                   AND WILL BE NO-GO FOR LAUNCH.        |
                                                                        |
                                   SHOULD ANY LOSS OF P/L PRI           |
                                   MN C OCCUR, NOTIFY PTC               |
                                   IMMEDIATELY.  DO NOT REAPPLY         |
                                   P/L PRIMARY POWER WITHOUT            |
                                   NOTIFYING PTC.                       |
                                                                        |
                                             NOTE                       |
                                                                        |
                                   PERFORM NEXT STEP FOR                |
                                   IUS/AXAF (STS-93).                   |
                                                                        |
30-002A             PTC  ICTC PROCEED TO SEQ 33 - PAYLOAD SCRUB       -1|
                    134       TURNAROUND AND VERIFY READY TO            |
                              PERFORM PAYLOAD TURNAROUND OPERATIONS.    |
                                                                        |
                                                NOT PERFORMED     ______|
 
 
 
 
 
 
112
 
VOLUME 3 OF 5                                        OMI NO. - S0007VL3
DATE: 07-08-99                                       REV.    - BF-1
 
                        OPERATION INSTRUCTIONS
 
   SEQ   TIME       CMD  RESP       DESCRIPTION                 VERIF.
-------- ---------- ---- ---- --------------------------------- ------
 
 
                                             NOTE                     -1|
 
                                   PERFORM NEXT STEP IF
                                   PAYLOAD IS POWERED.
 
30-003              PTC  CLES VERIFY READY TO PROCEED WITH PAYLOAD
                    134  DLES TURNAROUND OPERATIONS.
                         KLES
 
                                                NOT PERFORMED     ______
 
30-004   +00H00M    NTD  CGLS SET CDC TO COUNT __H __M          SU73080
                    232  STM  AND START CLOCK COUNTING IN
                    STM  JCTL PLUS (+) TIME.
                    111
 
                                             NOTE
 
                                   PERFORM NEXT TWO STEPS IF
                                   MAINLINE ACTIVE.
 
30-005                   CGLS PFPK5 (CUTOFF) - PRESS
                              VFY PFPK5 LIGHT YELLOW
 
                                                NOT PERFORMED     ______
 
30-006                   CGLS PFPK6 (EXECUTE CUTOFF) - PRESS
                              VFY SAFING IN PROGRESS
 
                                                NOT PERFORMED     ______
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
                                                                   112.1
 
VOLUME 3 OF 5                                        OMI NO. - S0007VL3
DATE: 07-08-99                                       REV.    - BF-1
 
                        OPERATION INSTRUCTIONS
 
   SEQ   TIME       CMD  RESP       DESCRIPTION                 VERIF.
-------- ---------- ---- ---- --------------------------------- ------
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
                    THIS PAGE INTENTIONALLY BLANK
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
112.2
 
VOLUME 3 OF 5                                        OMI NO. - S0007VL3
DATE: 07-08-99                                       REV.    - BF-1
 
                        OPERATION INSTRUCTIONS
 
   SEQ   TIME       CMD  RESP       DESCRIPTION                 VERIF.
-------- ---------- ---- ---- --------------------------------- ------
 
30-086              STM  JBAC SECURE COOLING TOWER SPRAY        HVAA
                    111       SYSTEM.
 
                                                NOT PERFORMED     ______
 
                                             NOTE                     -1|
 
                                   DELETED                              |
 
30-087                        DELETED                                 -1|
 
30-088                        DELETED                                 -1|
 
                                             NOTE
 
                                   PERFORM NEXT STEP IF
                                   COUNTDOWN PROCEEDED PAST
                                   T-20 MINUTES.
 
                              RECYCLE COMPLETE
                              ----------------
 
30-089              OTC  NTD  RECYCLE COMPLETE.
                    TBC  232
                    STM
                    LPS
                    PTC
                                                NOT PERFORMED     ______
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
                                                                     129
 
VOLUME 3 OF 5                                        OMI NO. - S0007VL3
DATE: 07-08-99                                       REV.    - BF-1
 
                        OPERATION INSTRUCTIONS
 
   SEQ   TIME       CMD  RESP       DESCRIPTION                 VERIF.
-------- ---------- ---- ---- --------------------------------- ------
 
                              COCKPIT SECURING
                              ----------------
 
                                             NOTE
 
                                   FLIGHT CREW WILL PERFORM
                                   THIS SECTION PRIOR TO
                                   EGRESSING IF TIME PERMITS.
                                   ASP WILL FINISH ANY SWITCH
                                   ACTIONS POSSIBLE IF FLIGHT
                                   CREW EGRESSES BEFORE
                                   COMPLETION.
 
                                   COMPLETION OF THIS SECTION
                                   IS NOT A CONSTRAINT TO FLIGHT
                                   CREW EGRESS OR LH2 DRAIN BUT
                                   MUST BE PERFORMED IN ITS
                                   ENTIRETY.
 
                              OMS/RCS RECONFIGURATION
                              -----------------------
 
30-090              OTC  PLT  PERFORM OMS/RCS RECONFIGURATION   SU73091
                    212       PER YOUR CHECKLIST.
 
30-091   +00H15M         PLT  PANEL O8
                              LEFT OMS
                                TANK ISOLATION
                                  A SW - GPC
                                  A TB OP
                                  B SW - GPC
                                  B TB OP
 
                                LEFT OMS CROSSFEED
                                  A SW - GPC
                                  A TB CL
                                  B SW - GPC
                                  B TB ___ ("CLOSED" IF COUNT PASSED
                                            T-15M)
 
 
 
 
 
 
 
 
 
 
 
130
 
VOLUME 3 OF 5                                        OMI NO. - S0007VL3
DATE: 07-08-99                                       REV.    - BF-1
 
                        OPERATION INSTRUCTIONS
 
   SEQ   TIME       CMD  RESP       DESCRIPTION                 VERIF.
-------- ---------- ---- ---- --------------------------------- ------
 
30-208              LPS  JRPS RECONFIGURE KMTS 0505A2 (A5,A6)         -1|
                              TO OI 128KB H/L.                          |
 
                                                NOT PERFORMED     ______
 
30-209              LPS  JRPS RECONFIGURE KMTS 0505A1(A7,A8,A9)
                              BIT SYNCS TO SOURCE 1.
                              (MANUAL MODE, SOURCE 1, 60 KB)
                                                NOT PERFORMED     ______
 
                              COMM TO LOW POWER
                              -----------------
 
                                             NOTE
 
                                   DO NOT PROCEED WITH COMM
                                   TO LOW POWER AND CCMS
                                   COMMANDING UNTIL OARE
                                   POWER DOWN IS COMPLETE.
 
30-210   +01H05M    CCSE OTC  READY TO PROCEED WITH COMM SYSTEM SU73109
                    132       CONFIGURE FOR LOW POWER.  CCSE TO
                    OTC  NTD  SUPPORT ON CH 232.  STANDBY FOR
                    232       TRANSFER OF UPLINK CMDS FROM MCCH
                    NTD  *FLT TO CCMS.
 
30-211              NTD  LPS  CONFIGURE UPLINK FEP TO MILA
                    232       WITH CMD AUTHENTICATION ON.
 
30-212              LPS  C1MC I DA UPLK
                              A DA UPLK OV___ CMDA
                              VERIFY RCVS CONNECTIONS.
 
30-213              NTD  *MIL PERFORM FOLLOWING:
                    232
                              1.   VERIFY:
                                   72 KBPS DATA FROM CCMS
 
                              2.   CONFIGURE FOR CCMS COMMANDS.
 
                              3.   ENCRYPT UPLINK.
 
                              4.   CONFIGURE KSC ASTRO COMM OIS 212
                                   AND 213 TO A/G 1 AND A/G 2.
 
 
 
 
 
 
                                                                     155
 
VOLUME 3 OF 5                                        OMI NO. - S0007VL3
DATE: 07-08-99                                       REV.    - BF-1
 
                        OPERATION INSTRUCTIONS
 
   SEQ   TIME       CMD  RESP       DESCRIPTION                 VERIF.
-------- ---------- ---- ---- --------------------------------- ------
 
30-214              NTD  CCSE VERIFY NSP FRAME SYNC.
 
                              CURSOR CONTROL SELECT:
 
                              1.   PM SYSTEM  (VAA12)
                              2.   CMD PROCESSING
                              3.   UPLINK A
                              4.   TERMINATE (CMD PROCESSING)
                              5.   STDN LO________ GMT
 
                              VERIFY STDN LO ON
                              NSP FRAME SYNC - ON
 
                              6.   PWR AMP OPERATE OFF____ GMT
 
                                   PWR AMP STANDBY OFF ____ GMT
 
                              VERIFY PWR AMP - OFF
 
                                   PWR AMP STBY - OFF
 
                              7.   PRE AMP OFF________ GMT
 
                              VERIFY PRE AMP OFF
 
30-215              NTD  RCRT RACK 8223A6
                              REMOVE PATCH FROM WBTS LINE 2
                              (J19-C&T1 OR J26-C&T2) TO FM OI
                              VIDEO (J237).
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
156
 
VOLUME 3 OF 5                                        OMI NO. - S0007VL3
DATE: 07-08-99                                       REV.    - BF-1
 
                        OPERATION INSTRUCTIONS
 
   SEQ   TIME       CMD  RESP       DESCRIPTION                 VERIF.
-------- ---------- ---- ---- --------------------------------- ------
 
                                             NOTE
 
                                   CRYO DRAIN MUST BE COMPLETE
                                   PRIOR TO APU HEATER DEACTIVATION.
 
                              APU HEATER DEACT
                              ----------------
 
30-368   +02H45M    OTC  CAPU PERFORM APU HEATER DEACTIVATION   SU73092
                    132       PER SEQ 42 (S0007VL4).
 
30-369              CAPU OTC  APU HEATER DEACTIVATION
                              COMPLETE.
 
30-370              STM  JCFM CRYO DRAIN COMPLETE.  PERFORM
                    111       PRINTOUT OF CMDPS MEASUREMENTS.
 
                              PREP FOR GN2 TO AIR CHANGEOVER
                              ------------------------------
 
30-371              NTD  OTC  VERIFY H2 LESS THAN 10,000 (1%)   SU73096
                    232       PPM IN ALL ORBITER AREAS (ET
                    OTC  CHGD INTERTANK, PAYLOAD BAY, MIDBODY,
                    132       AND AFT).
 
30-372   +02H45M    CHGD OTC  H2 CONCENTRATION VERIFIED LESS
                    132       THAN 1 PCT.  VERIFY CLEAR TO
                    OTC  NTD  PROCEED WITH ECS GN2 PURGE
                    232       TRANSFER TO AIR FOR ORB.
                    NTD  *SCC
                    *SCC *PSE
                    NET
                    105
 
30-373              *PSE *SCC YOU HAVE SAFETY CONCURRENCE TO
                    NET       PROCEED WITH ECS GN2 TO AIR
                    105       CHANGEOVER.
                    *SCC NTD
                    232
 
30-374              OTC  CHGD VERIFY HUMS READY TO SUPPORT
                    132       ET LH2 BOILOFF.
 
                              PERFORM CONTINUOUS MONITORING
                              IN ORBITER AFT.  REPORT OUT
                              OF TOLERANCE CONDITIONS IF H2
                              EXCEEDS 10,000 PPM (1%) TO
                              CLHY ON OIS CH 166.
 
 
                                                                     189
 
VOLUME 3 OF 5                                        OMI NO. - S0007VL3
DATE: 07-08-99                                       REV.    - BF-1
 
                        OPERATION INSTRUCTIONS
 
   SEQ   TIME       CMD  RESP       DESCRIPTION                 VERIF.
-------- ---------- ---- ---- --------------------------------- ------
 
30-375                   CHGD BUHGDS REMOTE TERMINAL                  -1|
                                                                        |
                              SELECT ET/IT SAMPLE LINE                  |
 
30-376                   CHGD CURSOR CNTL (SAW01/HWW50)
                              ET INTK
                              XMIT CURSOR KEY - PRESS
 
                              CRT
 
                              VERIFY
 
                              "ET INTK" INVERTED GREEN
 
30-377              CHGD JHGD LCC 3R18 - HUMS CONTROL ROOM
                    177       HUMS REMOTE TERMINAL
 
                              1.   "VEHICLE PAGE" - SELECT
 
                              2.   SOURCES - SELECT "LINES 1-8"
 
                              3.   LINE - SELECT "S/L 5"
 
                              4.   "N2" - SELECT BACKGROUND
 
                                             NOTE
 
                                   PERFORM NEXT STEP IF LD54/55
                                   IS INSTALLED AND ACTIVE.
 
30-378                   CHGD CURSOR CNTL (SAW01/HWW13)
                              SUPPORT MODE
                              LD54/55 PUMP - OFF
                              XMIT CURSOR KEY - PRESS
 
                                                NOT PERFORMED     ______
 
 
 
 
 
 
 
 
 
 
 
 
 
 
190
 
VOLUME 3 OF 5                                        OMI NO. - S0007VL3
DATE: 07-08-99                                       REV.    - BF-1
 
                        OPERATION INSTRUCTIONS
 
   SEQ   TIME       CMD  RESP       DESCRIPTION                 VERIF.
-------- ---------- ---- ---- --------------------------------- ------
 
                              DEACTIVATE ELEVON POSN EMON
                              ---------------------------
 
30-388                   COFC APPL PG (SAB20/SWB02 PG A)
                              PFK13 (ACT EMON SETUP) KEY - PRESS
 
30-389                   COFC CURSOR CNTL (SAB20/SWB02 PG A)
                              I - CIRC PUMPS
                              XMIT CURSOR KEY - PRESS
 
30-390                   COFC APPL PG (SAB20/SWB02 PG A)
                              PFK13 (DE-ACT EMON SETUP) KEY - PRESS
 
                              FUEL CELL DEACTIVATION
                              ----------------------
 
                                             NOTE
 
                                   PERFORM NEXT STEP IF
                                   ESTIMATED HOLD PERIOD IS
                                   GREATER THAN 96 HOURS OR
                                   IF PRSD TANKS REQUIRE
                                   TOP-OFF WITH FUEL CELLS
                                   SHUTDOWN.
 
                                   OMRS S00E00.690
 
                                   CECL TO MONITOR HEAT
                                   LOAD IMPACT DURING NEXT
                                   STEP.
 
                                   MASTER ALARMS WILL OCCUR
                                   DURING FUEL CELL DEACTIVATION.
 
30-391              OTC  CFCP PERFORM FUEL CELL REMOVAL FROM    SU73107
                    132  CEPD MAIN BUSSES AND FUEL CELL SHUTDOWN
                         CECL PER OMI S9001VL2/OMI V1040.003 (1 HR).
 
                              RT OMI LOG NO.__________
 
                                                NOT PERFORMED     ______
 
 
 
 
 
 
 
 
 
                                                                     193
 
VOLUME 3 OF 5                                        OMI NO. - S0007VL3
DATE: 07-08-99                                       REV.    - BF-1
 
                        OPERATION INSTRUCTIONS
 
   SEQ   TIME       CMD  RESP       DESCRIPTION                 VERIF.
-------- ---------- ---- ---- --------------------------------- ------
 
30-392   +03H00M    CPVD OTC  ORBITER "GN2 TO AIR CHANGEOVER,"  SU73099
                    132       OPTION A ACCOMPLISHED.
                    OTC  NTD
                    232
                    NTD  *SCC
                    *SCC *PSE
                    NET
                    105
 
30-392A             PTC  OTC  AFTER CIRCUIT STABILIZES, PERFORM       -1|
                    132       ORBITER OPERATION SUPPORT SETUP 15,       |
                    OTC  CPVD PAYLOAD BAY PURGE VERIFICATION.           |
                         CMQC                                           |
                              NOTIFY PTC IMMEDIATELY IF PURGE           |
                              GOES OUT OF SPEC. (STS-93)                |
                                                                        |
                              MLP O2 MONITOR STATUS
                              ---------------------
 
30-393   +03H00M    NTD  STM  PERFORM MLP O2 MONITOR STATUS.    PWR
                    232       (10 MIN)  REPORT COMPLETION.      SU73166
                    STM  JBEP
                    111
 
30-394              JBEP STM  MLP O2 MONITOR STATUS COMPLETE.   PWR
                    111       RECORD OUT OF LIMITS OR TROUBLE
                    STM  NTD  INDICATIONS (IF ANY):
                    232
                    NTD  *SCC
                              _______________________________
 
                              _______________________________
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
194
 
VOLUME 3 OF 5                                        OMI NO. - S0007VL3
DATE: 07-08-99                                       REV.    - BF-1
 
                        OPERATION INSTRUCTIONS
 
   SEQ   TIME       CMD  RESP       DESCRIPTION                 VERIF.
-------- ---------- ---- ---- --------------------------------- ------
 
                              VENT DOOR RECONFIGURATION               -1|
                              -------------------------
 
30-395              OTC  CPVD RETURN VENT DOORS TO ADVERSE      SU73108
                    132       WEATHER PURGE CONFIGURATION.
 
30-396                   CPVD CURSOR CNTL (VAM31A/VAM09A)
                              RETURN VENT DOORS 1 AND 2
                              (BOTH SIDES) TO PURGE POSITION.
                              CLOSE VENT DOORS 8 AND 9 R/H
 
30-397              CPVD OTC  VENT DOORS IN ADVERSE WEATHER
                              PURGE CONFIGURATION.
 
30-398              OTC  CPVD INCREASE CREW MODULE TEMP TO
                    132       70 +/- 5 DEG F.
                                                                        |
                              RAISE GOX VENT HOOD
                              -------------------
 
                                             NOTE
 
                                   TERMINATE GN2 PURGE
                                   MINIMUM OF 60 MINUTES
                                   AFTER LO2 ECO SENSORS
                                   INDICATE DRY.
 
30-399   +03H00M    TBC  CMEC TERMINATE GN2 PURGE AND RAISE     SU73144
                    136       GOX VENT HOOD PER OMI G2158.
                              COORDINATE WITH GSPN ON CH 114.
                              REPORT COMPLETION.
 
30-400              CMEC TBC  GN2 PURGE HAS BEEN TERMINATED AND
                    136       GOX VENT HOOD RAISED PER G2158.
                    TBC  NTD
                    232
 
                              OMRSD S00E00.520
 
 
 
 
 
 
 
 
 
 
 
 
                                                                     195
 
VOLUME 3 OF 5                                        OMI NO. - S0007VL3
DATE: 07-08-99                                       REV.    - BF-1
 
                        OPERATION INSTRUCTIONS
 
   SEQ   TIME       CMD  RESP       DESCRIPTION                 VERIF.
-------- ---------- ---- ---- --------------------------------- ------
 
                                             NOTE
 
                                   TRACKING OF PERSONNEL
                                   REQUIRING ACCESS FOR NON
                                   STANDARD WORK WILL BE
                                   PERFORMED BY THE NTD AND
                                   ENTERED ON APPENDIX T BY
                                   CMQC.  PRIOR TO THE BDA
                                   FINAL CLEAR OPS/SAFETY
                                   WALKDOWN THIS LIST WILL
                                   BE FORWARDED TO THE NPM FOR
                                   IDENTIFICATION OF AREAS
                                   ACCESSED DURING SCRUB
                                   TURNAROUND OPERATIONS.
 
30-401              NTD  OTC  NOTIFY THE OIC AT THE PAD GATE
                    232       THAT ALL PERSONNEL REQUIRING
                    OTC  *PAD ENTRY INTO THE PAD PERIMETER
                    132       REQUIRES APPROVAL FROM THE NTD
                    *PAD ACM  ON RADIO NET 110.
                    110
 
30-402              NTD  CMQC TRACKING OF NON STANDARD WORK
                              WILL COMMENCE AT THIS TIME.
                              UTILIZING APPENDIX T UNTIL
                              INITIATION OF PAD CLEAR FOR
                              TANKING.
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
196
 
VOLUME 3 OF 5                                        OMI NO. - S0007VL3
DATE: 07-08-99                                       REV.    - BF-1
 
                        OPERATION INSTRUCTIONS
 
   SEQ   TIME       CMD  RESP       DESCRIPTION                 VERIF.
-------- ---------- ---- ---- --------------------------------- ------
 
30-436              *SEC NTD  BDA ROADBLOCKS DISABLED.  PAD     SEC
                    232       NOW CONTROLLED AT PAD GATE.
                    NTD  *SCC
                         OTC
                         TBC
                         STM
                         PTC
                    *SCC *PSE
                    NET
                    105
 
                                             WARNING
 
                                   PTCR AND ECS ROOM IS
                                   PRESSURIZED - DOOR MUST
                                   BE RESTRAINED WHEN
                                   OPENING.
 
                                   PTCR AND ECS ROOM WILL
                                   DEPRESSURIZE WHEN ECS
                                   ROOM DOOR IS OPENED.
 
