VOLUME 5 OF 5                                        OMI NO. - S0007VL5
DATE: 07-01-99                                       REV.    - Z-1
 
 
 
                        SHUTTLE COUNTDOWN (LPS)
 
                               MAT COPY
 
 
DRAFT COPY
----------
RECIPIENT(S) SHALL REVIEW THIS COPY AND SUBMIT INPUT TO:
 
SFOC OMD:____________________  RM:________  EXT:________  DATE:________
 
 
PRELIMINARY REVIEW COPY
-----------------------
RECIPIENTS SHALL REVIEW THIS COPY, COORDINATE INPUT WITH CUSTOMER
COUNTERPARTS AND BRING MARKED UP COPY OF JOINT FUNCTIONAL INPUT
TO THE REVIEW MEETING SCHEDULED FOR:
 
DATE:__________  TIME:__________  RM:__________
 
FINAL REVIEW SIGNOFF COPY
-------------------------
RECIPIENTS SHALL REVIEW THIS COPY, COORDINATE INPUT WITH CUSTOMER
COUNTERPARTS AND BRING MARKED UP COPY OF JOINT FUNCTIONAL INPUT
TO SIGNOFF REVIEW MEETING SCHEDULED FOR:
 
DATE:__________  TIME:__________  RM:__________
 
 
PAGE BREAK COPY
---------------
RECIPIENT(S) SHALL REVIEW THIS COPY AND SUBMIT INPUT TO:
 
SFOC OMD:____________________  RM:________  EXT:________  DATE:________
 
                                             NOTE
 
                              IN EVENT OF A DISCREPANCY, THE
                              PUBLISHED OMI REVIEW MEETING SCHEDULE
                              TAKES PRECEDENCE OVER THIS SCHEDULE.
 
OMI TECHNICAL CONTACT:  ROGER GILLETTE, 1-7437                          |
 
OMI WRITER:  PAM STIELER, 1-4958
 
 
DISTRIBUTION PER ATTACHED DISTRIBUTION LIST
 
 
   ------------------------------------------------------------------
             THIS PROCEDURE CONTAINS HAZARDOUS OPERATIONS
   ------------------------------------------------------------------
 
 
 
VOLUME 5 OF 5                                        OMI NO. - S0007VL5
DATE: 07-01-99                                       REV.    - Z-1
 
                         UNITED SPACE ALLIANCE
 
 
         ********************************************************
         *                                                      *
         *               SHUTTLE COUNTDOWN - (LPS)              *
         *                                                      *
         ********************************************************
         *  EFFECTIVITY            CATEGORY: A                  *
         *                                   HA-SVTBAMQDGCWZF   *
         *                                   +ER                *
         *    CENTER:    KSC                                    *
         *                         SYSTEM:   TCO                *
         *    SITE: PAD A/B                                     *
         *                                                      *
         *    VEHICLE:   OV-102,103,104,105                     *
         *                                                      *
         *    FLOW: ALL                                         *
         *                                                      *
         *    DESIGN CENTER CONCURRENCE:     JSC & MSFC         *
         ********************************************************
 
   PREPARED BY:
 
   _________________________________
   SFOC TEST DOCUMENTATION
 
   APPROVED BY:
 
              CONTRACTOR
 
 
   _________________________________
   SFOC SAFETY ENGINEERING
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
   ------------------------------------------------------------------
             THIS PROCEDURE CONTAINS HAZARDOUS OPERATIONS
   ------------------------------------------------------------------
 
 
 
VOLUME 5 OF 5                                        OMI NO. - S0007VL5
DATE: 07-01-99                                       REV.    - Z-1
 
 
 
 
 
 
 
 
 
 
 
         ********************************************************
         *                                                      *
         *               SHUTTLE COUNTDOWN - (LPS)              *
         *                                                      *
         ********************************************************
         *  EFFECTIVITY            CATEGORY: A                  *
         *                                   HA-SVTBAMQDGCWZF   *
         *                                   +ER                *
         *    CENTER:    KSC                                    *
         *                         SYSTEM:   TCO                *
         *    SITE: PAD A/B                                     *
         *                                                      *
         *    VEHICLE:   OV-102,103,104,105                     *
         *                                                      *
         *    FLOW: ALL                                         *
         *                                                      *
         *    DESIGN CENTER CONCURRENCE:     JSC & MSFC         *
         ********************************************************
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
VOLUME 5 OF 5                                        OMI NO. - S0007VL5
DATE: 07-01-99                                       REV.    - Z-1
 
                         UNITED SPACE ALLIANCE
 
 
         ********************************************************
         *                                                      *
         *               SHUTTLE COUNTDOWN - (LPS)              *
         *                                                      *
         ********************************************************
         *  EFFECTIVITY            CATEGORY: A                  *
         *                                   HA-SVTBAMQDGCWZF   *
         *                                   +ER                *
         *    CENTER:    KSC                                    *
         *                         SYSTEM:   TCO                *
         *    SITE: PAD A/B                                     *
         *                                                      *
         *    VEHICLE:   OV-102,103,104,105                     *
         *                                                      *
         *    FLOW: ALL                                         *
         *                                                      *
         *    DESIGN CENTER CONCURRENCE:     JSC & MSFC         *
         ********************************************************
   PREPARED BY:
 
   _________________________________
   SFOC TEST DOCUMENTATION
 
   APPROVED BY:
 
              CONTRACTOR                          GOVERNMENT
 
 
   _________________________________         ___________________________
   ORBITER TEST DIRECTOR                     NASA TEST DIRECTOR
 