30-437              NTD  STM  OPEN SOUTH ECS ROOM DOOR AND      HVAA
                    232       RESTRAIN IN OPEN POSITION.        SU73176
                    STM  JBAC
                    111
 
30-438              NTD  *SCC PERFORM O2 LEVEL CHECK OF PTCR
                    232       AND ECS CONTROL ROOM.
                    *SCC *PSE
                    NET
                    105
 
30-439              *PSE *SCC O2 LEVEL CHECKS ACCEPTABLE AND
                    NET       SAFETY CONCURS IN OPENING PTCR/ECS
                    105       ROOMS FOR CONTROLLED WORK.
                    *SCC NTD
                    232
 
                              GN2 ISO VALVE LOCKOUT
                              ---------------------
 
30-440   +03H15M    NTD  OTC  SECURE ECS ROOM GN2 MANUAL        SU73114
                    232  *SCC ISOLATION VALVES PER OMI V1122
                    OTC  CPVD "TERMINATION OF ECS HAZ
                    132       PURGE GN2 OPERATIONS".
                    *SCC *PSE
                    NET       RT OMI LOG NO.__________
                    105
 
                                                                     213
 
VOLUME 3 OF 5                                        OMI NO. - S0007VL3
DATE: 07-08-99                                       REV.    - BF-1
 
                        OPERATION INSTRUCTIONS
 
   SEQ   TIME       CMD  RESP       DESCRIPTION                 VERIF.
-------- ---------- ---- ---- --------------------------------- ------
 
30-441              CLHY TBC  LH2 SAFING CREW AT LH2 STORAGE    SU73157
                    136       AREA.  READY TO BEGIN LH2 STORAGE       -1|
                    TBC  NTD  AREA SECURING.                            |
                    232                                                 |
                    NTD  *SCC
 
30-442              TBC  CLHY ESTABLISH REQUIRED ROADBLOCKS, TURN
                    136       ON AREA HAZARD WARNING LIGHTS TO
                    CLHY PLHY FLASHING AMBER AND CLEAR NONESSENTIAL
                    166       PERSONNEL FROM LH2 STORAGE AREA AND
                              ALL PERSONNEL CLEAR LH2 FLARE STACK
                              AREA.  PERFORM COMMUNICATIONS CHECK
                              ON NET 105 AND BACKUP NET 205.
 
                              ESSENTIAL PERSONNEL
                              -------------------
 
                                           SFOC    NASA    JBOSC
                                           ----   ------   -----
                              SYS ENG        1       1
                              TECH           4
                              SAFETY ENG     1
                              FIRE                           1
 
30-443              PLHY CLHY CLEARS ESTABLISHED.  BARRIERS           -1|
                    166       AND HAZARDOUS WARNING SIGNS
                    CLHY TBC  INSTALLED. FIRE ON SITE.                  |
                    136       REQUEST SAFETY CONCURRENCE TO             |
                    TBC  NTD  PROCEED WITH LH2 STORAGE AREA             |
                    232       SAFING PER OMI S1018.                     |
                    NTD  *SCC                                           |
 
30-444              *SCC NTD  YOU HAVE SAFETY CONCURRENCE TO          -1|
                    232       PROCEED WITH LH2 STORAGE AREA
                    NTD  TBC  SAFING PER OMI S1018.                     |
                    TBC  CLHY
                    136
                    CLHY PLHY
                    166
 
 
 
 
 
 
 
 
 
 
 
214
 
VOLUME 3 OF 5                                        OMI NO. - S0007VL3
DATE: 07-08-99                                       REV.    - BF-1
 
                        OPERATION INSTRUCTIONS
 
   SEQ   TIME       CMD  RESP       DESCRIPTION                 VERIF.
-------- ---------- ---- ---- --------------------------------- ------
 
                              BFS/INSTR SECURING
                              ------------------
 
30-520   +04H20M    CDPS CDR  PANEL C3
                              BFC CRT
                                DISPLAY SW - OFF
 
                                             NOTE                     -1|
 
 
30-521                        DELETED                                 -1|
 
30-522                        DELETED                                 -1|
 
                                             NOTE
 
                                   BFS GPC WILL REMAIN ACTIVE.
                                   PERIODIC AREA 2 FMT 12 DOWNLIST
                                   FRAME COUNT ERRORS AND FDA
                                   MESSAGES ARE EXPECTED.  BFS
                                   GPC ERROR "ILLEGAL ENGAGE/
                                   TERM B" WILL OCCUR IN NEXT
                                   STEP.
 
30-523              CDPS CDR  PANEL O6
                              GENERAL PURPOSE COMPUTER
                                OUTPUT
                                  5 SW - NORMAL
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
                                                                     237
 
VOLUME 3 OF 5                                        OMI NO. - S0007VL3
DATE: 07-08-99                                       REV.    - BF-1
 
                        OPERATION INSTRUCTIONS
 
   SEQ   TIME       CMD  RESP       DESCRIPTION                 VERIF.
-------- ---------- ---- ---- --------------------------------- ------
 
                                             NOTE
 
                                   NEXT TWO STEPS REMOVE FLIGHT
                                   INSTRUMENT POWER TO REDUCE
                                   POSSIBILITY OF INSTRUMENT
                                   FOGGING.  POWER WILL BE
                                   REAPPLIED DURING PRE-INGRESS
                                   SWITCH RECONFIG (T-3 HR).
 
30-524              CDPS CDR  PANEL F6
                              INSTRUMENT POWER SW - OFF
 
30-525              CDPS PLT  PANEL F8
                              INSTRUMENT POWER SW - OFF
 
                                             NOTE
 
                                   PERFORM NEXT THREE STEPS IF
                                   OPS 2 RECORDER HARDLINE DUMP
                                   REQUIRED.
 
30-526              OTC  JRPS SUPPORT CISL ON OIS CH 145.
                    212
                                                NOT PERFORMED     ______
 
30-527              OTC  CISL PERFORM OPS 2 RCDR DATA DUMP
                    212       PER S0007VL4 (SEQ 38).
                              COMPLETION.
                                                NOT PERFORMED     ______
 
30-528              CISL OTC  OPS 2 RCDR DATA DUMP COMPLETE
                    212       (SEQ 38).
                                                NOT PERFORMED     ______
 
30-529              NTD  *SCC ESTABLISH MLP ZERO LEVEL ACCESS
                    232       CONTROLS.
                    *SCC *PSE
                    NET
                    105
 
 
 
 
 
 
 
 
 
 
 
238
 
VOLUME 3 OF 5                                        OMI NO. - S0007VL3
DATE: 07-08-99                                       REV.    - BF-1
 
                        OPERATION INSTRUCTIONS
 
   SEQ   TIME       CMD  RESP       DESCRIPTION                 VERIF.
-------- ---------- ---- ---- --------------------------------- ------
 
31-069                   ASP  PANEL L12L
                              SSP2
                              PDIP POWER 1 CB - CLOSE
 
                              PDIP
                              DC POWER 1 CABIN P/L - ON
 
                                                NOT PERFORMED     ______
 
                              MPS HE GSE SETPOINT COMPLETE
                              ----------------------------
 
31-070   +05H30M    CMPS OTC  MPS HELIUM GSE SET POINT          SU73234
                    132       VERIFICATION COMPLETE.  MPS
                              NO LONGER REQUIRES ACCESS IN MLP
                              COMPARTMENT 44A.
                                                                        |
                              IUS QUIET TIME REQUEST                  -1|
                              ----------------------                    |
                                                                        |
                                             NOTE                       |
                                                                        |
                                   PERFORM THE NEXT FIVE STEPS          |
                                   FOR IUS MISSION (STS-93),            |
                                   IF DIRECTED BY ICTC.                 |
                                                                        |
                                   PERFORM NEXT STEP AT L-16:35.        |
                                                                        |
31-070A             ICTC PTC  READY TO PROCEED WITH RIMU CAL AND        |
                    134       ALIGN.  REQUEST QUIET TIME BE PLACED      |
                    PTC  NTD  IN EFFECT IN 15 MINUTES.                  |
                    232                                                 |
                    NTD  OTC                                            |
                         TBC                                            |
                         STM                                            |
                                                NOT PERFORMED     ______|
 
 
 
 
 
 
 
 
 
 
 
 
 
 
                                                                     295
 
VOLUME 3 OF 5                                        OMI NO. - S0007VL3
DATE: 07-08-99                                       REV.    - BF-1
 
                        OPERATION INSTRUCTIONS
 
   SEQ   TIME       CMD  RESP       DESCRIPTION                 VERIF.
-------- ---------- ---- ---- --------------------------------- ------
 
                                                                        |
                              IUS QUIET TIME START                    -1|
                              --------------------                      |
                                                                        |
                                             NOTE                       |
                                                                        |
                                   FOLLOWING CRITERIA REQUIRED          |
                                   FOR QUIET TIME ACTIVITY:             |
                                                                        |
                                   1.  NO HYDRAULICALLY ACTUATED        |
                                       AEROSURFACE OR SSME TVC          |
                                       MOVEMENT                         |
                                                                        |
                                   2.  NO SRB NOZZLE MOVEMENT           |
                                                                        |
                                   3.  NO MPS 17-INCH DISCONNECT        |
                                       VALVE CYCLES                     |
                                                                        |
                                   4.  NO UNCOORDINATED CABIN           |
                                       ACTIVITY                         |
                                                                        |
                                   5.  NO CHANGES IN PLB PURGE          |
                                       (FLOW RATE OR TEMP)              |
                                                                        |
                                   6.  NO 3,4,5,6,7 OR 9 VENT           |
                                       DOOR OPERATIONS                  |
                                                                        |
                                   7.  NO SSME FRT OR OTHER             |
                                       OPERATIONS RESULTING IN          |
                                       SIMULATED SSME PNEUMATIC         |
                                       SHUTDOWN.                        |
                                                                        |
                                   8.  MAX WIND OF 49 KNOTS             |
                                       (PEAK VELOCITY IN ANY            |
                                       DIRECTION).                      |
                                                                        |
                                   9.  NO MOBILE CRANE OPERATIONS       |
                                                                        |
                                   10. NO ORBITER WEATHER               |
                                       PROTECTION MOVEMENT              |
                                                                        |
                                   11. NO ORBITER CRYOGENIC             |
                                       CHILLDOWN                        |
 
 
 
 
 
 
 
295.1
 
VOLUME 3 OF 5                                        OMI NO. - S0007VL3
DATE: 07-08-99                                       REV.    - BF-1
 
                        OPERATION INSTRUCTIONS
 
   SEQ   TIME       CMD  RESP       DESCRIPTION                 VERIF.
-------- ---------- ---- ---- --------------------------------- ------
 
                                                                        |
                                             NOTE                       |
                                                                        |
                                   PERFORM THE NEXT STEP AT             |
                                   L-16H20M.                            |
                                                                        |
31-070B  -11H00M    NTD  PTC  PROCEED WITH RIMU CAL AND ALIGN.        -1|
         (HOLDING)  232       QUIET TIME IN EFFECT.                     |
                                                                        |
                              OMRSD P018JB.035-C                        |
                                                                        |
                                                NOT PERFORMED     ______|
                                                                        |
                                             NOTE                       |
                                                                        |
                                   DURING RIMU CAL/ALIGN, PTC           |
                                   WILL REQUEST PAYLOAD BAY             |
                                   PURGE, WIND DIRECTION AND            |
                                   VELOCITY DATA EVERY 30 MIN.          |
                                   PTC WILL RECORD THIS DATA            |
                                   IN APPENDIX B (S0007VL4).            |
                                                                        |
31-070C             PTC  OTC  PROVIDE TEMPERATURE, FLOWRATE AND         |
                    132       HUMIDITY OF PAYLOAD BAY PURGE PER         |
                    OTC  CPVD ORBITER OPERATION SUPPORT SETUP 15.       |
                              PTC WILL REQUEST DATA EVERY 30 MIN        |
                              DURING RIMU CAL/ALIGN. NOTIFY PTC         |
                              IMMEDIATELY OF ANY VIOLATIONS.            |
                                                                        |
                                                NOT PERFORMED     ______|
                                                                        |
31-070D             PTC  NTD  REQUEST WIND DIRECTION AND VELOCITY       |
                    232       READING FROM 60 FT WIND TOWERS.           |
                    NTD  STM                                            |
                    STM  JBDY RECORD:                                   |
                    111                                                 |
                    JBDY *WEA WIND DIRECTION__________                  |
                    231                                                 |
                              WIND VELOCITY__________                   |
                                                                        |
                                                NOT PERFORMED     ______|
 
 
 
 
 
 
 
 
 
                                                                   295.2
 
VOLUME 3 OF 5                                        OMI NO. - S0007VL3
DATE: 07-08-99                                       REV.    - BF-1
 
                        OPERATION INSTRUCTIONS
 
   SEQ   TIME       CMD  RESP       DESCRIPTION                 VERIF.
-------- ---------- ---- ---- --------------------------------- ------
 
                              IUS RIMU CAL AND ALIGN START           -1 |
                              ----------------------------              |
                                                                        |
                                             NOTE                       |
                                                                        |
                                   PERFORM NEXT STEP AT L-16H15M.       |
                                                                        |
31-070E  -11H00M    PTC  ICTC PROCEED WITH RIMU CAL AND ALIGN           |
         (HOLDING)  134       PER DOP D290-50020-27. QUIET TIME         |
                              IN EFFECT.  REPORT STATUS OF CAL          |
                              AND ALIGN AS AVAILABLE.                   |
                                                                        |
                                                NOT PERFORMED     ______|
                                                                        |
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
295.3
 
VOLUME 3 OF 5                                        OMI NO. - S0007VL3
DATE: 07-08-99                                       REV.    - BF-1
 
                        OPERATION INSTRUCTIONS
 
   SEQ   TIME       CMD  RESP       DESCRIPTION                 VERIF.
-------- ---------- ---- ---- --------------------------------- ------
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
                    THIS PAGE INTENTIONALLY BLANK
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
                                                                   295.4
 
VOLUME 3 OF 5                                        OMI NO. - S0007VL3
DATE: 07-08-99                                       REV.    - BF-1
 
                        OPERATION INSTRUCTIONS
 
   SEQ   TIME       CMD  RESP       DESCRIPTION                 VERIF.
-------- ---------- ---- ---- --------------------------------- ------
 
                                             NOTE                       |
 
                                   PERFORM SRB IGNITER HEATER
                                   ACTIVATION (L-18) JUST PRIOR
                                   TO L-18H00M IF AMBIENT CONTROL
                                   TEMPERATURE IS LESS THAN
                                   55 DEG F OR FORECAST TO DROP
                                   BELOW 55 DEG F BEFORE T-8H00M.
                                   IF CONTROL TEMPERATURE DROPS
                                   BELOW 55 DEG F, THE IGNITER
                                   HEATERS ARE TO BE ACTIVATED
                                   IMMEDIATELY.
 
                              SRB IGNITER HEATER ACTIVATION (L-18H)
                              -------------------------------------
 
                                                NOT PERFORMED     ______
 
31-071              NTD  TBC  PERFORM SRB IGNITER HEATER POWER  SU73250
                    232       APPLICATION.
                    TBC  CPWR
                    136
 
                                             CAUTION
 
                                   AT NO TIME ARE IGNITER HEATER
                                   CURRENTS TO EXCEED 4.9 AMPS.
 
                                   RSRM IGNITER TEMPERATURE SENSORS
                                   SHALL NOT EXCEED +125 DEG F.
 
31-072                   CPWR CURSOR CNTL (BDE11)
                              AUTO SEQ - IGN
                              XMIT CURSOR KEY - PRESS
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
296
 
VOLUME 3 OF 5                                        OMI NO. - S0007VL3
DATE: 07-08-99                                       REV.    - BF-1
 
                        OPERATION INSTRUCTIONS
 
   SEQ   TIME       CMD  RESP       DESCRIPTION                 VERIF.
-------- ---------- ---- ---- --------------------------------- ------
 
31-079              PLHY CLHY HAZARDOUS LH2 OPERATIONS COMPLETE       -1|
                    166       IN LH2 STORAGE AREA.  LH2 STORAGE         |
                    CLHY TBC  AREA AND EAST PERIMETER ROAD              |
                    136       ARE OPEN FOR CONTROLLED WORK.             |
                    TBC  NTD                                            |
                    232
                    NTD  *SCC
                                                NOT PERFORMED     ______
 
31-080                        DELETED                                 -1|
 
31-081              CLHY TBC  FIRE COMBAT CREW AT LH2 STORAGE   FIRE
                    136       MAY BE RELEASED.  ONE FIRE COMBAT
                    TBC  NTD  CREW WILL REMAIN AT FIRE STATION
                    232       NO. 6 TO SUPPORT CONTINUED SCRUB/
                    NTD  *SCC TURNAROUND ACTIVITIES.
                         STM
                    STM  JSTC
                    111
                    JSTC JFIR
                    114
                                                NOT PERFORMED     ______
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
                                                                     299
 
VOLUME 3 OF 5                                        OMI NO. - S0007VL3
DATE: 07-08-99                                       REV.    - BF-1
 
                        OPERATION INSTRUCTIONS
 
   SEQ   TIME       CMD  RESP       DESCRIPTION                 VERIF.
-------- ---------- ---- ---- --------------------------------- ------
 
31-082              CLHY TBC  LH2 SYSTEM SAFING PER S1018
                    136       COMPLETE.
                    TBC  NTD
                    232
                                                NOT PERFORMED     ______
 
                                             NOTE
 
                                   FOR 24 HOUR SCRUB TURNAROUND,
                                   ET POST DRAIN WALKDOWN (T+4 HR)
                                   AND ET PRE-LAUNCH WALKDOWN
                                   (L-20 HR) ARE SYNONYMOUS AND
                                   ARE PERFORMED CONCURRENTLY.
 
31-083              CTIF TBC  ET POST DRAIN WALKDOWN
                    136       PER S6444 COMPLETE.
                    TBC  NTD
                    232
 
                              OMRSD S00E00.031
                                                NOT PERFORMED     ______
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
300
 
VOLUME 3 OF 5                                        OMI NO. - S0007VL3
DATE: 07-08-99                                       REV.    - BF-1
 
                        OPERATION INSTRUCTIONS
 
   SEQ   TIME       CMD  RESP       DESCRIPTION                 VERIF.
-------- ---------- ---- ---- --------------------------------- ------
 
31-153                        2.   INSPECT SLIDEWIRE AND
CON'T                              EMBARKATION AND LANDING AREAS.
 
                                                                TQV:____
                                                                   SS2
 
                              3.   REMOVE WARNING SIGNS IF POSTED.
 
                                                                T:______
                                                                  SS3
 
                                                NOT PERFORMED     ______
                                                                  SS3
 
                              ESSENTIAL PERSONNEL
                              -------------------
                                          GSS   NASA
                                          ---   ----
 
                              SUPER/ENG    1     1
                              TECH         3
 
                              WSB STEAM VENT HEATER ACTIVATION
                              --------------------------------
 
31-154              OTC  CHYD PERFORM WSB STEAM VENT HEATER
                    132  ASP  ACTIVATION PER S0007 VL4 (SEQ 46 -
                              HYDRAULIC SYSTEM).
 
                              ECS PREP FOR AIR TO GN2
                              -----------------------
                              CHANGEOVER
                              ----------
 
31-155              OTC  CPVD PERFORM PREPARATIONS FOR AIR TO   SU73263
                    132       GNE CHANGEOVER PER OMI V1122.
                              MANUAL GN2 ISOLATION VALVES TO
                              REMAIN CLOSED AND LOCKED. (1 HR)
 
                              RT OMI LOG NO.__________
 
 
 
 
 
 
 
 
 
 
                                                                     327
 
VOLUME 3 OF 5                                        OMI NO. - S0007VL3
DATE: 07-08-99                                       REV.    - BF-1
 
                        OPERATION INSTRUCTIONS
 
   SEQ   TIME       CMD  RESP       DESCRIPTION                 VERIF.
-------- ---------- ---- ---- --------------------------------- ------
 
                              ACTIVATE XENON LIGHTS
                              ---------------------
 
                                             WARNING
 
                                   WHEN XENON LIGHTS ARE
                                   OPERATING, PERSONNEL MUST
                                   AVOID LOOKING DIRECTLY INTO
                                   LIGHTS AS EYE DAMAGE MAY
                                   RESULT.
 
                                             NOTE
 
                                   PERFORM NEXT TWO STEPS IF
                                   XENON LIGHTS REQUIRED TO
                                   SUPPORT EITHER A NIGHTTIME
                                   TANKING OR LAUNCH.
 
31-156   -10H30M    STM  NTD  ATTENTION ON PAD ___:             SU73285
                    232
                    NTD       XENON LIGHTS WILL BE TURNED ON.
                    PA        AVOID LOOKING INTO LIGHTS.  EYE
                              DAMAGE MAY RESULT.
 
                                                NOT PERFORMED     ______
 
31-157   -10H30M    STM  JSTC TURN ON XENON LIGHTS FOR LAUNCH         -1|
                              BORESITE NO. 4, AND TOP           ELEC    |
                              OFF GEN FUEL TANKS.  (30 MIN)
                                                                        |
                                                NOT PERFORMED     ______
 
                              ESSENTIAL PERSONNEL
                              -------------------
 
                                             JCI   NASA
                                             ---   ----
                              TECHS           7
                              SUPVR.          1
                              ENGR                  1
 
 
 
 
 
 
 
 
 
 
328
 
VOLUME 3 OF 5                                        OMI NO. - S0007VL3
DATE: 07-08-99                                       REV.    - BF-1
 
                        OPERATION INSTRUCTIONS
 
   SEQ   TIME       CMD  RESP       DESCRIPTION                 VERIF.
-------- ---------- ---- ---- --------------------------------- ------
 
                              IUS RIMU CAL AND ALIGN COMPLETE         -1|
                              -------------------------------           |
                                                                        |
                                             NOTE                       |
                                                                        |
                                   PERFORM NEXT STEP FOR                |
                                   IUS MISSION (STS-93),                |
                                   IF DIRECTED BY ICTC.                 |
                                                                        |
                                   PERFORM NEXT STEP AT                 |
                                   L-14H05M.                            |
                                                                        |
31-157A             ICTC PTC  IUS RIMU CAL AND ALIGN COMPLETE.          |
                    134       IUS NOW IN GYRO COMPASS MODE.             |
                    PTC  NTD  QUIET TIME NO LONGER REQUIRED.            |
                    232                                                 |
                              OMRSD P018JC.010                          |
                              OMRSD P018JB.035-C                        |
                                                                        |
                                                NOT PERFORMED     ______|
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
                                                                   328.1
 
VOLUME 3 OF 5                                        OMI NO. - S0007VL3
DATE: 07-08-99                                       REV.    - BF-1
 
                        OPERATION INSTRUCTIONS
 
   SEQ   TIME       CMD  RESP       DESCRIPTION                 VERIF.
-------- ---------- ---- ---- --------------------------------- ------
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
                    THIS PAGE INTENTIONALLY BLANK
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
328.2
 
VOLUME 3 OF 5                                        OMI NO. - S0007VL3
DATE: 07-08-99                                       REV.    - BF-1
 
                        OPERATION INSTRUCTIONS
 
   SEQ   TIME       CMD  RESP       DESCRIPTION                 VERIF.
-------- ---------- ---- ---- --------------------------------- ------
 
                              ET OI INSTRUMENTATION AND ET LEVEL
                              ----------------------------------
                              SENSOR CHECKS
                              -------------
 
31-304   -08H30M    NTD  TBC  PERFORM ET OI INSTRUMENTATION     SU73237
                    232       CHECKS AND ET LEVEL SENSOR CHECKS.
 
31-305              TBC  OTC  REQUEST CMPS, CMPL AND CISL SUPPORT
                    132       ON CH 136.
                    OTC  CISL
                         CMPS
                         CMPL
 
31-306              TBC  CISL PERFORM ET OI INSTRUMENTATION CHECKS
                    136  CMPS AND SRM CASE TEMP EMON ACTIVATION
                         CMPL ON CH 145 PER SEQ 38 (S0007VL4).
                              (20 MIN)
 
                              LH2 FR CONFIG FOR LOADING
                              -------------------------
 
31-307              TBC  CLHY PERFORM FIRING ROOM CONFIGURATION
                    136       FOR LOADING PER OMI G3251/OMI G3255.
 
                              VERIFY FIRING ROOM CONSUMABLES          -1|
                              -------------------------------           |
 
31-308   -08H30M         LPS  VERIFY FIRING ROOM CONSUMABLES.         -1|
 
31-309   -08H30M    NTD  STM  FIRE SUPPORT REQUIRED ON          FIRE
                    232       STATION IN 30 MINUTES AT LO2
                    STM  JSTC FACILITY AND LH2 FACILITY.  EMS
                    111       ON STANDBY AT FIRE STATION 2.
                    JSTC JFIR
                    114
 
31-310   -08H30M    TBC  NTD  SFOC SAFETY REQUIRED ON STATION IN
                    232       30 MINUTES AT LH2 FACILITY TO
                    NTD  *SCC SUPPORT FINAL PREPS PER G3251/G3255.
                    *SCC *PSE
                    NET
                    105
 
 
 
 
 
 
 
                                                                     363
 
VOLUME 3 OF 5                                        OMI NO. - S0007VL3
DATE: 07-08-99                                       REV.    - BF-1
 
                        OPERATION INSTRUCTIONS
 
   SEQ   TIME       CMD  RESP       DESCRIPTION                 VERIF.
-------- ---------- ---- ---- --------------------------------- ------
 
                                             NOTE
 
                                   PERFORM NEXT STEP IF ELSA
                                   BOXES WERE RETURNED TO
                                   95 FT AND 195 FT LEVEL
                                   OF FSS.
 
31-311              NTD  STM  REMOVE ELSA BOXES FROM 95 AND 195 FT
                    232       LEVELS OF FSS FOR LAUNCH.
                    STM  JSTC REPORT COMPLETION. (45 MIN)
                    111
                    JSTC *SCB
                    NET
                    104
                                                NOT PERFORMED     ______
 
31-312              NTD  STM  DELIVER REMAINDER OF PAV'S TO
                    232       SLIDEWIRE BUNKER NOT REQUIRED
                    STM  JSTC BY FLIGHT CREW.
                    111
                    JSTC *SCB
 
31-313   -08H30M    JSTC WGSA PROVIDE WRECKER AT PAD GATE.      SU73280
                              (T-8 HOURS TO T-6 HOURS)
                              VERIFY WHEN ON-SITE. (7-4905)
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
364
 
VOLUME 3 OF 5                                        OMI NO. - S0007VL3
DATE: 07-08-99                                       REV.    - BF-1
 
                        OPERATION INSTRUCTIONS
 
   SEQ   TIME       CMD  RESP       DESCRIPTION                 VERIF.
-------- ---------- ---- ---- --------------------------------- ------
 
31-333              NTD  *SCC PERFORM FOLLOWING:                      -1|
                    232  TBC
                    TBC  CLOX 1.   CLEAR NONESSENTIAL PERSONNEL
                    136            150 FT RADIUS FROM STORAGE
                    CLOX PLOX      AREA FOR G3155 OPERATIONS.
                    156            ESSENTIAL PERSONNEL ARE AS
                                   FOLLOWS:
 
                                   PLOX LOX STORAGE AREA, ROVING
                                        LOX LEAD ENGR
                                   PLO2 LOX STORAGE AREA, LOX
                                        SYS ENGR
                                   PLO4 LOX STORAGE AREA, LOX
                                        TECH
                                   PLO5 LOX STORAGE AREA, LOX
                                        TECH
                                   PLO6 LOX STORAGE AREA, LOX           |
                                        TECH
                                   PLO7 LOX STORAGE AREA, LOX           |
                                        TECH
                                   *PSE SFOC SAFETY ENGR
                                   PNQC NASA QC
                                   PNLO NASA ENGR
 
                              2.   VERIFY FIRE SUPPORT ON-SITE
                                   AT PAD AND EMERGENCY MEDICAL
                                   ON STANDBY AT FIRE STATION NO.2.
                                   PLOX PERFORM COMM CHECK WITH
                                   FIRE SUPPORT AND *SCC ON RADIO
                                   NET 105/205. VERIFY LOX
                                   STORAGE AREA WARNING LIGHTS
                                   ON, FLASHING AMBER.
 
                              3.   COVERALLS, FACESHIELDS, NON
                                   SPARKING FOOTWEAR, AND
                                   GLOVES REQUIRED FOR MANUAL
                                   LOX VALVE OPERATORS.  ALL
                                   OTHERS REQUIRE COVERALLS.
 
31-334              NTD       ATTENTION ON PAD ___:
                    PA
                              ALL NONESSENTIAL PERSONNEL CLEAR
                              150 FOOT RADIUS OF LOX STORAGE AREA
                              FOR HAZARDOUS OPERATIONS.
 
 
 
 
 
 
                                                                     371
 
VOLUME 3 OF 5                                        OMI NO. - S0007VL3
DATE: 07-08-99                                       REV.    - BF-1
 
                        OPERATION INSTRUCTIONS
 
   SEQ   TIME       CMD  RESP       DESCRIPTION                 VERIF.
-------- ---------- ---- ---- --------------------------------- ------
 
31-335              PLOX CLOX CONTROL AREA ESTABLISHED AND AREA
                    156       WARNING LIGHTS ON, FLASHING AMBER.
                    CLOX TBC  NONESSENTIAL PERSONNEL ARE CLEAR
                    136       AND ESSENTIAL PERSONNEL ARE PROPERLY
                    TBC  NTD  ATTIRED.  FIRE SUPPORT ON SITE AND
                    232       EMERGENCY MEDICAL ON STANDBY.
                    NTD  *SCC REQUEST SAFETY CONCURRENCE
                              TO PROCEED WITH STORAGE TANK
                              PRESSURIZATION.
 
31-336              *SCC NTD  YOU HAVE SAFETY CONCURRENCE
                    232       TO PROCEED WITH STORAGE TANK
                    NTD  TBC  PRESSURIZATION.
                    TBC  CLOX
                    136
                    CLOX PLOX
                    156
 
31-337              STM  JCFM START REQUIRED RECORDERS.
                    111
 
                                             NOTE
 
                                   DO NOT PERFORM NEXT STEP
                                   IF COUNTDOWN HELD PRIOR
                                   TO ET CRYO LOADING.
 
                              ET LH2 PREPS COMPLETE
                              ---------------------
 
31-338              CLHY TBC  FOLLOWING IN G3255 COMPLETE.      SU73206
                    136                                         SU73215
                    TBC  NTD  1.   ALL PRE-OPS
                    232       2.   LH2 MLP VALVE TORQUING
                              3.   LH2 STORAGE AREA VALVE TORQUING
                              4.   LH2 PAD MECHANICAL
                                   PREPARATIONS FOR LOADING.
                              5.   A3306 (STORAGE TANK VENT)
                                   VALVE OPENING
                              6.   FIRING ROOM CONFIGURATION
                                   FOR LOADING.
                                                NOT PERFORMED     ______
 
31-339              CLHY TBC  READY TO CLEAR CONTROL AREA FOR
                    136       G3251/G3255 LH2 FINAL PREPS,
                    TBC  NTD  HAZARDOUS OPERATIONS.
                    232
 
 
 
372
 
VOLUME 3 OF 5                                        OMI NO. - S0007VL3
DATE: 07-08-99                                       REV.    - BF-1
 
                        OPERATION INSTRUCTIONS
 
   SEQ   TIME       CMD  RESP       DESCRIPTION                 VERIF.
-------- ---------- ---- ---- --------------------------------- ------
 
                              LH2 FINAL PREPS                         -1|
                              ---------------                           |
                                                                        |
31-340              CLHY TBC  READY TO CLEAR CONTROL AREA FOR         -1|
                    136       G3255 LH2 FINAL PREPS, HAZARDOUS          |
                    TBC  NTD  OPERATIONS.                               |
                    232                                                 |
                                                                        |
31-341              NTD  TBC  PERFORM FOLLOWING:                      -1|
                    232                                                 |
                    TBC  CLHY 1.   CLEAR NONESSENTIAL PERSONNEL         |
                    136            200 FT RADIUS FROM STORAGE           |
                    CLHY PLHY      AREA FOR G3255 OPERATIONS.           |
                    166            ESSENTIAL PERSONNEL ARE AS           |
                                   FOLLOWS:                             |
                                                                        |
                              PLHY LH2 STORAGE AREA, ROVING LH2 LEAD ENG|
                              PLH2 LH2 STORAGE AREA, LH2 SYS ENG        |
                              PLH4 LH2 STORAGE AREA, LH2 TECH           |
                              PLH5 LH2 STORAGE AREA, LH2 TECH           |
                              *PSE SFOC SAFETY ENG                      |
                              PNQC PAD, QC (NASA)                       |
                              PNLH PAD, LH2 ENG, (NASA)                 |
                                                                        |
                              2.   VERIFY FIRE SUPPORT ON-SITE          |
                                   AND LH2 STORAGE AREA WARNING         |
                                   LIGHTS ON, FLASHING AMBER.           |
                                                                        |
                              3.   COVERALLS, FACESHIELDS, NON          |
                                   SPARKING FOOTWEAR, AND GLOVES        |
                                   REQUIRED FOR MANUAL LH2 VALVE        |
                                   OPERATORS.  ALL OTHERS REQUIRE       |
                                   COVERALLS.                           |
                                                                        |
31-341A             PLHY CLHY VERIFY EMERGENCY MEDICAL SUPPORT        -1|
                    166       ON STANDBY AT LC-39 FIRE STATION          |
                    CLHY TBC  NO. 2 AND CRASH TRUCK-CFR ON SITE         |
                    136       AT LH2 STORAGE AREA.                      |
                    TBC  NTD                                            |
                    NTD  *SCC                                           |
                    232                                                 |
                                                                        |
31-341B             NTD       ATTENTION ON PAD ___:                     |
                    PA                                                  |
                              ALL NONESSENTIAL PERSONNEL CLEAR          |
                              200 FT RADIUS OF LH2 STORAGE AREA         |
                              FOR HAZARDOUS OPERATIONS.                 |
 
 
 
                                                                     373
 
VOLUME 3 OF 5                                        OMI NO. - S0007VL3
DATE: 07-08-99                                       REV.    - BF-1
 
                        OPERATION INSTRUCTIONS
 
   SEQ   TIME       CMD  RESP       DESCRIPTION                 VERIF.
-------- ---------- ---- ---- --------------------------------- ------
 
31-342              PLHY CLHY CONTROL AREA ESTABLISHED AND            -1|
                    166       WARNING LIGHTS ON, FLASHING               |
                    CLHY TBC  AMBER.  NONESSENTIAL PERSONNEL            |
                    136       CLEAR AND ESSENTIAL PERSONNEL             |
                    TBC  NTD  PROPERLY ATTIRED.  FIRE                   |
                    232       SUPPORT ON SITE AND EMERGENCY             |
                    NTD  *SCC MEDICAL ON STANDBY.                       |
                                                                        |
31-342A             NTD  TBC  PERFORM LH2 FINAL PREPS FOR VEHICLE     -1|
                    232       LOADING PER OMI G3255.                    |
                    TBC  CLHY                                           |
                    136                                                 |
                                                                        |
                              CONFIG CREW COMPARTMENT
                              -----------------------
                              AND WHITE ROOM
                              --------------
 
                                             NOTE
 
                                   DO NOT PERFORM NEXT STEP
                                   IF BUS SENSORS ALREADY
                                   IN MONITOR POSITION.
 
31-343              OTC  ASP  PANEL R1                          SU73241
                    132       POWER DISTRIBUTION
                                AC BUS SNSR
                                  1 SW - OFF, 1 SEC, MONITOR
                                  2 SW - OFF, 1 SEC, MONITOR
                                  3 SW - OFF, 1 SEC, MONITOR
 
                                                NOT PERFORMED     ______
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
374
 
VOLUME 3 OF 5                                        OMI NO. - S0007VL3
DATE: 07-08-99                                       REV.    - BF-1
 
                        OPERATION INSTRUCTIONS
 
   SEQ   TIME       CMD  RESP       DESCRIPTION                 VERIF.
-------- ---------- ---- ---- --------------------------------- ------
 
                              IUS RIMU CAL AND ALIGN STATUS           -1|
                              -----------------------------             |
                                                                        |
                                             NOTE                       |
                                                                        |
                                   PERFORM NEXT STEP FOR                |
                                   IUS MISSION (STS-93),                |
                                   IF DIRECTED BY ICTC.                 |
                                                                        |
                                   PERFORM NEXT STEP AT                 |
                                   L-13H35M.                            |
                                                                        |
                                   IF CONTINGENCY CAL AND ALIGN         |
                                   ON IUS NAV SYSTEMS IS REQUIRED,      |
                                   IT WILL BE INITIATED AT              |
                                   CONCLUSION OF ET LH2/LO2             |
                                   TANKING.                             |
                                                                        |
31-365A             ICTC PTC  REPORTING SUCESS/FAIL CRITERIA          -1|
                    134       OF RIMU CAL AND ALIGNMENT.                |
                    PTC  NTD  CONTINGENCY RIMU CAL AND ALIGN            |
                    232       WILL/WILL NOT BE REQUIRED.                |
                                                                        |
                                                NOT PERFORMED     ______|
                                                                        |
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
                                                                   384.1
 
VOLUME 3 OF 5                                        OMI NO. - S0007VL3
DATE: 07-08-99                                       REV.    - BF-1
 
                        OPERATION INSTRUCTIONS
 
   SEQ   TIME       CMD  RESP       DESCRIPTION                 VERIF.
-------- ---------- ---- ---- --------------------------------- ------
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
                    THIS PAGE INTENTIONALLY BLANK
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
384.2
 
VOLUME 3 OF 5                                        OMI NO. - S0007VL3
DATE: 07-08-99                                       REV.    - BF-1
 
                        OPERATION INSTRUCTIONS
 
   SEQ   TIME       CMD  RESP       DESCRIPTION                 VERIF.
-------- ---------- ---- ---- --------------------------------- ------
 
                                             WARNING
 
                                   GN2 WILL FLOW INTO ORBITER
                                   FWD, PAYLOAD BAY AND AFT PURGE
                                   CIRCUITS.  BREATHING OF
                                   NITROGEN GAS FROM ORBITER
                                   COMPARTMENT PURGE CAN BE
                                   LETHAL.
 
31-375   -07H30M    NTD  OTC  PROCEED WITH ECS AIR-TO-GN2
                    232       CHANGEOVER BY CONTINUING V1122
                    OTC  CPVD "AIR-TO-GN2 STANDBY MODE/AIR TO
                    132       GN2 CHANGEOVER" USING OPTION B -
                              GN2 CHANGEOVER).  COORDINATE
                              WITH GSPN ON OIS CH 172.
 
                              RT OMI LOG NO.__________
 
31-376              NTD       ATTENTION ON PAD___:
                    PA
                              ORBITER AIR-TO-GN2 PURGE CHANGEOVER
                              WILL BEGIN MOMENTARILY.  GN2 PURGE
                              WILL BE APPLIED TO AFT FUSELAGE,
                              PAYLOAD BAY AND FWD PLENUM FUSELAGE.
 
31-377              STM  JBEP AIR TO GN2 CHANGEOVER IN          PWR
                    111       PROGRESS.  POSSIBILITY OF LOW
                              LEVEL O2 ALARM.  ADVISE STM
                              IF ALARMS OCCUR.
 
31-378              CPVD OTC  ECS AIR TO GN2 CHANGEOVER (OPTION B)
                    132  CHGD COMPLETE (V1122).  ORBITER BEING
                    OTC  NTD  PURGED WITH GN2 AT __________
                    232       (RECORD TIME).
                    NTD  *SCC
 
                                                                        |
31-378A             PTC  OTC  AFTER CIRCUIT STABILIZES, PERFORM       -1|
                    132       ORBITER OPERATION SUPPORT SETUP 15,       |
                    OTC  CPVD PAYLOAD BAY PURGE VERIFICATION.           |
                         CMQC                                           |
                              NOTIFY PTC IMMEDIATELY IF PURGE           |
                              GOES OUT OF SPEC. (STS-93)                |
 
 
 
 
 
 
 
                                                                     387
 
VOLUME 3 OF 5                                        OMI NO. - S0007VL3
DATE: 07-08-99                                       REV.    - BF-1
 
                        OPERATION INSTRUCTIONS
 
   SEQ   TIME       CMD  RESP       DESCRIPTION                 VERIF.
-------- ---------- ---- ---- --------------------------------- ------
 
31-379              LRD  BRD  REPORT WX STATUS FOR RETRIEVAL FORCES.  -1|
                    135
                              WEATHER CONDITIONS ARE:
 
                              SEA STATE:__________
 
                              SEA TEMP:__________
 
                              AIR TEMP:__________
 
                              WINDS:__________
 
                              VISIBILITY:__________
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
387.1
 
VOLUME 3 OF 5                                        OMI NO. - S0007VL3
DATE: 07-08-99                                       REV.    - BF-1
 
                        OPERATION INSTRUCTIONS
 
   SEQ   TIME       CMD  RESP       DESCRIPTION                 VERIF.
-------- ---------- ---- ---- --------------------------------- ------
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
                    THIS PAGE INTENTIONALLY BLANK
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
                                                                   387.2
 
VOLUME 3 OF 5                                        OMI NO. - S0007VL3
DATE: 07-08-99                                       REV.    - BF-1
 
                        OPERATION INSTRUCTIONS
 
   SEQ   TIME       CMD  RESP       DESCRIPTION                 VERIF.
-------- ---------- ---- ---- --------------------------------- ------
 
31-380              LRD  LD   INITIAL STATUS INDICATES RETRIEVAL
                    135       FORCES/WX GO FOR LAUNCH.
 
                              OPEN ORBITER VENT DOORS
                              -----------------------
                              1 AND 2 (CONTINGENCY)
                              ---------------------
 
                                             NOTE
 
                                   IF O2 CONCENTRATION IN
                                   OAA WHITE ROOM BECOMES
                                   LESS THAN 20 PCT AS
                                   INDICATED ON W/R O2 METER
                                   (OTV CAM 005/105), PERFORM
                                   NEXT THREE STEPS TO OPEN
                                   LEEWARD VENT DOORS 1&2.
 
31-381   -07H15M    NTD  OTC  O2 CONCENTRATION WITHIN OAA LESS
                    232       THAN 20 PCT, OPEN ORBITER VENT
                    OTC  CPVD DOORS 1 AND 2 ON LEEWARD SIDE.
                    132       REPORT COMPLETION.
 
                                                NOT PERFORMED     ______
 
31-382                   CPVD CURSOR CNTL (VAM31A/VAM09A)
                              VENT DOORS 1&2 (LEEWARD)
                              OPEN TARGET
                              XMIT CURSOR KEY - PRESS
 
                                                NOT PERFORMED     ______
 
31-383              CPVD OTC  LEEWARD VENT DOOR OPENING COMPLETE.
                    132
                    OTC  NTD
                    232
                                                NOT PERFORMED     ______
 
 
 
 
 
 
 
 
 
 
 
 
 
388
 
VOLUME 3 OF 5                                        OMI NO. - S0007VL3
DATE: 07-08-99                                       REV.    - BF-1
 
                        OPERATION INSTRUCTIONS
 
   SEQ   TIME       CMD  RESP       DESCRIPTION                 VERIF.
-------- ---------- ---- ---- --------------------------------- ------
 
                                             NOTE
 
                                   PERFORM NEXT STEP IF O2
                                   CONCENTRATION IN WHITE ROOM
                                   STILL LESS THAN 20 PCT AFTER
                                   CPVD OPENED LEEWARD VENT DOORS.
 
31-384              OTC  *FCM WHITE ROOM
                    132
                              1.   EXHAUST FAN SW - ON
 
                              2.   POSITION REAR SWINGING DOORS
                                   IN OPEN POSITION AND SECURE.
 
                                                NOT PERFORMED     ______
 
                                             NOTE
 
                                   IF PREVIOUS FOUR STEPS DO NOT
                                   SOLVE LESS THAN 20 PCT O2
                                   CONCENTRATION PROBLEM,
                                   PERFORM NEXT FOUR STEPS TO
                                   OPEN WINDWARD VENT DOORS
                                   1 AND 2 ONLY IF WIND CONDITION
                                   IS LESS THAN 18 KTS AND NO RAIN
                                   EXPECTED.  REF OMRS V05AG0.060
 
31-385              NTD  *FLT REQUEST CONCURRENCE TO OPEN
                    232       WINDWARD VENT DOORS 1 AND 2.
 
                                                NOT PERFORMED     ______
 
31-386              NTD  OTC  OPEN WINDWARD VENT DOORS 1 AND 2.
                    232
                    OTC  CPVD
                    132
                                                NOT PERFORMED     ______
 
31-387                   CPVD CURSOR CNTL (VAM31A/VAM09A)
                              VENT DOORS 1 AND 2 (WINDWARD)
                              OPEN TARGET
                              XMIT CURSOR KEY - PRESS
 
                                                NOT PERFORMED     ______
 
 
 
 
 
 
                                                                     389
 
VOLUME 3 OF 5                                        OMI NO. - S0007VL3
DATE: 07-08-99                                       REV.    - BF-1
 
                        OPERATION INSTRUCTIONS
 
   SEQ   TIME       CMD  RESP       DESCRIPTION                 VERIF.
-------- ---------- ---- ---- --------------------------------- ------
 
31-388              CPVD OTC  VENT DOOR OPENING COMPLETE.
                    132
                    OTC  NTD
                    232
                                                NOT PERFORMED     ______
 
                              OPENING OF SS LOCKING VALVES
                              ----------------------------
                              COMPLETE
                              --------
 
31-389   -07H15M    JBWC STM  SS LOCKING VALVES OPEN WITH       WSSA
                    111       PADLOCKS INSTALLED.
                    STM  NTD
                    232
                    NTD  *SCC
                                                                        |
                              PAYLOAD COMM CHECKS                     -1|
                              -------------------                       |
                                                                        |
                                             NOTE                       |
                                                                        |
                                   PERFORM NEXT STEP FOR                |
                                   IUS/AXAF (STS-93).                   |
                                                                        |
31-389A  -07H15M    NTD  PTC  PERFORM A/G1 COMM CHECKS WITH             |
                    232       PAYLOAD LAUNCH TEAM ON OIS                |
                    PTC  ICC1 CH 212.                                   |
                         AXTC                                           |
                         ICTC                                           |
                                                NOT PERFORMED     ______|
 
                              MMT/LD WX BRIEFING FOR ET LOAD
                              ------------------------------
 
31-390   -07H10M    NTD  STM  REQUEST CAPE WX SUPPORT BRIEFING  SU73251
                    232       FOR ET LOAD.
 
31-391              NTD  *FLT MMT/LD WX BRIEFING WILL OCCUR
                    232  LD   IN 5 MINUTES IN LCC RM 1R29
                              OR O&C RM 1144 MBR.
 
31-392              NTD  STM  VERIFY READY TO SUPPORT MMT/LD
                    232       TELEVISED WX BRIEFING IN LCC RM
                              1R29 OR O&C RM 1144 MBR.
 
 
 
 
 
390
 
VOLUME 3 OF 5                                        OMI NO. - S0007VL3
DATE: 07-08-99                                       REV.    - BF-1
 
                        OPERATION INSTRUCTIONS
 
   SEQ   TIME       CMD  RESP       DESCRIPTION                 VERIF.
-------- ---------- ---- ---- --------------------------------- ------
 
31-436              CLHY CHGD VERIFY O2 CONCENTRATION IN MLP
                    166       LH2 TSM DECREASING.
 
31-437              CHGD JHGD HARDWIRE SAFING PANEL C
                    177         SIMO VALVE - 2
 
                              LCC 3R18 HUMS CONTROL ROOM - HUMS
                              REMOTE TERMINAL
 
                              1.   "VEHICLE PAGE" - SELECT
 
                              2.   SOURCES - SELECT "LINES 1-8"
 
                              3.   LINE - SELECT "S/L 8"
 
                              4.   "N2" - SELECT BACKGROUND
 
31-438              CHGD TBC  O2 CONCENTRATION IN MLP LH2 TSM
                    136       DECREASING.
                    TBC  CLHY
                              TIME__________GMT
 
                              INCREASE AFT FLOW
                              -----------------
 
                                             CAUTION
 
                                   TO PREVENT POSSIBLE OVER
                                   PRESSURIZATION OF AFT COMP,
                                   AIR TO GN2 CHANGEOVER MUST
                                   BE PERFORMED PRIOR TO NEXT
                                   STEP.
 
31-439   -06H30M    OTC  CPVD PERFORM FOLLOWING:
 
                              1.   VERIFY ECS GN2 PURGE TO ORBITER
                                   HAS STABILIZED.
 
                              2.   INCREASE CRYO LOAD AFT FLOW
                                   RATE TO 110 +/- 5 LB/MIN AND
                                   RAISE AFT INTERFACE TEMP TO
                                   105 +5/- 10 DEG F PER OMI V1122.
 
 
 
 
 
 
 
 
                                                                     401
 
VOLUME 3 OF 5                                        OMI NO. - S0007VL3
DATE: 07-08-99                                       REV.    - BF-1
 
                        OPERATION INSTRUCTIONS
 
   SEQ   TIME       CMD  RESP       DESCRIPTION                 VERIF.
-------- ---------- ---- ---- --------------------------------- ------
 
31-439A             CGLS      $PRINT V0 CF DPSMON                     -1|
                              PERFORM PGM                               |
                              $PRINT V0 CF DPSRTN                       |
                              PERFORM PGM                               |
                                                                        |
                              VERIFY CORRECT LOAD CONTENTS              |
                                                                        |
                                             NOTE                     -1|
                                                                        |
                                   PERFORM NEXT STEP IF CMD             |
                                   FILE IS PRESENT BUT CONTENTS         |
                                   ARE CORRUPTED.                       |
                                                                        |
31-439B             CGLS      $DELENT V0 CF DPSMON                    -1|
                              PERFORM PGM                               |
                              $DELENT V0 CF DPSRTN                      |
                              PERFORM PGM                               |
                                                                        |
                                                NOT PERFORMED     ______|
                                                                        |
31-439C             CGLS      $LIBRARY V0 VT                            |
                              PERFORM PGM                               |
                              VERIFY CF DIRECTORY EXIST                 |
                                                                        |
                                             NOTE                       |
                                                                        |
                                   DO NOT PERFORM NEXT FOUR             |
                                   STEPS IF CORRECT LOAD                |
                                   CONTENTS WERE VERIFIED.              |
                                                                        |
31-439D             CGLS LPS  REQUEST KEYBOARD UTILITIES AT           -1|
                    127       BKUP CONSOLE.                             |
                                                                        |
                                                NOT PERFORMED     ______|
                                                                        |
                                             NOTE                       |
                                                                        |
                                   PERFORM NEXT STEP IF                 |
                                   DIRECTORY CF DOES NOT                |
                                   EXIST.                               |
                                                                        |
31-439E                  CGLS VERIFY 1 APPL CONC AVAILABLE              |
                              $BLDLIB VO CF #900 8 4 0                  |
                              PERFORM PGM                               |
                                                NOT PERFORMED     ______|
                                                                        |
 
 
 
 
401.1
 
VOLUME 3 OF 5                                        OMI NO. - S0007VL3
DATE: 07-08-99                                       REV.    - BF-1
 
                        OPERATION INSTRUCTIONS
 
   SEQ   TIME       CMD  RESP       DESCRIPTION                 VERIF.
-------- ---------- ---- ---- --------------------------------- ------
 
31-439F                  CGLS CRT 2 POSITION:                         -1|
                                                                        |
                              SIGN ON TO SDC (SDC3)                     |
                              SIGNON - PRESS                            |
                              LOGIN: USERID - SDC XMIT                  |
                              PASSWORD: PASSWORD - SDC XMIT             |
                              VERIFY:  P1AP01                           |
                                       RSHELL>                          |
                                                                        |
                              CD/APPS/DAPFILE/FRAS_GLS/CMDFILES         |
                              SDC XMIT                                  |
                              LS - SDC XMIT                             |
                              SHIFT CLEAR - SCD XMIT (CLEAR PAGE)       |
                              SDC XMIT - PRESS                          |
                              SDC XMIT - PRESS                          |
                              CAT DPSMON - SDC XMIT                     |
                              HARD COPY - PRESS                         |
                                                                        |
                              CRT 1 POSITION:                           |
                                                                        |
                              $T                                        |
                              PERFORM PGM                               |
                              CRT 2 - XMIT RESP                         |
                              VERIFY CORRECT DATA COPIED                |
                              PAG - XMIT RESP                           |
                              SAV VO CF DPSMON - XMIT RESP              |
                                                                        |
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
                                                                   401.2
 
VOLUME 3 OF 5                                        OMI NO. - S0007VL3
DATE: 07-08-99                                       REV.    - BF-1
 
                        OPERATION INSTRUCTIONS
 
   SEQ   TIME       CMD  RESP       DESCRIPTION                 VERIF.
-------- ---------- ---- ---- --------------------------------- ------
 
                              CRT 2 POSITION:                         -1|
                                                                        |
                              SHIFT CLEAR - SDC XMIT (CLEAR PAGE)       |
                              SDC XMIT - PRESS                          |
                              SDC XMIT - PRESS                          |
                              CAT DPSRTN - SDC XMIT                     |
                              HARD COPY - PRESS                         |
                                                                        |
                              CRT 1 POSITION:                           |
                                                                        |
                              CRT 2 - XMIT RESP                         |
                              VERIFY CORRECT DATA COPIED                |
                              PAG - XMIT RESP                           |
                              SAV VO CF DPSRTN - XMIT RESP              |
                              EXI - XMIT RESP                           |
                                                                        |
                              $PRINT VO CF DPSMON                       |
                              PERF PGM                                  |
                              $PRINT VO CF DPSRTN                       |
                              PERF PGM                                  |
                                                                        |
                              PRINTER:  VERIFY CORRECT LOAD             |
                                        CONTENTS                        |
                                                                        |
                              CRT 2 POSITION                            |
                                                                        |
                              EXIT - SDC XMIT                           |
                              CPU ENABLE - PRESS                        |
                                                                        |
                                                                        |
31-439G             CGLS LPS  INHIBIT KEYBOARD UTILITIES AT BKUP      -1|
                    127       CONSOLE.                                  |
                                                                        |
                                                NOT PERFORMED     ______|
                                                                        |
31-439H             CGLS OTC  C12 RECOVERY PROCEDURE COMPLETE.        -1|
                    132                                                 |
 
 
 
 
 
 
 
 
 
 
 
 
 
401.3
 
VOLUME 3 OF 5                                        OMI NO. - S0007VL3
DATE: 07-08-99                                       REV.    - BF-1
 
                        OPERATION INSTRUCTIONS
 
   SEQ   TIME       CMD  RESP       DESCRIPTION                 VERIF.
-------- ---------- ---- ---- --------------------------------- ------
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
                    THIS PAGE INTENTIONALLY BLANK
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
                                                                   401.4
 
VOLUME 3 OF 5                                        OMI NO. - S0007VL3
DATE: 07-08-99                                       REV.    - BF-1
 
                        OPERATION INSTRUCTIONS
 
   SEQ   TIME       CMD  RESP       DESCRIPTION                 VERIF.
-------- ---------- ---- ---- --------------------------------- ------
 
                              CONTROL LOGIC INHIBIT
                              ---------------------
 
31-440              OTC  CGLS PERFORM PROGRAM SAP92 FOR T-6H
                    132       REACTIVE CONTROL LOGIC INHIBIT,
                              RCL STATUS, COMMAND ISSUANCE, STATUS
                              DP/DA. (30 MIN)
 
31-441                   CGLS VERIFY 1 AVAILABLE CONCURRENCY AND
                              2 CONSECUTIVE OC TASKS.
 
                              HOME CMD KEY - PRESS
                              SAP92
                              PERF PGM KEY - PRESS
 
31-442                   CGLS PFP
                              SAP92 - PRESS
                              PFPK1 (STATUS CMD ISSU) - PRESS
 
                              CRT
                              VERIFY PFPK1 LIGHT YELLOW BEFORE
                              CONTINUING
 
31-443                   CGLS PFPK2 (STATUS DP/DA) - PRESS
 
                              CRT
                              VERIFY PFPK2 LIGHT YELLOW BEFORE
                              CONTINUING
 
31-444                   CGLS PFPK3 (T-6H RCL INHB) - PRESS
 
                              CRT
                              VERIFY PFPK3 LIGHT YELLOW BEFORE
                              CONTINUING
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
402
 
VOLUME 3 OF 5                                        OMI NO. - S0007VL3
DATE: 07-08-99                                       REV.    - BF-1
 
                        OPERATION INSTRUCTIONS
 
   SEQ   TIME       CMD  RESP       DESCRIPTION                 VERIF.
-------- ---------- ---- ---- --------------------------------- ------
 
                              SSME PURGING (S1003)
                              --------------------
 
31-462   -06H30M    CLOX TBC  INITIATE SSME PURGING PER         SU73258
                    136       OMI S1003 ON OIS CH 156.
                    TBC  OTC
                    132
                    OTC  CSME
                         CCME
 
31-463              TBC  JYVR STOP VIDEO RECORDINGS OF OTV      COMM
                    138       CAMERAS 007/107,031/131,032/132,
                              038/138,039/139,040/140,056/156
                              (G3155 AND G3255).
 
                              START VIDEO RECORDING OF OTV
                              CAMERAS FOR CRYO LOADING (S1003
                              AND S1004) (SEE CLHY/CLOX
                              FIGURE 4) LAUNCH CONFIGURATION.
 
                              CAMERAS:
                              001/101,034/134,049/149,050/150,
                              051/151
 
                              GVA FINAL ACTIVATION COMPLETE
                              -----------------------------
 
31-464              CMEC TBC  GOX VENT SYSTEM FINAL ACTIVATION
                    136       FOR LOX LOADING PER G2158 COMPLETE.
 
31-465              TBC  CMEC TERMINATE GAG02 PROGRAM AND
                    136       TRANSFER GOX VENT ARM SYSTEM
                              MONITORING AND CONTROL TO VAJ14
                              PROGRAM PER OMI G2158.
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
                                                                     407
 
VOLUME 3 OF 5                                        OMI NO. - S0007VL3
DATE: 07-08-99                                       REV.    - BF-1
 
                        OPERATION INSTRUCTIONS
 
   SEQ   TIME       CMD  RESP       DESCRIPTION                 VERIF.
-------- ---------- ---- ---- --------------------------------- ------
 
31-466   -06H30M    CMEC TBC  GAG02 PROGRAM TERMINATED, GOX
                    136       VENT SYSTEM MONITORING AND CONTROL
                              TRANSFER TO VAJ14 PER G2158
                              COMPLETE.
 
                              OMRSD S00FC0.090-1
 
                              CL RSYS RECYCLE MONITOR COMPLETE
                              --------------------------------
 
                                             NOTE                     -1|
 
                                   PERFORM NEXT THREE STEPS IF          |
                                   SLP50 ACTIVE DUE TO SCRUB/
                                   LH2 BOIL OFF OPERATIONS.
 
31-466A             LPS  C1MC VERIFY NEXT PROGRAM WILL COME           -1|
                              UP IN CONCURRENCY 6.                      |
                                                                        |
31-467              LPS  C1MC PFP (SLP50)
                              PFPK2 KEY - RECYCLE COMPLT - PRESS
 
                              CRT (SLP50, PAGE A)
                              VERIFY MESSAGE
 
                              RECYCLE FUNCTION COMPLETE
                              AUTO RESPONSE TO ALL CONSOLE
                              FAILURES RESUMED
                              MANUAL RSYS XFER/SAFING CAPABILITY
                              ACTIVE
 
                                                NOT PERFORMED     ______
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
408
 
VOLUME 3 OF 5                                        OMI NO. - S0007VL3
DATE: 07-08-99                                       REV.    - BF-1
 
                        OPERATION INSTRUCTIONS
 
   SEQ   TIME       CMD  RESP       DESCRIPTION                 VERIF.
-------- ---------- ---- ---- --------------------------------- ------
 
                              PSEUDO INIT
                              -----------
 
                                             NOTE                     -1|
 
                                   DELETED                              |
 
31-470                   CGLS VERIFY 1 AVAILABLE CONCURRENCY
                              HOME CMD KEY - PRESS
                              SLPP1
                              PERF PGM KEY - PRESS
 
                              CONSOLE KYBD
                              (KSC A OR KSCB)
                              XMIT RESP KEY - PRESS
 
                              CURSOR CNTL
                              PSEUDO INIT
                              XMIT CURSOR KEY - PRESS
 
                              POSITION CURSOR TO ALL PSEUDOS
                              XMIT CURSOR KEY - PRESS
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
                                                                     411
 
VOLUME 3 OF 5                                        OMI NO. - S0007VL3
DATE: 07-08-99                                       REV.    - BF-1
 
                        OPERATION INSTRUCTIONS
 
   SEQ   TIME       CMD  RESP       DESCRIPTION                 VERIF.
-------- ---------- ---- ---- --------------------------------- ------
 
                                             NOTE
 
                                   IF PAGE B MSG INDICATES:
                                   "SEE PAGE A FOR OPERATOR
                                   INPUT" PERFORM THE NEXT
                                   TWO STEPS.
 
31-471                   CGLS CRT
                              VERIFY PAGE A MSG:
 
                              (N03IS511E) CRYO SAFING ENABLED
                              IS ON.  THIS INDICATES
                              SCRUB/CRYO DRAIN IN PROGRESS.
 
                                                NOT PERFORMED     ______
 
31-472                   CGLS CONSOLE KYBD (SLPP1 PAGE A)
 
                              ENTER "1" IF CRYO SAFING SUPPORT
                              COMPLETED AND SLP50 NOT ACTIVE TO
                              INITIALIZE  (N03IS511E) TO OFF.
 
                              ENTER "2" TO LEAVE (N03IS511E)
                              UNCHANGED
 
                              _____ (1 OR 2)
                              XMIT RESPONSE KEY - PRESS
 
                              CRT
                              VERIFY MSG INDICATING PSEUDO STATE
 
                                                NOT PERFORMED     ______
 
31-473                   CGLS CRT                                     -1|
 
                              VERIFY ALL SELECTED BLOCKS INVERTED
                              AND NO EXCEPTIONS PG-A
                                                                        |
                              TERMINATE
                              XMIT CURSOR KEY - PRESS
                              TERMINATE
                              XMIT CURSOR KEY - PRESS
 
 
 
 
 
 
 
 
412
 
VOLUME 3 OF 5                                        OMI NO. - S0007VL3
DATE: 07-08-99                                       REV.    - BF-1
 
                        OPERATION INSTRUCTIONS
 
   SEQ   TIME       CMD  RESP       DESCRIPTION                 VERIF.
-------- ---------- ---- ---- --------------------------------- ------
 
31-474              CGLS LPS  GLS PSEUDO INIT COMPLETE.
                    127       PLEASE NOTE IN LPS LOGS FOR
                              FUTURE SLP50 INITIATION.
 
                                             NOTE                     -1|
                                                                        |
                                   PERFORM NEXT 17 STEPS IF             |
                                   SLP50 NOT ACTIVE.                    |
                                                                        |
31-475              NTD  LPS  ACTIVATE SLP50/SAO01.                   -1|
                    232
                                                NOT PERFORMED     ______|
                                                                        |
31-476                        DELETED                                 -1|
                                                                        |
31-477                        DELETED                                 -1|
                                                                        |
31-478              LPS  C1MC VERIFY NEXT PGM WILL COME UP IN
                              CONCURRENCY 5.
 
                                                NOT PERFORMED     ______
 
31-479              LPS  C1MC PERFORM PROGRAM SLP50 AT MSTR
                              CONSOLE.
                                                NOT PERFORMED     ______
 
31-480                   C1MC PVO <FD>
                              XMIT CMD KEY - PRESS
                              N03IS510E
                              RECORD VALUE__________
 
                              N03IS511E
                              RECORD VALUE__________
 
                              NLHK0706X
                              RECORD VALUE__________
 
                                                NOT PERFORMED     ______
 
31-481                   C1MC HOME CMD KEY - PRESS
                              SLP50 - PERF PGM KEY - PRESS
 
                                                NOT PERFORMED     ______
 
 
 
 
 
 
 
                                                                     413
 
VOLUME 3 OF 5                                        OMI NO. - S0007VL3
DATE: 07-08-99                                       REV.    - BF-1
 
                        OPERATION INSTRUCTIONS
 
   SEQ   TIME       CMD  RESP       DESCRIPTION                 VERIF.
-------- ---------- ---- ---- --------------------------------- ------
 
31-482                   C1MC VERIFY CONCURRENCY 6 AVAILABLE
                              FOR SA001 ACTIVATION.
 
                                                NOT PERFORMED     ______
 
                                             NOTE
 
                                   PERFORM NEXT THREE STEPS IF
                                   PSEUDO VALUES ARE AS FOLLOWS:
 
                                   N03IS510E = OFF AND
                                   N03IS511E = OFF
 
31-483                   C1MC CRT (SLP50, PAGE A)
                              VERIFY ONE ADDITIONAL CONCURRENCY
                              AVAILABLE IF OPTION 1 WILL BE
                              SELECTED.
 
                              SPECIFY CURRENT TEST CONFIGURATION
 
                              1 - FOR TERMINAL COUNT
 
                              THIS IS THE TIME PERIOD FROM JUST
                              PRIOR TO THE START OF CRYO TANKING
                              (T-6HR) THRU GLS SECURING.
 
                              2 - CRYO DRAIN SUPPORT
 
                              THIS IS THE TIME FROM GLS SECURING
                              THRU LH2 BOILOFF COMPLETE. LH2
                              BOILOFF COMPLETE IS APPROX T+18 HR
                              FROM INITIATION OF THE SCRUB.
 
                                                NOT PERFORMED     ______
 
31-484                   C1MC CONSOLE KYBD
                              1 - XMIT RESP - PRESS
                              VERIFY - TERMINAL COUNT
 
                                                NOT PERFORMED     ______
 
 
 
 
 
 
 
 
 
 
414
 
VOLUME 3 OF 5                                        OMI NO. - S0007VL3
DATE: 07-08-99                                       REV.    - BF-1
 
                        OPERATION INSTRUCTIONS
 
   SEQ   TIME       CMD  RESP       DESCRIPTION                 VERIF.
-------- ---------- ---- ---- --------------------------------- ------
 
                                             NOTE
 
                                   PERFORM NEXT TWO STEPS IF
                                   PSEUDO VALUES ARE AS FOLLOWS:
 
                                   NLHK0706X = ON
 
31-492                   C1MC CRT (SLP50, PAGE A)
                              PSEUDO NLHK0706X IS ON, INDICATING
                              SA001 ALREADY ACTIVE.  SPECIFY
                              WHETHER TO PROCEED WITH SA001
                              ACTIVATION.
 
                              1 - ACTIVATE AS001 REGARDLESS OF THE
                                  PSEUDO VALUE
 
                              2 - DO NOT ACTIVATE SA001 NOW
 
                                                NOT PERFORMED     ______
 
31-493                   C1MC CONSOLE KYBD
                              1 - XMIT RESP KEY - PRESS
 
                              VERIFY MESSAGE
 
                              CRYOGENIC RECOVERY FUNCTION WILL BE
                              HANDLED BY SA001.
                              CRYO SAFING RESPONSE DISABLED.
 
                              PFP
                              VERIFY TASK
                              SA001
 
                                                NOT PERFORMED     ______
 
31-494              C1MC LPS  PROGRAMS ACTIVE AT MSTR:                -1
 
                              SLP50 (ACTIVE OR INACTIVE)
 
                              SA001 (ACTIVE OR INACTIVE)
 
 
 
 
 
 
 
 
 
 
                                                                     417
 
VOLUME 3 OF 5                                        OMI NO. - S0007VL3
DATE: 07-08-99                                       REV.    - BF-1
 
                        OPERATION INSTRUCTIONS
 
   SEQ   TIME       CMD  RESP       DESCRIPTION                 VERIF.
-------- ---------- ---- ---- --------------------------------- ------
 
                                             NOTE                     -1|
                                                                        |
                                   DO NOT PERFORM NEXT TWO              |
                                   STEPS IF AUTOMATIC RSYS              |
                                   XFER IS ALREADY INHIBITED.           |
                                                                        |
31-494A             LPS  CTPE PERFORM AUTOMATIC RSYS TRANSFER         -1|
                    127       INHIBIT.                                  |
                                                NOT PERFORMED     ______|
                                                                        |
31-494B                  CTPE PSP (SAP27)                               |
                              PFPK1 - PRESS (INH AUTO RCL XFER)       -1|
                                                                        |
                                                NOT PERFORMED     ______|
                                                                        |
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
417.1
 
VOLUME 3 OF 5                                        OMI NO. - S0007VL3
DATE: 07-08-99                                       REV.    - BF-1
 
                        OPERATION INSTRUCTIONS
 
   SEQ   TIME       CMD  RESP       DESCRIPTION                 VERIF.
-------- ---------- ---- ---- --------------------------------- ------
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
                    THIS PAGE INTENTIONALLY BLANK
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
                                                                   417.2
 
VOLUME 3 OF 5                                        OMI NO. - S0007VL3
DATE: 07-08-99                                       REV.    - BF-1
 
                        OPERATION INSTRUCTIONS
 
   SEQ   TIME       CMD  RESP       DESCRIPTION                 VERIF.
-------- ---------- ---- ---- --------------------------------- ------
 
                                             NOTE
 
                                   DELETED                            -1|
 
31-495              LPS  NTD  SLP50 CL RSYS/CONSOLE CRASH PGM         -1|
                    232       ACTIVE.
                    NTD  OTC
                         TBC
                    OTC  CTPE
                    132
                    TBC  CLOX
                    136  CLHY
 
31-496              LPS  NTD  SA001 LO2/LH2 CONSOLE MONITOR HAS       -1|
                    232       BEEN INITIATED.
                    NTD  OTC
                         TBC
                    OTC  CTPE
                    132
                    TBC  CLOX
                    136  CLHY
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
418
 
VOLUME 3 OF 5                                        OMI NO. - S0007VL3
DATE: 07-08-99                                       REV.    - BF-1
 
                        OPERATION INSTRUCTIONS
 
   SEQ   TIME       CMD  RESP       DESCRIPTION                 VERIF.
-------- ---------- ---- ---- --------------------------------- ------
 
31-541              TBC  CPWR VERIFY PROGRAMS
                    136       BWE08 ACTIVE IN C10
                              BWE11 ACTIVE IN C10
 
31-542              TBC  NTD  FR CONSOLE SOFTWARE ACTIVATION
                    232       IS CONFIGURED FOR T-06 HRS.
 
                              PAYLOAD PROGRAMS
                              ----------------
 
                                             NOTE
 
                                   PERFORM ONE OF THE NEXT
                                   THREE SUBSTEPS IF PAYLOAD
                                   IS POWERED UP.
 
31-543   -06H20M    PTC  CLES VERIFY C-1 CONSOLE PROGRAMS ACTIVE      -1|
                         GLES
                         DLES 1.   FOR SPACEHAB (POWERED)               |
 
                                   RS0002
                                   RW0017
                                   PAH001
                                   PAH001A
                                   PAH002
                                   PAHLCCD
                                                NOT PERFORMED     ______
                                                                  SS1
                              2.   FOR IUS                            -1|
                                                                        |
                                   RW0017                               |
                                   UW0002                               |
                                   UW0003                               |
                                   UW0004                               |
                                   UW0005                               |
                                   RA0003                               |
                                                NOT PERFORMED     ______|
                                                                  SS2   |
                              3.   FOR OTHER PAYLOADS                   |
 
                                   RW0017
                                   RA0001
                                   RA0003
                                   RA0002
                                   EA0013
                                                NOT PERFORMED     ______
                                                                  SS3   |
 
 
 
                                                                     425
 
VOLUME 3 OF 5                                        OMI NO. - S0007VL3
DATE: 07-08-99                                       REV.    - BF-1
 
                        OPERATION INSTRUCTIONS
 
   SEQ   TIME       CMD  RESP       DESCRIPTION                 VERIF.
-------- ---------- ---- ---- --------------------------------- ------
 
31-544              PTC  NTD  FR C1 CONSOLE SOFTWARE CONFIGURED.      -1|
                    232
                                                                        |
                              MASTER CONSOLE PROGRAMS
                              -----------------------
 
31-545              NTD  LPS  VERIFY PROGRAMS ACTIVE IN MSTR:
                    232       $HWMON (TCB1)
                              AA008/AWP02 (TCB2)
                              AA009/AWP01 (TCB4)
                              SLP50 (TCB5)
                              SA001 (TCB6)
 
                              FAULT SUMM PAGE CLEAR
                              ---------------------
 
31-546              OTC  CDPS PERFORM FAULT SUMMARY PAGE REVIEW
                    132       AND CLEAR.
 
31-547                   CDPS CURSOR CNTL (SAS01 PG-B)
                              FAULT SUMMARY PAGE DISPLAY (VASE2)
                              XMIT CURSOR KEY - PRESS
 
                              CRT (SAS01 PG-B)
 
                              VERIFY NO UNEXPLAINED FAULT MESSAGES
 
                              APPL PAGE (SAS01 PG-B)
                              PFK 2 KEY - PRESS
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
426
 
VOLUME 3 OF 5                                        OMI NO. - S0007VL3
DATE: 07-08-99                                       REV.    - BF-1
 
                        OPERATION INSTRUCTIONS
 
   SEQ   TIME       CMD  RESP       DESCRIPTION                 VERIF.
-------- ---------- ---- ---- --------------------------------- ------
 
                              PAYLOAD LAUNCH COMMIT CRITERIA
                              ------------------------------
 
31-573              PTC  ALL  VERIFY YOUR SYSTEM MEETS LAUNCH         -1|
                    134       COMMIT CRITERIA FOR START OF
                              TANKING.
 
                              FOR SPACEHAB
                              (DLES MAKES COPIES OF SPACEHAB DISPLAYS
                              TO FILE WITH E59XX)
                              DLES _____
                              *STC _____
                                                                        |
                              FOR IUS                                   |
                              DLES _____                                |
                              AXTC _____                                |
                              ICTC _____                                |
 
                              FOR OTHERS
                              DLES _____
 
31-574              TBC  ALL  VERIFY YOUR SYSTEM MEETS LAUNCH
                    136       COMMIT CRITERIA REQUIREMENTS FOR
                              START OF TANKING PHASE AT
                              T-06 HOURS.
 
                              CLOX _____
                              CLHY _____
                              CMEC _____
                              CPWR _____
                              CBHY _____
                              CISL _____
                              CBRS _____
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
                                                                     433
 
VOLUME 3 OF 5                                        OMI NO. - S0007VL3
DATE: 07-08-99                                       REV.    - BF-1
 
                        OPERATION INSTRUCTIONS
 
   SEQ   TIME       CMD  RESP       DESCRIPTION                 VERIF.
-------- ---------- ---- ---- --------------------------------- ------
 
                              REPORT LCC STATUS
                              -----------------
 
31-575   -06H20M    OTC  NTD  NO LAUNCH COMMIT CRITERIA
                    TBC       VIOLATIONS FOR CRYO TANKING.
                    PTC
                    SRO
                    *MIL
                    LPS
                    STM
                    232
 
31-576              NTD  CSPE VERIFY NO LAUNCH COMMIT CRITERIA
                    232       VIOLATIONS WHICH CONSTRAIN
                              CRYO PROPELLENT LOADING.
 
31-577              NTD  LD   VERIFY GO FOR LO2
                    232       AND LH2 TANKING.
 
                              VERIFY SAFING PANEL CONFIG        SU73268
                              --------------------------
 
31-578                   CGLS HOME CMD KEY - PRESS
                              $SYS
                              PERFORM PGM KEY - PRESS
                              LDBA
                              XMIT CURSOR KEY - PRESS
 
                              DETERMINE IF ALL THE FOLLOWING
                              SAFING SEQUENCES: 0,2-14,16,18,
                              20-24 ARE LOADED/NOT LOADED.
                              (GREEN UP ARROW = LOADED)
 
31-579                   NTD  LDB SAFING SEQUENCES LOADED/NOT
                              LOADED.
 
                                             NOTE
 
                                   PERFORM NEXT TWO STEPS
                                   REGARDLESS OF SAFING SEQ
                                   LOADED/NOT LOADED.
 
31-580              CGLS LPS  REPORT CURRENT LDB FEP CONFIGURATION.
                    127
                              FEP_____=LDB-A SWITCH POS
 
                              FEP_____=LDB-B
 
 
 
434
 
VOLUME 3 OF 5                                        OMI NO. - S0007VL3
DATE: 07-08-99                                       REV.    - BF-1
 
                        OPERATION INSTRUCTIONS
 
   SEQ   TIME       CMD  RESP       DESCRIPTION                 VERIF.
-------- ---------- ---- ---- --------------------------------- ------
 
                              LH2 PRECHILLDOWN OPS - COMPLETE
                              -------------------------------
 
31-629   -06H00M    CLHY TBC  ET LH2 PRE-CHILLDOWN OPERATIONS   SU73208
                    136       PER S1004 COMPLETE. READY
                    TBC  NTD  TO PROCEED WITH FACILITY/
                    232       ORBITER CHILLDOWN AND LH2
                              FLOW.  REQUEST SFOC SAFETY
                              CONCURRENCE TO PROCEED WITH
                              CHILLDOWN AND LH2 FLOW.
 
                              OMRSD S00FB0.090-B-1
                              OMRSD S00FB0.290-1
                              OMRSD S00FB0.080-1R
                              OMRSD S00FB0.070-1R
                              OMRSD S00FE0.040-1
                              OMRSD S00FE0.050-1
                              OMRSD S00FA0.225
                              OMRSD S00FB0.082-1R
                              OMRSD S00FB0.083
 
                                             NOTE
 
                                   THE NEXT SEVEN STEPS WILL
                                   PERFORM A BT4 SNAPSHOT FOR
                                   THE MPS SYSTEM ONLY.  LOX/
                                   MPS LOADING PRELIMINARIES
                                   AND LH2 PRECHILL OPS MUST
                                   BE COMPLETE PRIOR TO
                                   PERFORMING A BT4 SNAPSHOT.
 
                                   DO NOT PERFORM NEXT SEVEN STEPS
                                   IF MPS REVIEWED THE BT4
                                   SNAPSHOT AT T-6 HR AND 20 MIN.
 
                                   BT4 SNAPSHOT MAY BE PERFORMED
                                   DURING ORB/SRB/ET PIC
                                   RESISTANCE TEST PROVIDED SRB
                                   IGNITION S&A DEVICE VERIFICATION
                                   WILL NOT BE PERFORMED.
 
31-630              NTD  OTC  PERFORM BT4 SNAPSHOT ON ALL DPS MDM'S.
                    232
                    OTC  CDPS
                    132
                                                NOT PERFORMED     ______
 
 
 
 
                                                                     447
 
VOLUME 3 OF 5                                        OMI NO. - S0007VL3
DATE: 07-08-99                                       REV.    - BF-1
 
                        OPERATION INSTRUCTIONS
 
   SEQ   TIME       CMD  RESP       DESCRIPTION                 VERIF.
-------- ---------- ---- ---- --------------------------------- ------
 
31-631                   CDPS CURSOR CNTL (SAS01 PG B)
                              DPS
                              XMIT CURSOR KEY - PRESS
 
                              CURSOR CNTL (SAS01 PG B)
                              MDM DISCRETE OUTPUT CHECK (VAS94)
                              XMIT CURSOR KEY - PRESS
 
                              PFK 2 - PRESS
 
                                                NOT PERFORMED     ______
 
31-632                   CDPS CURSOR CNTL (VAS94 PG B)
                              T-3 HR SNAPSHOT
                              XMIT CURSOR KEY - PRESS
 
                                                NOT PERFORMED     ______
 
                                             NOTE
 
                                   PERFORM NEXT STEP UPON
                                   RECEIPT OF ORIGINAL COPY
                                   AND COPY 1.
 
31-633                   CDPS CONSOLE KYBD (VAS94)                    -1|
                              PFK 15 KEY - PRESS                        |
 
                                                NOT PERFORMED     ______
 
31-634              CDPS OTC  T-6 HR SNAPSHOT PRIOR TO TANKING FOR
                    132       MPS COMPLETE.  READY FOR CMPS REVIEW.
                    OTC  NTD
                    232
                                                NOT PERFORMED     ______
 
31-635              CTPE      BT4 TO BE DISTRIBUTED TO FOLLOWING
                              SYSTEMS AS FOLLOWS:
 
                              C3/4 - 1 COPY FOR CMPS
                              INTG - 1 COPY FOR TPE
                                                NOT PERFORMED     ______
 
 
 
 
 
 
 
 
 
448
 
VOLUME 3 OF 5                                        OMI NO. - S0007VL3
DATE: 07-08-99                                       REV.    - BF-1
 
                        OPERATION INSTRUCTIONS
 
   SEQ   TIME       CMD  RESP       DESCRIPTION                 VERIF.
-------- ---------- ---- ---- --------------------------------- ------
 
32-006              NTD  STM  WX BRIEFING COMPLETE.  SUPPORT    COMM
                    232  *FLT RELEASED.
                    STM
                    111  GYCC
                    GYCC GYVW
                    PTP  GYVO
                                                NOT PERFORMED     ______
 
                                             NOTE                       |
                                                                        |
                                   PPVM MAY PERFORM NEXT                |
                                   STEP IF CPVD NOT ON                  |
                                   STATION.                             |
                                                                        |
32-006A             PTC  OTC  AFTER CIRCUIT STABILIZES, PERFORM       -1|
                    132       ORBITER OPERATION SUPPORT SETUP 15,       |
                    OTC  CPVD PAYLOAD BAY PURGE VERIFICATION.           |
                         CMQC                                           |
                              NOTIFY PTC IMMEDIATELY IF PURGE           |
                              GOES OUT OF SPEC. (STS-93)                |
                                                                        |
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
                                                                     457
 
VOLUME 3 OF 5                                        OMI NO. - S0007VL3
DATE: 07-08-99                                       REV.    - BF-1
 
                        OPERATION INSTRUCTIONS
 
   SEQ   TIME       CMD  RESP       DESCRIPTION                 VERIF.
-------- ---------- ---- ---- --------------------------------- ------
 
                              OMS/RCS HTR DEACT                       -1|
                              -----------------
 
32-007   +05H00M    COOS CDR  PANEL A14                         SU73303
                    132       RCS/OMS HEATERS
                                OMS
                                  CRSFD LINES
                                    A AUTO SW - OFF
                                    B AUTO SW - OFF
                                FWD RCS JET
                                  1 SW - OFF
                                  2 SW - OFF
                                  3 SW - OFF
                                  4 SW - OFF
                                  5 SW - OFF
 
                                AFT RCS JET
                                  1 SW - OFF
                                  2 SW - OFF
                                  3 SW - OFF
                                  4 SW - OFF
                                  5 SW - OFF
 
                                             NOTE
 
                                   PERFORM NEXT STEP IF
                                   SCRUB WILL BE 72 HRS
                                   OR LONGER.
 
32-008              OTC  *PAD INSTALL SWITCHGUARDS PER
                    132  CDR  S0007VL4 (SEQ 80).
                                                NOT PERFORMED     ______
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
457.1
 
VOLUME 3 OF 5                                        OMI NO. - S0007VL3
DATE: 07-08-99                                       REV.    - BF-1
 
                        OPERATION INSTRUCTIONS
 
   SEQ   TIME       CMD  RESP       DESCRIPTION                 VERIF.
-------- ---------- ---- ---- --------------------------------- ------
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
                    THIS PAGE INTENTIONALLY BLANK
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
                                                                   457.2
 
VOLUME 3 OF 5                                        OMI NO. - S0007VL3
DATE: 07-08-99                                       REV.    - BF-1
 
                        OPERATION INSTRUCTIONS
 
   SEQ   TIME       CMD  RESP       DESCRIPTION                 VERIF.
-------- ---------- ---- ---- --------------------------------- ------
 
32-009              OTC  *PAD SAFE SIDE HATCH JETTISON SYSTEM:
                    132  CDR
                              1.   REMOVE V070-660385-008 SAFETY
                                   PIN/FLAG FROM 'T' HANDLE BOX.
 
                              2.   INSTALL SA-26R-124 COMBINATION
                                   LOCK/PLACARD ON 'T' HANDLE BOX.
 
                              3.   BAG, TAG AND RETAIN
                                   V070-660385-008 PIN FOR NEXT
                                   LAUNCH ATTEMPT.
 
                                                                T:______
 
                                                NOT PERFORMED     ______
 
                              OEX/MADS RECORDER ERASE (CONTINGENCY)
                              -------------------------------------
 
                                             NOTE
 
                                   PERFORM NEXT TWO STEPS
                                   ONLY IF PCT OF TAPE USED
                                   IS GREATER THAN 50 PCT.
 
32-010              OTC  CISL PERFORM "OEX/MADS RECORDER ERASE  SU73307
                    132       AND VERIFICATION" PER V1179.
                              REPORT COMPLETION.  (APPROX 8 HRS)
 
                              OV-102 - OMI V1179.004
                              OV-103 - OMI V1179.008
                              OV-104 - 0MI V1179.012
                              OV-105 - OMI V1179.016
 
                              OMRSD S00E00.815
 
                                                NOT PERFORMED     ______
 
32-011              OTC  *PAD GO TO CH 145 TO LINE UP SUPPORT
                    132       FOR CISL IN LOCKER REMOVAL AND MRAM
                              (OV-102) OR DAM (OV-103/OV-104/OV-105)
                              INSTALLATION PER V1179.
 
                                                NOT PERFORMED     ______
 
 
 
 
 
 
458
 
VOLUME 3 OF 5                                        OMI NO. - S0007VL3
DATE: 07-08-99                                       REV.    - BF-1
 
                        OPERATION INSTRUCTIONS
 
   SEQ   TIME       CMD  RESP       DESCRIPTION                 VERIF.
-------- ---------- ---- ---- --------------------------------- ------
 
32-064              *SCC NTD  YOU HAVE SAFETY CONCURRENCE TO OPEN
                    232       LH2 CONTROL AREA AT PAD___ FOR
                    NTD  TBC  CONTROLLED WORK EXCEPT LH2 TSM,
                    TBC  CLHY ORBITER AFT COMPARTMENT, LH2
                    136       FLARE STACKS, ET INTERTANK, MLP
                              SIDE 1, 50 FT OF CROSS COUNTRY
                              VENT LINE, LH2 DISCONNECT TOWER,
                              ET VENT LINE, ECS BRIDGE, AND NORTH
                              BRIDGE.
 
32-065              PLHY CLHY HAZARDOUS LH2 OPERATIONS COMPLETE       -1|
                    166       IN LH2 STORAGE AREA.  LH2 STORAGE         |
                    CLHY TBC  AREA AND EAST PERIMETER ROAD ARE          |
                    136       OPEN FOR CONTROLLED WORK.                 |
                    TBC  NTD                                            |
                    232
                    NTD  *SCC
 
32-066                        DELETED                                 -1|
 
32-067              CLHY TBC  FIRE COMBAT CREW AT LH2 STORAGE   FIRE
                    136       MAY BE RELEASED.  ONE FIRE COMBAT
                    TBC  NTD  CREW WILL REMAIN AT FIRE STATION
                    232       NO. 6 TO SUPPORT CONTINUED SCRUB/
                    NTD  *SCC TURNAROUND ACTIVITIES.
                         STM
                    STM  JSTC
                    111
                    JSTC JFIR
                    114
 
32-068              CLHY TBC  LH2 SYSTEM SAFING PER S1018
                    136       COMPLETE.
                    TBC  NTD
                    232
                    NTD  OTC
                         STM
 
 
 
 
 
 
 
 
 
 
 
 
 
                                                                     473
 
VOLUME 3 OF 5                                        OMI NO. - S0007VL3
DATE: 07-08-99                                       REV.    - BF-1
 
                        OPERATION INSTRUCTIONS
 
   SEQ   TIME       CMD  RESP       DESCRIPTION                 VERIF.
-------- ---------- ---- ---- --------------------------------- ------
 
32-069              STM  JYVO TERMINATE VIDEO TRACKING AND      COMM
                    138  JYVR RECORDING OF LH2 SAFING TEAM.
 
32-070              CTIF TBC  ET POST DRAIN WALKDOWN PER        SU73314
                    136       S6444 COMPLETE.
                    TBC  NTD
                    232
                              OMRSD S00E00.031
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
474
 
VOLUME 3 OF 5                                        OMI NO. - S0007VL3
DATE: 07-08-99                                       REV.    - BF-1
 
                        OPERATION INSTRUCTIONS
 
   SEQ   TIME       CMD  RESP       DESCRIPTION                 VERIF.
-------- ---------- ---- ---- --------------------------------- ------
 
                                             WARNING
 
                                   HAZARDOUS OPERATIONS CONTINUE
                                   DUE TO GH2 IN ET LH2 TANK.
 
32-088              CLHY TBC  ATTENTION ON PAD___:
                    136
                    TBC  NTD  GASEOUS HYDROGEN WILL BE VENTED TO
                    232       FLARE STACK INTERMITTENLY FOR NEXT
                    NTD       1-1/2 HOURS THROUGH ET VENT VALVE,
                    PA        LH2 TSM, MLP SIDE 1 AND 4 AND LH2
                              VENT LINES.  ALL PERSONNEL REMAIN
                              CLEAR OF LH2 FLARE STACK AREA.
 
32-089              CLHY CMPS ATTENTION ON PAD___:
                    132
                    CMPS OTC  HYDROGEN GAS WILL BE VENTED
                    132       THROUGH THE RTLS DUMP VALVES IN
                    OTC  NTD  ONE MINUTE.  VENTING WILL BE ON
                    NTD       ORBITER LEFT SIDE, ABOVE AFT              |
                    PA        PORTION OF WING.                          |
 
32-090              CLHY TBC  ET LH2 TANK PURGE COMPLETE.       SU73318
                    136
                    TBC  NTD
                    232
 
32-091                        DELETED                                 -1|
                                                                        |
32-091A             CLHY TBC  REQUEST SFOC SAFETY PROCEED TO          -1|
                    136       MLP SIDE 1 FOR VERIFYING LESS             |
                    TBC  NTD  THAN 1 PCT GH2 IN ET LH2 TANK.            |
                    232                                                 |
                    NTD  *SCC                                           |
                                                                        |
32-091B             *SCC NTD  YOU HAVE SAFETY CONCURRENCE TO          -1|
                    232       PROCEED TO MLP SIDE 1 FOR                 |
                    NTD  TBC  VERIFYING LESS THAN 1 PCT GH2             |
                    TBC  CLHY IN ET LH2 TANK.                           |
                    136                                                 |
 
 
 
 
 
 
 
 
 
 
                                                                     479
 
VOLUME 3 OF 5                                        OMI NO. - S0007VL3
DATE: 07-08-99                                       REV.    - BF-1
 
                        OPERATION INSTRUCTIONS
 
   SEQ   TIME       CMD  RESP       DESCRIPTION                 VERIF.
-------- ---------- ---- ---- --------------------------------- ------
 
32-092              *PSE *SCC LESS THAN 1 PCT GH2 VERIFIED IN
                    NET       ET LH2 TANK, HAZARDOUS OPERATIONS
                    105       ARE COMPLETE.
                    *SCC NTD
                    232
                    NTD  TBC
                    TBC  CLHY
                    136
                              OMRSD S00E00.430-1
 
                                             NOTE
 
                                   HAZARDOUS OPERATIONS
                                   COMPLETE.
 
32-093              CLHY TBC  ET LH2 TANK AND ASSOCIATED VENT
                    136       LINES VERIFIED TO BE LESS THAN
                    TBC  CHGD 1 PCT GH2.  TERMINATE AFT MONITORING.
 
                                             NOTE
 
                                   PERFORM NEXT STEP PER CLHY
                                   DIRECTION.  IF TEMPORARY
                                   SECURING OF LH2 FLARE STACKS
                                   NOT REQUIRED, DO NOT PERFORM
                                   FOLLOWING STEP.
 
32-094              CLHY TBC  LH2 FLARE STACKS WILL BE          SU73322
                    136       TEMPORARILY SECURED AT THIS
                    TBC  NTD  TIME.
                    232
                                                NOT PERFORMED     ______
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
480
 
VOLUME 3 OF 5                                        OMI NO. - S0007VL3
DATE: 07-08-99                                       REV.    - BF-1
 
                        OPERATION INSTRUCTIONS
 
   SEQ   TIME       CMD  RESP       DESCRIPTION                 VERIF.
-------- ---------- ---- ---- --------------------------------- ------
 
32-196              NTD  *SCC CLEAR FOLLOWING PERSONNEL THROUGH
                    232       PAD ___ GATE TO SUPPORT LOX SPHERE
                    *SCC *PSE REPLENISH.
                    NET
                    105
                              ESSENTIAL PERSONNEL (HAZ BADGE)
                              -------------------------------
 
                              (ET PERSONNEL PREV MANLOADED
                               IN SEQ 30 PLUS:)
 
                              1 (PER TANKER) SUPPORT DRIVER
                              1              SFOC SAFETY
 
32-197              *PSE *SCC PERSONNEL FOR LOX SPHERE REPLENISH
                    NET       HAVE BEEN CLEARED THROUGH PAD ___
                    105       GATE.
                    *SCC NTD
                    232
 
32-198              PLOX TBC  PERFORM FOLLOWING:                      -1|
                    136
                    TBC  NTD  1.   VERIFY FIRE COMBAT           FIRE
                    232            SUPPORT ON STATION AT LOX    SU73338
                    NTD  *SCC      STORAGE AREA AND EMERGENCY   SU73357
                                   MEDICAL SERVICES SUPPORT ON          |
                                   STANDBY AT LC-39 FIRE STATION        |
                                   NO. 2 AND PERFORM COMMUNICATIONS     |
                                   CHECK ON NET 105 AND BACKUP
                                   NET 205.
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
                                                                     515
 
VOLUME 3 OF 5                                        OMI NO. - S0007VL3
DATE: 07-08-99                                       REV.    - BF-1
 
                        OPERATION INSTRUCTIONS
 
   SEQ   TIME       CMD  RESP       DESCRIPTION                 VERIF.
-------- ---------- ---- ---- --------------------------------- ------
 
32-198
CON'T                         2.   CLEAR NONESSENTIAL PERSONNEL
                                   FROM LOX STORAGE AREA.  ESSENTIAL
                                   PERSONNEL ARE AS FOLLOWS:
 
                                   PLOX LOX STORAGE AREA, LOX
                                     ENGINEER
                                   PLO4 LOX STORAGE AREA, LOX TECH
                                   PLO5 LOX STORAGE AREA, LOX TECH
                                   PLO6 LOX STORAGE AREA, LOX TECH
                                   PLO7 LOX STORAGE AREA, LOX TECH
                                   *PSE LOX STORAGE AREA, SFOC SAFETY
                                   KSC SAFETY
                                   KSC FIRE SERVICES PERSONNEL
                                   PNLO NASA LOX ENGR (OPTIONAL)
                                   PNQC NASA QC
                                   SUPPORT TANKER DRIVERS (1 PER
                                     TANKER)
 
                                   VERIFY ESSENTIAL PERSONNEL ARE
                                   WEARING SF APPROVED COVERALLS
                                   AND NON-SPARKING FOOT WEAR
                                   AND HAVE FACESHIELDS AND
                                   CHARKATE LEATHER GLOVES
                                   AVAILABLE FOR USE.
 
                              3.   SET LOX STORAGE AREA WARNING
                                   LIGHTS TO FLASHING AMBER.
 
                              4.   ESTABLISH ROADBLOCKS AT
                                   FLASHING AMBER WARNING LIGHTS
                                   ON SOUTHWEST SIDE OF PAD
                                   PERIMETER ROAD AND IN FRONT
                                   OF LOX SUPPORT BUILDING.
 
                              5.   REQUEST SFOC SAFETY CONCURRENCE
                                   TO PROCEED.
 
 
 
 
 
 
 
 
 
 
 
 
 
516
 
VOLUME 3 OF 5                                        OMI NO. - S0007VL3
DATE: 07-08-99                                       REV.    - BF-1
 
                        OPERATION INSTRUCTIONS
 
   SEQ   TIME       CMD  RESP       DESCRIPTION                 VERIF.
-------- ---------- ---- ---- --------------------------------- ------
 
32-224                   OMTO 1307 BULKHEAD ACCUMULATOR DUMP VALVES
 
                              1.   REMOVE LOCKWIRE FROM HANDLE OF
                                   EACH VALVE.  DO NOT CUT WIRE
                                   THROUGH RETAINING SCREW.
 
                              2.   SYS 1 (50V58MV1) - SLOWLY OPEN
 
                              3.   SYS 2 (50V58MV2) - SLOWLY OPEN
 
                              4.   SYS 3 (50V58MV3) - SLOWLY OPEN
 
                              5.   RECORD
 
                                   DATE__________ TIME__________(GMT)
 
                                                                T:______
 
                                                NOT PERFORMED     ______
 
                                             NOTE
 
                                   DELAY 2 MINUTES MINIMUM
                                   FOR PRESSURE TO STABILIZE
                                   PRIOR TO PROCEEDING.
 
32-225                   OMTO 1307 BULKHEAD ACCUMULATOR DUMP VALVES
 
                              1.   SYS 1 (50V58MV1) - CLOSE
 
                              2.   SYS 2 (50V58MV2) - CLOSE
 
                              3.   SYS 3 (50V58MV3) - CLOSE
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
                                                                     525
 
VOLUME 3 OF 5                                        OMI NO. - S0007VL3
DATE: 07-08-99                                       REV.    - BF-1
 
                        OPERATION INSTRUCTIONS
 
   SEQ   TIME       CMD  RESP       DESCRIPTION                 VERIF.
-------- ---------- ---- ---- --------------------------------- ------
 
32-225                        4.   IF NOT LOCKWIRED, TORQUE HANDLE    -1|
CON'T                              RETAINING SCREW TO 8-10 IN. LBS.
 
                                   LOCKWIRE ACCUMULATOR DUMP VALVE
                                   HANDLE RETAINING SCREW TO VALVE
                                   BODY USING MS20995N20 LOCKWIRE
                                   PER MAO101-301.
 
                                   CAL NO.__________                    |
 
                                                       50V58MV1
                                                                T:______
 
                                                NOT PERFORMED     ______
 
                                                       50V58MV2
                                                                T:______
 
                                                NOT PERFORMED     ______
 
                                                       50V58MV3
                                                                T:______
 
                                                NOT PERFORMED     ______
 
                              5.   USING MS20995N32 LOCKWIRE,
                                   SECURE DUMP VALVE HANDLE FROM
                                   .060-.070 IN. DIA HOLE FOR
                                   LOCKWIRE IN VALVE HANDLE TO
                                   VALVE OUTLET (DUMP) TUBE ASSY.
 
                                                       50V58MV1
                                                                T:______
 
                                                       50V58MV2
                                                                T:______
 
                                                       50V58MV3
                                                                T:______
 
                                                NOT PERFORMED     ______
 
                                   OMRS V58AA0.041-J
                                   OMRS V58AA0.041-K
                                   OMRS V58AA0.041-L
 
 
 
 
 
526
 
VOLUME 3 OF 5                                        OMI NO. - S0007VL3
DATE: 07-08-99                                       REV.    - BF-1
 
                        OPERATION INSTRUCTIONS
 
   SEQ   TIME       CMD  RESP       DESCRIPTION                 VERIF.
-------- ---------- ---- ---- --------------------------------- ------
 
                                             NOTE
 
                                   HAZARDOUS OPERATION (SSME
                                   GNE PURGE) COMPLETE.
 
                                   PERFORM NEXT STEP IF
                                   ESP/ECP AREA IS REQUIRED
                                   TO BE OPENED.
 
32-250              NTD  *SCC SSME GN2 PURGE CHECKOUT COMPLETE.
                    232       VERIFY O2 LEVELS ACCEPTABLE ON
                    *SCC *PSE ORBITER ESP/ECP.  REQUEST SAFETY
                    NET       CONCURRENCE TO OPEN ORBITER
                    105       ESP/ECP AREA FOR CONTROLLED WORK
                              AND TO REMOVE SIGNS.
 
                                                NOT PERFORMED     ______
 
                              SSME FINAL PREPS COMPLETE
                              -------------------------
 
                              GND SUPPORT COMM SYS VALID(-20H)
                              --------------------------------
 
                                             NOTE
 
                                   DO NOT PERFORM NEXT TWO
                                   STEPS IF SYSTEM CURRENTLY
                                   IN LAUNCH CONFIGURATION.
 
32-251              STM  GYCC PERFORM VALIDATION OF             COMM
                    111  *MIL MULTI-BURST VIDEO TEST SIGNAL     SU73351
                    GYCC GYVW PER OMI A2700 ON OIS CH 268.
                    PTP       (1 HR)
 
                                                NOT PERFORMED     ______
 
 
 
 
 
 
 
 
 
 
 
 
 
 
                                                                     533
 
VOLUME 3 OF 5                                        OMI NO. - S0007VL3
DATE: 07-08-99                                       REV.    - BF-1
 
                        OPERATION INSTRUCTIONS
 
   SEQ   TIME       CMD  RESP       DESCRIPTION                 VERIF.
-------- ---------- ---- ---- --------------------------------- ------
 
32-252              NTD  *MIL PERFORM LPS/MILA CIRCUIT
                    232  STM  VALIDATION PER OMI A2700.  (1 HR)
                         LPS
                         JRPS
                                                NOT PERFORMED     ______
 
32-252A                  JRPS IF NOT CONFIGURED, CONFIGURE KMTS       -1|
                              0505A2 (A4, A5, A6) TO OI 128KB           |
                              H/L DATA.                                 |
                                                                        |
32-253                   LPS  VERIFY LPS CONFIGURED TO SUPPLY         -1|
                              MSFC KMTS, MER AND DOWNEY PCMMU
                              DATA LINK.  VERIFY RECEIPT OF DATA.
 
32-254              LPS  JRPS VERIFY LCC__ CONFIGURED TO SUPPLY       -1|
                              DOWNEY CCP DATA.                          |
 
32-255                   LPS  VERIFY MER AND DOWNEY RECEIVING
                              PCMMU DATA.
 
                              VERIFY COMM/NAV FREQ CLEARANCE
                              ------------------------------
 
32-256              NTD  STM  VERIFY OPEN LOOP FREQUENCY        SU73804
                    232       CLEARANCE FOR S-BAND AND UHF
                    STM  ENDO FOR DURATION OF LAUNCH COUNTDOWN.
                              (853-2436)
                              S-BAND PM  S-BAND FM  UHF
                              2041.9 MHZ            259.7 MHZ
                              2106.4 MHZ 2250.0 MHZ 296.8 MHZ
                              2217.5 MHZ
                              2287.5 MHZ
 
32-257              NTD  STM  VERIFY OPEN LOOP FREQ CLEAR FOR
                    232       FOLLOWING FREQUENCIES UNTIL T+2H.
                    STM  ENDO (853-2436)
                              1.   MSBLS 15.460, 15.616 AND
                                   15.568 GHZ (KU-BAND)
 
                              2.   RA MC409-0015-0006:
                                   RADAR ALTIMETER FREQUENCY CLEARANCE
 
 
 
 
 
 
 
 
 
534
 
VOLUME 3 OF 5                                        OMI NO. - S0007VL3
DATE: 07-08-99                                       REV.    - BF-1
 
                        OPERATION INSTRUCTIONS
 
   SEQ   TIME       CMD  RESP       DESCRIPTION                 VERIF.
-------- ---------- ---- ---- --------------------------------- ------
 
                              PAYLOADS SSP/PRLA SWITCH CONFIG
                              -------------------------------
                              FOR ASCENT SWITCHLIST
                              ---------------------
 
32-359   -13H30M    OTC  CPLE PERFORM SSP/PRLA SWITCH
                    132       CONFIGURATION PER SEQ 58
                              (S0007VL4).  (10 MIN)
 
32-360              CPLE OTC  SSP/PRLA SWITCH CONFIGURATION           -1|
                              COMPLETE.
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
                                                                     561
 
VOLUME 3 OF 5                                        OMI NO. - S0007VL3
DATE: 07-08-99                                       REV.    - BF-1
 
                        OPERATION INSTRUCTIONS
 
   SEQ   TIME       CMD  RESP       DESCRIPTION                 VERIF.
-------- ---------- ---- ---- --------------------------------- ------
 
                                                                        |
                              IUS CALL TO STATION                     -1|
                              -------------------                       |
                                                                        |
                                             NOTE                       |
                                                                        |
                                   PERFORM NEXT SIX STEPS FOR           |
                                   IUS/AXAF (STS-93), IF IUS            |
                                   IS POWERED DOWN.                     |
                                                                        |
                                   PERFORM NEXT STEP AT L-23            |
                                   HOURS.                               |
                                                                        |
32-360A             PTC  NTD  PERFORMING IUS CALL TO STATIONS           |
                    232       AND PRE-LAUNCH CONFIGURATION PER          |
                    NTD  OTC  S0007VL4 (SEQ 78).                        |
                                                                        |
                                                NOT PERFORMED     ______|
                                                                        |
                              PRE-ASCENT SWITCHLIST FOR PAYLOADS        |
                              ----------------------------------        |
                                                                        |
                                             NOTE                       |
                                                                        |
                                   PERFORM THE PRE-ASCENT IUS/          |
                                   AXAF SWITCHLIST NO LATER             |
                                   THAN L-22 HOURS.                     |
                                                                        |
32-360B             NTD  PTC  PERFORM PRE-ASCENT SWITCHLIST           -1|
                    232       FOR PAYLOADS PER S0007VL4 (SEQ 79).       |
                                                                        |
                                                NOT PERFORMED     ______|
                                                                        |
32-360C             PTC  NTD  PRE-ASCENT SWITCHLIST COMPLETE.           |
                                                                        |
                                                NOT PERFORMED     ______|
 
 
 
 
 
 
 
 
 
 
 
 
 
 
561.1
 
VOLUME 3 OF 5                                        OMI NO. - S0007VL3
DATE: 07-08-99                                       REV.    - BF-1
 
                        OPERATION INSTRUCTIONS
 
   SEQ   TIME       CMD  RESP       DESCRIPTION                 VERIF.
-------- ---------- ---- ---- --------------------------------- ------
 
                              IUS AFD PNL ASP SUPPORT                   |
                              -----------------------                   |
                                                                        |
                                             NOTE                       |
                                                                        |
                                   PERFORM NEXT STEP AT                 |
                                   L-21H30M.                            |
                                                                        |
32-360D             PTC  OTC  REQUEST ASP SUPPORT ON OIS CH 134         |
                    132       FOR IUS AFD PANEL PRESET FOR              |
                              MISSION PER S0007VL4 (SEQ 78).            |
                                                                        |
                                                NOT PERFORMED     ______|
                                                                        |
                              IUS POWER ON PREPS AND POWER UP           |
                              -------------------------------           |
                                                                        |
32-360E             NTD  PTC  PERFORM IUS POWER ON PREPS AND            |
                              POWER IUS ON PER S0007VL4 (SEQ 78).       |
                                                                        |
                                             NOTE                       |
                                                                        |
                                   PERFORM NEXT STEP AT                 |
                                   L-18H45M.                            |
                                                                        |
32-360F             ICTC PTC  IUS CHECKOUT COMPLETE PER S0007VL4      -1|
                    134       (SEQ 78).                                 |
                    PTC  NTD                                            |
                    232                                                 |
                                                                        |
                              PAYLOAD CONFIG FOR ASCENT SWITCHLIST
                              ------------------------------------
 
                                             NOTE                       |
                                                                        |
                                   PERFORM NEXT TWO STEPS FOR           |
                                   STS-93.                              |
                                                                        |
32-361              NTD  PTC  PERFORM PAYLOAD CONFIGURATION FOR
                    232       ASCENT SWITCHLIST PER S0007VL4
                              (SEQ 79).
                                                NOT PERFORMED     ______|
 
32-362              PTC  NTD  PAYLOAD CONFIGURATION FOR ASCENT
                    232       SWITCHLIST PER S0007VL4 (SEQ 79)
                    NTD  OTC  COMPLETE.
                                                NOT PERFORMED     ______|
 
 
 
                                                                   561.2
 
VOLUME 3 OF 5                                        OMI NO. - S0007VL3
DATE: 07-08-99                                       REV.    - BF-1
 
                        OPERATION INSTRUCTIONS
 
   SEQ   TIME       CMD  RESP       DESCRIPTION                 VERIF.
-------- ---------- ---- ---- --------------------------------- ------
 
                              HYDRAULIC SYS CONFIG FOR ASCENT
                              -------------------------------
                              SWITCHLIST
                              ----------
 
                                             NOTE
 
                                   DO NOT PROCEED WITH HYDRAULIC
                                   SYSTEM CONFIGURE UNTIL FLIGHT
                                   CONTROL ACTIVATION IS COMPLETE.
 
32-363              OTC  CHYD PERFORM HYD SYS CONFIG FOR
                    132  ASP  SWITCHLIST.
 
32-364              CHYD CDR  PANEL L4
                              ROW O
                                AC1
                                  HYD QTY 1
                                    PHB CB - CLOSE
 
                                AC2
                                  HYD QTY 2
                                    PHB CB - CLOSE
 
                                AC3
                                  HYD QTY 3
                                    PHB CB - CLOSE
 
32-365              CHYD PLT  PANEL R2
                              APU/HYD
                                HYD MAIN PUMP PRESS
                                   1 SW - NORM
                                   2 SW - NORM
                                   3 SW - NORM
 
                                HYD CIRC PUMPS
                                   1 SW - GPC (GUARDED)
                                   2 SW - GPC (GUARDED)
                                   3 SW - GPC (GUARDED)
 
                                BOILER CNTLR/HTR
                                   1 SW - A
                                   2 SW - A
                                   3 SW - A
 
 
 
 
 
 
562
 
VOLUME 3 OF 5                                        OMI NO. - S0007VL3
DATE: 07-08-99                                       REV.    - BF-1
 
                        OPERATION INSTRUCTIONS
 
   SEQ   TIME       CMD  RESP       DESCRIPTION                 VERIF.
-------- ---------- ---- ---- --------------------------------- ------
 
                              IUS POST POWER UP CHECKOUT COMPLETE     -1|
                              -----------------------------------       |
                                                                        |
                                             NOTE                       |
                                                                        |
                                   PERFORM NEXT STEP FOR                |
                                   IUS MISSION 9STS-93).                |
                                                                        |
                                   PERFORM NEXT STEP AT                 |
                                   L-18H40M.                            |
                                                                        |
32-404A             ICTC PTC  IUS CHECKOUT COMPLETE PER S0007VL4.       |
                    134       (SEQ 78).                                 |
                    PTC  NTD                                            |
                    232                                                 |
                                                                        |
                              IUS QUIET TIME REQUEST                  -1|
                              ----------------------                    |
                                                                        |
                                             NOTE                       |
                                                                        |
                                   PERFORM THE NEXT FIVE STEPS          |
                                   FOR IUS MISSION (STS-93),            |
                                   IF DIRECTED BY ICTC.                 |
                                                                        |
                                   PERFORM NEXT STEP AT L-16:35.        |
                                                                        |
32-404B             ICTC PTC  READY TO PROCEED WITH RIMU CAL AND        |
                    134       ALIGN.  REQUEST QUIET TIME BE PLACED      |
                    PTC  NTD  IN EFFECT IN 15 MINUTES.                  |
                    232                                                 |
                    NTD  OTC                                            |
                         TBC                                            |
                         STM                                            |
                                                NOT PERFORMED     ______|
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
                                                                   576.1
 
VOLUME 3 OF 5                                        OMI NO. - S0007VL3
DATE: 07-08-99                                       REV.    - BF-1
 
                        OPERATION INSTRUCTIONS
 
   SEQ   TIME       CMD  RESP       DESCRIPTION                 VERIF.
-------- ---------- ---- ---- --------------------------------- ------
 
                                                                        |
                              IUS QUIET TIME START                    -1|
                              --------------------                      |
                                                                        |
                                             NOTE                       |
                                                                        |
                                   FOLLOWING CRITERIA REQUIRED          |
                                   FOR QUIET TIME ACTIVITY:             |
                                                                        |
                                   1.  NO HYDRAULICALLY ACTUATED        |
                                       AEROSURFACE OR SSME TVC          |
                                       MOVEMENT                         |
                                                                        |
                                   2.  NO SRB NOZZLE MOVEMENT           |
                                                                        |
                                   3.  NO MPS 17-INCH DISCONNECT        |
                                       VALVE CYCLES                     |
                                                                        |
                                   4.  NO UNCOORDINATED CABIN           |
                                       ACTIVITY                         |
                                                                        |
                                   5.  NO CHANGES IN PLB PURGE          |
                                       (FLOW RATE OR TEMP)              |
                                                                        |
                                   6.  NO 3,4,5,6,7 OR 9 VENT           |
                                       DOOR OPERATIONS                  |
                                                                        |
                                   7.  NO SSME FRT OR OTHER             |
                                       OPERATIONS RESULTING IN          |
                                       SIMULATED SSME PNEUMATIC         |
                                       SHUTDOWN.                        |
                                                                        |
                                   8.  MAX WIND OF 49 KNOTS             |
                                       (PEAK VELOCITY IN ANY            |
                                       DIRECTION).                      |
                                                                        |
                                   9.  NO MOBILE CRANE OPERATIONS       |
                                                                        |
                                   10. NO ORBITER WEATHER               |
                                       PROTECTION MOVEMENT              |
                                                                        |
                                   11. NO ORBITER CRYOGENIC             |
                                       CHILLDOWN                        |
 
 
 
 
 
 
 
576.2
 
VOLUME 3 OF 5                                        OMI NO. - S0007VL3
DATE: 07-08-99                                       REV.    - BF-1
 
                        OPERATION INSTRUCTIONS
 
   SEQ   TIME       CMD  RESP       DESCRIPTION                 VERIF.
-------- ---------- ---- ---- --------------------------------- ------
 
                                                                        |
                                             NOTE                       |
                                                                        |
                                   PERFORM THE NEXT STEP AT             |
                                   L-16H20M.                            |
                                                                        |
32-404C             NTD  PTC  PROCEED WITH RIMU CAL AND ALIGN.        -1|
                    232       QUIET TIME IN EFFECT.                     |
                                                                        |
                              OMRSD P018JB.035-C                        |
                                                                        |
                                                NOT PERFORMED     ______|
                                                                        |
                                             NOTE                       |
                                                                        |
                                   DURING RIMU CAL/ALIGN, PTC           |
                                   WILL REQUEST PAYLOAD BAY             |
                                   PURGE, WIND DIRECTION AND            |
                                   VELOCITY DATA EVERY 30 MIN.          |
                                   PTC WILL RECORD THIS DATA            |
                                   IN APPENDIX B (S0007VL4).            |
                                                                        |
32-404D             PTC  OTC  PROVIDE TEMPERATURE, FLOWRATE AND         |
                    132       HUMIDITY OF PAYLOAD BAY PURGE PER         |
                    OTC  CPVD ORBITER OPERATION SUPPORT SETUP 15.       |
                              PTC WILL REQUEST DATA EVERY 30 MIN        |
                              DURING RIMU CAL/ALIGN. NOTIFY PTC         |
                              IMMEDIATELY OF ANY VIOLATIONS.            |
                                                                        |
                                                NOT PERFORMED     ______|
                                                                        |
32-404E             PTC  NTD  REQUEST WIND DIRECTION AND VELOCITY       |
                    232       READING FROM 60 FT WIND TOWERS.           |
                    NTD  STM                                            |
                    STM  JBDY RECORD:                                   |
                    111                                                 |
                    JBDY *WEA WIND DIRECTION__________                  |
                    231                                                 |
                              WIND VELOCITY__________                   |
                                                                        |
                                                NOT PERFORMED     ______|
 
 
 
 
 
 
 
 
 
                                                                   576.3
 
VOLUME 3 OF 5                                        OMI NO. - S0007VL3
DATE: 07-08-99                                       REV.    - BF-1
 
                        OPERATION INSTRUCTIONS
 
   SEQ   TIME       CMD  RESP       DESCRIPTION                 VERIF.
-------- ---------- ---- ---- --------------------------------- ------
 
                              IUS RIMU CAL AND ALIGN START           -1 |
                              ----------------------------              |
                                                                        |
                                             NOTE                       |
                                                                        |
                                   PERFORM NEXT STEP AT L-16H15M.       |
                                                                        |
32-404F             PTC  ICTC PROCEED WITH RIMU CAL AND ALIGN           |
                    134       PER DOP D290-50020-27. QUIET TIME         |
                              IN EFFECT.  REPORT STATUS OF CAL          |
                              AND ALIGN AS AVAILABLE.                   |
                                                                        |
                                                NOT PERFORMED     ______|
                                                                        |
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
576.4
 
VOLUME 3 OF 5                                        OMI NO. - S0007VL3
DATE: 07-08-99                                       REV.    - BF-1
 
                        OPERATION INSTRUCTIONS
 
   SEQ   TIME       CMD  RESP       DESCRIPTION                 VERIF.
-------- ---------- ---- ---- --------------------------------- ------
 
33-000                        PAYLOAD SCRUB (24,48 AND 72 HOUR)       -1|
                              ---------------------------------         |
                                                                        |
                                             NOTE                       |
                                                                        |
                                   PERFORM THIS SEQUENCE FOR            |
                                   IUS MISSIONS ONLY (STS-93).          |
                                                                        |
                                ENTIRE SEQUENCE NOT PERFORMED     ______|
                                                                        |
                                             CAUTION                  -1|
                                                                        |
                                   FOR IUS MISSIONS ONLY, PAYLOAD       |
                                   PRIMARY POWER MUST REMAIN ON FROM    |
                                   IUS POWER ON THROUGH LAUNCH.  IF     |
                                   PAYLOAD PRIMARY MAIN C IS LOST       |
                                   BEFORE L-20 MINUTES, IUS WILL        |
                                   POWER DOWN.  IUS COUNTDOWN MUST      |
                                   BE REPEATED.  AFTER L-20 MINUTES,    |
                                   IUS WILL SWITCH TO ASE BATTERIES     |
                                   AND WILL BE NO-GO FOR LAUNCH.        |
                                                                        |
                                   SHOULD ANY LOSS OF P/L PRI           |
                                   MN C OCCUR, NOTIFY PTC               |
                                   IMMEDIATELY.  DO NOT REAPPLY         |
                                   P/L PRIMARY POWER WITHOUT            |
                                   NOTIFYING PTC.                       |
                                                                        |
33-001              PTC  NTD  VERIFY ORBITER PAYLOAD BAY PURGE          |
                    232       ON AND WITHIN SPECIFICATIONS              |
                    NTD  OTC  PER ORBITER OPERATION SUPPORT             |
                              SETUP 15.                                 |
                                                                        |
                              NOTIFY PTC IMMEDIATELY IF PURGE           |
                              GOES OUT OF SPEC.                         |
                                                                        |
                                             NOTE                     -1|
                                                                        |
                                   PERFORM NEXT STEP FOR                |
                                   SCRUB TURNAROUNDS REQUIRING          |
                                   IUS TO REMAIN POWERED ON.            |
                                                                        |
33-002              PTC  ICTC PERFORM IUS RECYCLE PER                   |
                              D290-50020-27.                            |
                                                                        |
                              OMRSD P018JD.015                          |
                                                                        |
                                                NOT PERFORMED     ______|
                                                                        |
 
                                                                     633
 
VOLUME 3 OF 5                                        OMI NO. - S0007VL3
DATE: 07-08-99                                       REV.    - BF-1
 
                        OPERATION INSTRUCTIONS
 
   SEQ   TIME       CMD  RESP       DESCRIPTION                 VERIF.
-------- ---------- ---- ---- --------------------------------- ------
 
                                             NOTE                       |
                                                                        |
                                   PERFORM NEXT 11 STEPS FOR            |
                                   SCRUB TURNAROUNDS REQUIRING          |
                                   IUS TO POWER DOWN.                   |
                                                                        |
33-003              PTC  ICTC PERFORM IUS SCRUB AND POWER DOWN        -1|
                              PER D290-50020-27.  REPORT                |
                              COMPLETON..                               |
                                                                        |
                              OMRSD PO18JD.020                          |
                                                NOT PERFORMED     ______|
                                                                        |
33-004              PTC  OTC  REQUEST MS2 ON CH 134.                  -1|
                    132                                                 |
                                                                        |
                                                NOT PERFORMED     ______|
                                                                        |
33-005              PTC  ICTC VERIFY READY TO PROCEED WITH              |
                    134  AXTC IUS/AXAF CRITICAL HEATER POWER            |
                              OFF.                                      |
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
634
 
VOLUME 3 OF 5                                        OMI NO. - S0007VL3
DATE: 07-08-99                                       REV.    - BF-1
 
                        OPERATION INSTRUCTIONS
 
   SEQ   TIME       CMD  RESP       DESCRIPTION                 VERIF.
-------- ---------- ---- ---- --------------------------------- ------
 
33-006              ICTC ASP  PANEL L10 (PCP)                         -1|
                                                                        |
                              PANEL MODE SW - PRIMARY           L10S61  |
                              POWER                                     |
                                PRI CB - CLOSE                  L10CB1  |
                                ALT CB - CLOSE                  L10CB2  |
                                                                        |
                              IUS SUPPORT                               |
                                HEATERS                                 |
                                  CRITICAL                              |
                                    PRI SW - OFF                L10S22  |
                                    PRI TB BP                   L10I22  |
                                    ALT TB BP                   L10I52  |
                              POWER                                     |
                                PRI CB - OPEN                   L10CB1  |
                                ALT CB - OPEN                   L10CB2  |
                                                                        |
                              OMRSD P018JD.020                          |
                                                NOT PERFORMED     ______|
                                                                        |
33-007              ICTC PTC  IUS/AXAF CRITICAL HEATER POWER          -1|
                         AXAF OFF COMPLETE.                             |
                                                NOT PERFORMED     ______|
                                                                        |
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
                                                                   634.1
 
VOLUME 3 OF 5                                        OMI NO. - S0007VL3
DATE: 07-08-99                                       REV.    - BF-1
 
                        OPERATION INSTRUCTIONS
 
   SEQ   TIME       CMD  RESP       DESCRIPTION                 VERIF.
-------- ---------- ---- ---- --------------------------------- ------
 
33-008              ICTC MS2  PANEL L11 CIU                           -1|
                    134       POWER SW - OFF                            |
                                                NOT PERFORMED     ______|
                                                                        |
33-009              PTC  MS2  PANEL L12 IUS                             |
                              PAYLOAD TIMING BUFFER CB - OPEN           |
                                                                        |
                                                NOT PERFORMED     ______|
                                                                        |
33-010              PTC  OTC  POWER OFF PAYLOAD CABIN AND AUX           |
                    132       BUSSES.                                   |
                    OTC  CPLE                                           |
                                                NOT PERFORMED     ______|
                                                                        |
33-011              CPLE PLT  PANEL R1A1                              -1|
                              POWER DISTRIBUTION                        |
                              PAYLOAD                                   |
                                AUX SW - OFF                            |
                                CABIN SW - OFF                          |
                                                NOT PERFORMED     ______|
                                                                        |
33-012              CPLE OTC  PAYLOAD CABIN AND AUX BUSSES ARE        -1|
                    132       POWERED OFF.                              |
                    OTC  PTC                                            |
                                                                        |
                                                NOT PERFORMED     ______|
                                                                        |
33-013              PTC  ICTC IUS TEST TEAM RELEASED FROM             -1|
                    134       SUPPORT.                                  |
                                                NOT PERFORMED     ______|
                                                                        |
33-014              PTC  NTD  PAYLOAD SCRUB COMPLETE.  READY          -1|
                    232       TO RESUME TURNAROUND OPERATIONS.          |
                    NTD  OTC                                            |
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
634.2
 
VOLUME 3 OF 5                                        OMI NO. - S0007VL3
DATE: 07-08-99                                       REV.    - BF-1
 
                        OPERATION INSTRUCTIONS
 
   SEQ   TIME       CMD  RESP       DESCRIPTION                 VERIF.
-------- ---------- ---- ---- --------------------------------- ------
 
35-000                        LAUNCH SCRUB AND SECURE
                              -----------------------
 
                                             WARNING
 
                                   THIS SEQUENCE CONTAINS
                                   MULTIPLE/PARALLEL HAZARDOUS
                                   OPERATIONS.  ALL ESSENTIAL
                                   PERSONNEL WILL BE BRIEFED
                                   ON HAZARDS THAT ARE PRESENT
                                   FOR THAT TASK AND APPLICABLE
                                   SEQUENCES OF APPENDIX Z.  THIS
                                   BRIEFING MUST BE REPEATED FOR
                                   EACH SHIFT CHANGE.
 
                                             CAUTION                  -1|
                                                                        |
                                   FOR IUS MISSIONS ONLY, PAYLOAD       |
                                   PRIMARY POWER MUST REMAIN ON FROM    |
                                   IUS POWER ON THROUGH LAUNCH.  IF     |
                                   PAYLOAD PRIMARY MAIN C IS LOST       |
                                   BEFORE L-20 MINUTES, IUS WILL        |
                                   POWER DOWN.  IUS COUNTDOWN MUST      |
                                   BE REPEATED.  AFTER L-20 MINUTES,    |
                                   IUS WILL SWITCH TO ASE BATTERIES     |
                                   AND WILL BE NO-GO FOR LAUNCH.        |
 
                                   SHOULD ANY LOSS OF P/L PRI
                                   MN C OCCUR, NOTIFY PTC
                                   IMMEDIATELY.  DO NOT
                                   REAPPLY P/L PRI POWER
                                   WITHOUT NOTIFYING PTC.
 
                                             NOTE
 
                                   OPERATIONS INVOLVING CRIT 1,
                                   1R AND/OR 1S ITEMS ARE CONTAINED
                                   IN THE FOLLOWING SEQUENCE/STEPS.
 
                                   SEQ 30 INITIAL SCRUB TURNAROUND      |
                                   NEED NOT BE COMPLETED BEFORE         |
                                   PERFORMING THIS SEQ.                 |
 
                                   THIS IS A CONTINGENCY SEQUENCE
                                   AND WILL BE PERFORMED IF LAUNCH
                                   SCRUB AND SECURE REQUIRED.
 
                                ENTIRE SEQUENCE NOT PERFORMED     ______
 
 
                                                                     685
 
VOLUME 3 OF 5                                        OMI NO. - S0007VL3
DATE: 07-08-99                                       REV.    - BF-1
 
                        OPERATION INSTRUCTIONS
 
   SEQ   TIME       CMD  RESP       DESCRIPTION                 VERIF.
-------- ---------- ---- ---- --------------------------------- ------
 
35-001   +04H30M    NTD  OTC  OTV CAMERA USAGE ASSIGNMENTS      COMM
                    232  TBC  FOR THIS SEQUENCE ARE PER
                         STM  EXCLUSIVE USAGE CAMERA
                    STM  JYVO MATRIX FIG 4 (IN FRONT
                    138       SECTION OF THIS VOLUME)
 
35-002              NTD  STM  PLACE CONDITION RED STROBE        COMM
                    232       LIGHT SWITCH IN PTCR ROOM 205     SU73524
                    STM  GYCC IN DISABLE(OFF) POSITON AND ATTACH
                    111       INTEGRITY CONTROL STICKER TO SWITCH.
                    GYCC PSOQ (30 MIN)
                    PTP
                    117  JYCJ
 
                              ESSENTIAL PERSONNEL
                              -------------------
                                        UCOM   UQA
                                        ----   ---
                              TECH       1
                              QUALITY           1
                                                                TQV:____
 
35-003              JYCJ GYCC CONDITION RED STROBE LIGHT        COMM
                    117       SWITCH IN PTCR ROOM 205 HAS BEEN
                    GYCC STM  PLACED IN DISABLE (OFF) POSITION
                    111       AND INTEGRITY CONTROL STICKER
                    STM  NTD  HAS BEEN ATTACHED TO SWITCH.
                    232
 
                                             NOTE
 
                                   PERFORM NEXT TWO STEPS IF
                                   ACCESS REQUIRED DURING SCRUB
                                   TURNAROUND.
 
                              LCC UNDER FLOOR LOCK C/O
                              ------------------------
 
35-004              NTD  STM  CHANGE FIRING ROOM UNDERFLOOR     SEC
                    232       AREA AND LCC ROOM 2R14 CABLE
                    STM  JSTC TUNNEL ACCESS CONTROL LOCKS.
                    111       REMOVE SECURITY LOCKS AND
                    JSTC *SEC INSTALL LOACS LOCK ON FIRING
                    114       ROOM UNDER FLOOR AREA AND
                              COMM LOCK ON LCC/2R14 CABLE
                              TUNNEL.
 
                                                NOT PERFORMED     ______
 
 
686
 
VOLUME 3 OF 5                                        OMI NO. - S0007VL3
DATE: 07-08-99                                       REV.    - BF-1
 
                        OPERATION INSTRUCTIONS
 
   SEQ   TIME       CMD  RESP       DESCRIPTION                 VERIF.
-------- ---------- ---- ---- --------------------------------- ------
 
35-063              CCSE CDR  PANEL R12A2 (STOWAGE CONTAINER)
                              OPEN LATCH
                              TEAC RECORDER
                                MODE SW - REV
 
                                                NOT PERFORMED     ______
 
                                             NOTE
 
                                   PAUSE HERE UNTIL TAPE
                                   COMPLETELY REWINDS.
 
35-064              CSSE CDR  PANEL O19
                              TV
                              TV PWR SW - OFF
 
                                                NOT PERFORMED     ______
 
35-065              CSSE CDR  PANEL R12A2 (STOWAGE CONTAINER)
                              TEAC RECORDER
                                MODE SW - REC
                              CLOSE LATCH
 
                                                NOT PERFORMED     ______
 
                              GN&C SYSTEM POWER DOWN
                              ----------------------
 
                                             NOTE
 
                                   DO NOT PROCEED WITH FLIGHT
                                   CONTROL POWER DOWN (PART
                                   OF GN&C SYSTEM POWER DOWN)
                                   UNTIL THE HYDRAULIC SYSTEM
                                   SECURING IS COMPLETE.
 
35-066              OTC  COFC PERFORM GN&C SYSTEM POWER DOWN    SU73510
                    132  CGNC PER S0007VL4 (SEQ 43).  REPORT
                              COMPLETION REQUIRES: CDR (15 MIN)
                                        TOTAL TIME = 15 MIN
 
                              DDU SECURING
                              ------------
 
35-067              OTC  CODS POWERDOWN DDU'S, FLIGHT CONTROLLERS,
                    132       AND INSTRUMENT POWER (IF APPLICABLE)
                              PER OMI V9001VL3.
 
                              RT OMI LOG NO.__________
 
                                                                     703
 
VOLUME 3 OF 5                                        OMI NO. - S0007VL3
DATE: 07-08-99                                       REV.    - BF-1
 
                        OPERATION INSTRUCTIONS
 
   SEQ   TIME       CMD  RESP       DESCRIPTION                 VERIF.
-------- ---------- ---- ---- --------------------------------- ------
 
                              ECLSS SAFING
                              ------------
 
35-068              OTC  CECL PERFORM ECLSS SAFING PER S0007VL4 SU73511
                    132  CDR  (SEQ 66) ON CH 143.
 
                              LH2 STORAGE AREA SECURING - COMPLETE
                              ------------------------------------
 
35-069   +06H00M    CLHY TBC  LH2 STORAGE AREA VERIFIED LESS    SU73512
                    136       THAN 1 PCT GH2.  REQUEST SFOC           -1|
                    TBC  NTD  SAFETY CONCURRENCE TO REMOVE
                    232       PERIMETER ROADBLOCK AND TO OPEN
                    NTD  *SCC LH2 SYSTEM AT PAD_____ FOR
                              CONTROLLED WORK EXCEPT FOR
                              FOLLOWING AREAS:
 
                              1.   LO2/LH2 TSM
                              2.   ORBITER AFT COMPARTMENT
                              3.   LH2 FLARE STACKS
                              4.   ET INTERTANK
                              5.   MLP SIDE 1
                              6.   50 FT OF CROSS COUNTRY
                                   VENT LINE
                              7.   LH2 DISCONNECT TOWER
                              8.   LH2 ET VENT LINE
                              9.   ECS BRIDGE
                              10.  NORTH BRIDGE
                              11.  LOX TSM                              |
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
704
 
VOLUME 3 OF 5                                        OMI NO. - S0007VL3
DATE: 07-08-99                                       REV.    - BF-1
 
                        OPERATION INSTRUCTIONS
 
   SEQ   TIME       CMD  RESP       DESCRIPTION                 VERIF.
-------- ---------- ---- ---- --------------------------------- ------
 
35-069A             NTD  *SCC INSTALL SAFETY SIGNS AT LH2             -1|
                    232       DISCONNECT TOWER AT PAD SURFACE           |
                    *SCC *PSE STAIRS.  VERIFY/INSTALL SAFETY            |
                    NET       WARNING SIGNS AT LO2/LH2 TSMS.            |
                    105                                                 |
                                                                        |
35-069B             *PSE *SCC SAFETY SIGNS INSTALLED AT LH2           -1|
                    NET       DISCONNECT TOWER AT PAD SURFACE           |
                    105       STAIRS AND AT LO2/LH2 TSMS.               |
                    *SCC NTD                                            |
                    232                                                 |
                                                                        |
35-069C             *SCC NTD  YOU HAVE SAFETY CONCURRENCE TO OPEN     -1|
                    232       LH2 CONTROL AREA AT PAD___ FOR            |
                    NTD  TBC  CONTROLLED WORK EXCEPT LH2 TSM,           |
                    TBC  CLHY ORBITER AFT COMPARTMENT, LH2              |
                    136       FLARE STACKS, ET INTERTANK, MLP           |
                              SIDE 1, 50 FT OF CROSS COUNTRY            |
                              VENT LINE, LH2 DISCONNECT TOWER,          |
                              ET VENT LINE, ECS BRIDGE, AND NORTH       |
                              BRIDGE.                                   |
                                                                        |
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
                                                                   704.1
 
VOLUME 3 OF 5                                        OMI NO. - S0007VL3
DATE: 07-08-99                                       REV.    - BF-1
 
                        OPERATION INSTRUCTIONS
 
   SEQ   TIME       CMD  RESP       DESCRIPTION                 VERIF.
-------- ---------- ---- ---- --------------------------------- ------
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
                    THIS PAGE INTENTIONALLY BLANK
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
704.2
 
VOLUME 3 OF 5                                        OMI NO. - S0007VL3
DATE: 07-08-99                                       REV.    - BF-1
 
                        OPERATION INSTRUCTIONS
 
   SEQ   TIME       CMD  RESP       DESCRIPTION                 VERIF.
-------- ---------- ---- ---- --------------------------------- ------
 
35-157   +22H30M    NTD  STM  NOTIFY FPL LAUNCH CLOSED LOOP     ELEC
                    232       CONFIGURATION MAY RETURN TO       SU73591
                    STM  JSTC SINGLE FEED (OPEN LOOP).
                    111
                    JSTC JSEP
                    114
 
                              HGDS MASS SPEC SECURING
                              -----------------------
 
35-158              CLHY TBC  HGDS MONITORING MAY BE            SU73561
                    136       TERMINATED. PERFORM BUHGDS
                    TBC  CHGD OR HUMS MASS SPEC SECURING.
 
35-159                   CHGD BUHGDS REMOTE TERMINAL                  -1|
 
                              1.   MANUAL - NONE                        |
 
                              BUHGDS SAFING PANEL - A
 
                              2.   ON/STANDBY SWITCH - TOGGLE FOR       |
                                   STANDBY INDICATION
 
35-160                   CHGD LCC 3R18 HUMS CONTROL ROOM - HUMS
                              REMOTE TERMINAL
 
                              1.   "VEHICLE PAGE" - SELECT
 
                              2.   SOURCES - SELECT "LINES 1-8"
 
                              3.   VERIFY NO VALVES SELECTED
 
                              4.   "SETUP PAGE" - SELECT
 
                              5.   MODE - SELECT "STBY"
 
                              6.   "MEAS PAGE" - SELECT
 
                              7.   VERIFY NO VALVES SELECTED
 
 
 
 
 
 
 
 
 
 
 
                                                                     729
 
VOLUME 3 OF 5                                        OMI NO. - S0007VL3
DATE: 07-08-99                                       REV.    - BF-1
 
                        OPERATION INSTRUCTIONS
 
   SEQ   TIME       CMD  RESP       DESCRIPTION                 VERIF.
-------- ---------- ---- ---- --------------------------------- ------
 
35-160                        8.   VERIFY MODE "STBY"
CON'T
                              9.   TERMINATE LAST ACRCHIVE FILE
 
35-161              CHGD TBC  MASS SPEC SECURING COMPLETE.
                    136
 
                              RLDS 6145 SECURING
                              ------------------
 
35-162              TBC  CLHY PERFORM RLDS 6145 SECURING.
                    136  CHGD
 
35-163                   CHGD CURSOR CNTL (SAW01/HWW11)
                              LD 23/25 PUMP - OFF
                              LD 24/50 PUMP - OFF
                              MFC POWER - OFF
                              XMIT CURSOR KEY - PRESS
 
35-164              CHGD PETG FSS 195 FT LEVEL - 6145 CABINET
                    177       GN2 PURGE VALVE A152873 - CLOSE (CW)
 
                                                                T:______
 
35-165              CHGD TBC  RLDS 6145 SECURING COMPLETE.
                    136  CLHY
 
                              RLDS 6407/6660 SECURING
                              -----------------------
 
                                             NOTE
 
                                   PERFORM NEXT FOUR STEPS IF
                                   GSE SECURING WAS PERFORMED.
 
35-166              TBC  CHGD PERFORM RLDS 6407/6660 SECURING.
                    136  CLHY
 
                                                NOT PERFORMED     ______
 
35-167                   CHGD CURSOR CNTL (SAW01/HWW12)
                              LD 28/32 PUMP - OFF
                              LD 56/57 PUMP - OFF
                              MFC POWER - OFF
                              XMIT CURSOR KEY - PRESS
 
                                                NOT PERFORMED     ______
 
 
 
730
 
 
 DATE:  1999-07-08   12.01.55
 
 S0007VL3
 
 SHUTTLE COUNTDOWN (LPS)
 
 DISTRIBUTION F - FINAL
 
 
 CHRIS WEAVER..........................7
   PZ-L
 RTW/MONICA  COLEY
   USK-275
 
 
 TOTAL QTY:   283
 
 FOR CHANGES TO THIS DISTRIBUTION LIST, CONTACT:
 
 MARY            M. HESTER              , USK-187, (407) 861-3301 EXT
 ELIZABETH       C. KLOS                , USK-187, (407) 861-3430 EXT
 
 
 
 DATE:  1999-07-08   12.01.55
 
 S0007VL3
 
 SHUTTLE COUNTDOWN (LPS)
 
 DISTRIBUTION F - FINAL
 
 
 AFQA/LGQAB/P. MCDANIEL                   NN-L/PAYLOAD ENGINEERING
 BA/FC-50/W. BRAGG.....................2  NN-M1
 BA/FC-51/ELS DATA FILES                  NN-M2
 BA/FC-51/J. HAGOOD....................2  NN-M3
 BA/FC-51/J. LEWIS.....................2  THIO-LSS/BRIAN ST. AUBIN
 BA/FC-51/N. BIHR......................3  USBI-LSS/LIBRARY
 BNA SPACEHAB/NANCY CRABTREE...........2  USK-078/CCC, C-1 PNEU
   SPACEHAB, INC                          USK-078/CCC, C-1 WATER
   620 MAGELLAN RD                        USK-078/CCC, C-2 HVAC
   CAPE CANAVERAL, FL 32920               USK-078/CCC, C-3 POWER
 C07A/J. LECHER                           USK-078/CCC, INTEGRATION
   JSC, TX  77058                         USK-225/JODI SILLS
 EI-C-C/NSF CONSOLE                       USK-391/SAFETY OPS (PAD B)
 EI-C-C/PAC CONSOLE                       USK-550/VITT OFFICE....2
 EI-C-D/NASA VAB SAFETY                   ZA03/DAVID BARNES
 EI-C-F/NASA OPF SAFETY                     BOEING NORTH AMERICAN
 ESMC-SEO/CAMPBELL                          555 DISCOVERY DRIVE
 LLOYD MUSTIN SSM                           HUNTSVILLE, AL  35806
   MAIL STOP AE26                         3 SLS/DOOT/CAPT. G. FENTRESS
   BOEING NORTH AMERICAN                  3 SLS/MA/B. STRACENER.....2
   SPACE SYSTEMS DIV.                     AIR-FORCE CCAFS
   P.O. BOX 7009                            N/A
   DOWNEY, CA  90241-7009                   45 RANS/DOOB
 MS-E68/R. BAKES                            (CCAFS)
   THIOKOL CORP.                            PHILLIPS PARKWAY/10400
   P.O. BOX 707                             PATRICK AFB, FL  32925
   BRIGHAM CITY, UT  84302-0707           CCC LIBRARY...............3
 MS3/LIBRARY                                USK-093
   JSC, TX  77058                         MISSION SUPPORT
 MV2/D. STAMPER                             SGS-347
   JSC, TX  77058                         EG&G PROTECTIVESYSTEMS
 MV3/KENNETH BROWN                          BOC-326
   JSC, TX  77058                         PAD ELECTRICAL-SHOP
 NASA/JSC..............................2    USK-175
   C/O TRANSPORTATION OFFICE              SECTION NASACOMM/RFSYSTEMS
   BUILDING 420                             PK-F3
   HOUSTON, TX  77058                     NASA-FLT ELECTR-SYS-SECT
   ATTN: DA82/MARY C. THOMAS                PK-F
   BLDG 30M, ROOM 235
 
 
 DATE:  1999-07-08   12.01.55
 
 S0007VL3
 
 SHUTTLE COUNTDOWN (LPS)
 
 DISTRIBUTION F - FINAL
 
 
 FLOW DIRECTOR-OFFICE                     TSMO SITE-MGRS
   PH-B2                                    USK-299
 SECTION NASAECLSSSYSTEM                  TSMO OMD
   PK-G5                                    USK-075
 BOEING P/L-TEST-CONDUCTOR.............3  USA INSTRUMENTATION.....2
   F214                                     USK-194
 GUIDANCE-AND NAVIGATION                  USA LAUNCH-OPERATIONS...2
   USK-195                                  USK-C09
 GEL LCC-RM-3R18                          VITT OFFICE
   USK-542                                  F204
 LCC HAZ-GAS                                O&C BLDG
   USK-542                                SWING ARMS-ENG'G
 ORB MECHANISM                              USK-290
   PK-H5                                  ET MECHANICAL-ENG
 NASA QA-FR1                                USK-251
   USK-268                                ET LH2PAD-A
 OTC ORBTESTCONDUCTOR..................4    USK-174
   USK-023                                ET LH2PAD-B
 SPC PAD-SAFETY........................3    USK-390
   USK-257                                ET-LOX PAD-A
 TEST-OPS PAD-A                             USK-173
   USK-307                                ET-LOX PAD-B
 TEST-OPS PAD-B                             USK-316
   USK-389                                MEQ ORB-MECHANISMS-ENG
 BRANCH INSTRUM.&P/LSYS................2    USK-408
   PK-F3                                  OMS/RCS ENG-PADA
 PNEUMATICS ENGINEERING                     USK-484
   USK-043                                OMS/RCS ENG-PADB
 OFFICE NASAFIRE/RESCUE                     USK-347
   IM-SPS-A                               CENTRL WRK-PKG-BLD
 PAD SWING-ARMS-SHOP                        USK-409
   USK-398                                COMM CONTROL......2
 SFOC SAFETY-CONSOLE                        USK-145
   USK-399                                TSMO PAD-A
 SUPV-SAFETY RELIABILITY-ENGR               USK-076
   USK-291                                TSMO PAD-B
 TECHNICAL DOCUMENTATION-CENTER.......50    USK-404
   USK-038                                TSMO SUPV-STM.....3
                                            USK-299
 
 
 DATE:  1999-07-08   12.01.55
 
 S0007VL3
 
 SHUTTLE COUNTDOWN (LPS)
 
 DISTRIBUTION F - FINAL
 
 
 ROBERT T. ROOK II                        PAUL L. QUANDT
   USK-356                                  USK-356
 FRANK A. DEBERNARDO                      TODD M. GRACOM
   USK-116                                  USK-195
 NEAL R. GRIFFITH                         PAUL R. GRATSCH......2
   USK-112                                  USK-195
 DON GARCEAU                              SECUR/041399  VEVERA
   USK-109                                  USK-229
 THOMAS E. JACOBS......................2  EARL D. COOLEY
   USK-107                                  USK-269
 JIM TOWNSEND                             ERIC D. HENRY
   USK-108                                  USK-225
 SHOE SHOEMAKER                           BOB DOUGERT..........2
   USK-144                                  USK-356
 PAT CHAPPELL                             DEAN T. TYRE
   USK-074                                  USK-421
 DENNIS E. LOHAUS                         E HALL III...........2
   USK-069                                  USK-420
 RICHARD H. MURRAY.....................2  STEVE VELLIGAN
   USK-414                                  USK-213
 ROBERT RODRIGUEZ                         RANDY DUNCAN........2
   USK-198                                  USK-196
 ED DICRISTINA                            ROBERTO E. GALINANES
   USK-305                                  USK-353
 TERM/SECUR  WELLMAN                      DON GREEN...........2
   USK-346                                  USK-043
 TOM WELLS.............................2  RTW/SECUR  R. HOEFER
   USK-420                                  USK-453
 MARTIN L. CARLSON                        PEGGY S. HATTAWAY
   USK-420                                  USK-246
 JUDY HOOPER...........................3  GARY A. WOODS
   USK-247                                  USK-281
 STEVE GODFREY                            ANN M. MICKLOS
   USK-241                                  USK-443
 BILL NUTTER...........................5  062599/HRMS  POSTON
   USK-214                                  USK-598
 JANIENE L. PAPE                          PAUL E. BRANDT
   USK-284                                  USK-111
 
 
 DATE:  1999-07-08   12.01.55
 
 S0007VL3
 
 SHUTTLE COUNTDOWN (LPS)
 
 DISTRIBUTION F - FINAL
 
 
 OZZIE FISH............................2  RENEE HART
   USK-314                                  USK-669
 ANDY BUNDY                               DONALD G. SIMMONS
   PK-E3                                    USK-647
 DAVID R. SCHECHTER                       BOBBY E. ORR
   PZ-C                                     USK-607
 JIMBO BOLTON                             OLAN J. BERTRAND
   USBI-LSS                                 CA4
 BILL CLEVER II                             HOUSTON, TX  77058
   SK                                     KEN FORD
 KATHLEEN A. CONWAY                         USK-637
   USK-669                                RICHARD MIZELL
 TERRI L. HERST                             PK-F6
   PK-D                                   LARRY E. WILSON
 ED MANGO                                   USK-412
   PK-D2                                  ERVIN G. WALKER
 SCOTT CHANDLER                             JCI-VITC-2
   PK-E4                                  ANGELO PACE
 MICHAEL GARSKE                             USK-682
   DF24                                   RANDY DAVIES
   JSC, TX  77058                           CSR-3200
 STEVE SWICHKOW                             CAPE CANAVERAL AFS, FL 32899
   PK-F6                                  RONALD W. WETMORE
 AL DIAZ                                    MMC-15
   PK-F                                   HAROLD E. REED
 BOB BEIL                                   JJ-3-B
   PK-G3                                  CHUCK GIVENS
 ANDY DIBBERN                               BOC-342
   PK-G6                                  RAYMOND G. PREECE
 PETE CHITKO                                ZK-07
   PK-H6                                  RAY W. NUSS
 GREG KATNIK                                EV4
   PK-H7                                    JOHNSON SPACE CENTER
 JORGE E. RIVERA                            HOUSTON, TX  77058
   PK-H7                                  ROBERT B. LUECKING
 PHIL WEBER                                 ZK-86
   PK-H6                                  MATTHEW J. HOFMANN
 PAT MARKEY                                 ROC-LSS
   PK-J
 
 
 DATE:  1999-07-08   12.01.55
 
 S0007VL3
 
 SHUTTLE COUNTDOWN (LPS)
 
 DISTRIBUTION F - FINAL
 
 
 JIM ALLAMON                              CALVIN J. CULBERTSON..2
   ZK-21                                    FC-51
 CANDICE F. NORMAN.....................2    CCAS, FL  32899
   BOC-349                                LISA A. MALONE
 JOYCE M. ROZEWSKI                          PA-MSB
   FA-24                                  BRUCE D. BOUTON
 TOM HILL                                   8A-44
   ASC/ERD-FL                               BOEING DEFENSE & SPACE G
 TAB CHOATE                                 P.O. BOX 3999
   SA21                                     SEATTLE, WA   98124-2499
   BOEING - ROCKETDYNE DIVI                 K. GRANT
   MARSHALL SPACE FLIGHT CE                 USH-440X
   BLDG 4202, RM 405                        UNITED SPACE ALLIANCE
   HUNTSVILLE, AL  35812                    600 GEMINI
 TONY IPPOLITO                              HOUSTON, TX  77058
   MILA                                   JERRY L. GREENWOOD
 NEAL E. VANSCYOC                           3731
   F224                                     MICHOUD ASSY FACILITY
 JAMES B. PARKS                             LOCKHEED MARTIN
   PK-J-B                                   P.O. BOX 29304
 PHIL LINTEREUR........................3    NEW ORLEANS, LA  70189
   F264                                   ALEX RODRIGUEZ........3
 CECIL G. BOGGS JR                          ZK-86
   BOC-323                                DEBBIE HAHN
 PETE WILSON                                NN-M2
   ZK-07                                  MEGAN MISCHKOT
 JAMES REED                                 N/A
   EY-C                                     MICHOUD ASSEMBLY FACILIT
 ROBERT L. WRIGHT                           P.O. BOX 29300
   CSR-4222B                                NEW ORLEANS, LA  70189
 WHIT BARTLETT                              DEPT 4250
   PK-D2                                  JILL JAHNKOW..........2
 FERDINAND JONES                            FA-99
   AC-58                                    BOEING NORTH AMERICAN
   BOEING NORTH AMERICAN                    MISSION SUPPORT ROOM
   6633 CANOGA AVE                          12214 LAKEWOOD BLVD
   CANOGA PARK, CA  91304                   DOWNEY, CA  90241
                                          JOANNE CREECH
                                            BOC-022