 
   _________________________________
   SFOC SAFETY ENGINEERING
 
 
 
 
 
 
 
 
 
 
 
 
 
 
   ------------------------------------------------------------------
             THIS PROCEDURE CONTAINS HAZARDOUS OPERATIONS
   ------------------------------------------------------------------
 
 
 
VOLUME 5 OF 5                                        OMI NO. - S0007VL5
DATE: 07-01-99                                       REV.    - Z-1
 
                         REVISION RECORD PAGE
                         --------------------
 
   REV-CHANGE     DATE      REASON       PAGES AFFECTED     EFFECTIVITY
   ---------------------------------------------------------------------
   W          : 03-14-98 : 70/USK217: ALL                  : ALL
   ---------------------------------------------------------------------
   W-1        : 05-16-98 : 71/USK023: 69,70,115-118,233,   : ALL
              :          :          : 234,251,252,259,260, :
              :          :          : 351,352,911-920,925, :
              :          :          : 926,935,936,947,948, :
              :          :          : 953,954,1199,1200,   :
              :          :          : 1275,1276,1331,1332, :
              :          :          : 1351,1352,1431-1434, :
              :          :          : 1467,1468            :
   ---------------------------------------------------------------------
   X          : 10-08-98 : 72/USK217: ALL                  : ALL
   ---------------------------------------------------------------------
   Y          : 11-19-98 : 73/USK217: ALL                  : ALL
              :          : RCN      :                      :
              :          : MB13421  :                      :
   ---------------------------------------------------------------------
   Z          : 05-06-99 : 74/USK206: ALL                  : STS-96&SUBS
              :          : 75/USK217:                      :
   ---------------------------------------------------------------------|
   Z-1        : 07-01-99 : 76/USK217: 151,152,173,191,243, : STS-93&SUBS|
              :          :          : 243.1,243.2,260,284, :            |
              :          :          : 297,301-303,837,839, :            |
              :          :          : 840,847,975,978,1222,:            |
              :          :          : 1298,1417,1418,1426, :            |
              :          :          : 1429,1492-1495,1503, :            |
              :          :          : 1504,1524,1563,1564  :            |
   ---------------------------------------------------------------------
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
VOLUME 5 OF 5                                        OMI NO. - S0007VL5
DATE: 07-01-99                                       REV.    - Z-1
 
 
 
 
                        BACKUP SIGNATURE SHEET
 
         OMI TITLE: SHUTTLE COUNTDOWN (LPS)
 
                  AGENCY                        SIGNATURES
 SYSTEM       CONTRACTOR/NASA      CONTRACTOR           GOVERNMENT
 ------       ---------------      ----------           ----------
 
 SUPPORT
 -------
 
 TSMO         SFOC                 ___________________  NA
 
 TIMING/
 COUNTDOWN    CSR                  ___________________  NA
 
 RPS          GTSI /NASA           ___________________  _______________
 
 CCMS/LPS     GTSI /NASA           ___________________  _______________
 
 ETR          PAA/SRO              ___________________  NA
 
 MEASUREMENTS GTSI /NASA           ___________________  _______________
 
 PHOTO        TGS                  ___________________  NA
 
 MILA         BFEC/GUSB            ___________________  NA
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
VOLUME 5 OF 5                                        OMI NO. - S0007VL5
DATE: 07-01-99                                       REV.    - Z-1
 
 
 
 
                        BACKUP SIGNATURE SHEET
 
         OMI TITLE: SHUTTLE COUNTDOWN (LPS)
 
                  AGENCY                        SIGNATURES
 SYSTEM       CONTRACTOR/NASA      CONTRACTOR            GOVERNMENT
 ------       ---------------      ----------           ------------
 
 PAYLOAD
 -------
 
 TEST COND/
 DIRECTOR     CONTR/NASA (ROR)     ___________________  _______________
 
 SAFETY       CONTR                ___________________  NA
 
 MIDDECK EXP  CS-EED-1             NA                   _______________
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
VOLUME 5 OF 5                                        OMI NO. - S0007VL5
DATE: 07-01-99                                       REV.    - Z-1
 
 
 
 
                        BACKUP SIGNATURE SHEET
 
         OMI TITLE: SHUTTLE COUNTDOWN (LPS)
 
                  AGENCY                        SIGNATURES
 SYSTEM       CONTRACTOR/NASA      CONTRACTOR           GOVERNMENT
 ------       ---------------      ----------           ----------
 
 ORBITER
 -------
 
 NAVAIDS      SFOC/NASA            ___________________  ________________
 
 COMM         SFOC/NASA            ___________________  ________________
 
 INSTR        SFOC/NASA            ___________________  ________________
 
 HGDS         SFOC/NASA            ___________________  ________________
 
 PVD          SFOC/NASA            ___________________  ________________
 
 LAUNCH ACC   SFOC/NASA            ___________________  ________________
 
 EPD&C        SFOC/NASA            ___________________  ________________
 
 DPS          SFOC/NASA            ___________________  ________________
 
 DPSME        SFOC/NASA            ___________________  ________________
 
 QE           SFOC                 ___________________  NA
 
 SAFETY       SFOC                 ___________________  NA
 
 MPS          SFOC/NASA            ___________________  ________________
 
 SSME         SFOC/NASA            ___________________  ________________
 
 SSME         ROCKETDYNE           ___________________  NA
 
 APU          SFOC/NASA            ___________________  ________________
 
 HYDRAULICS   SFOC/NASA            ___________________  ________________
 
 
 
 
 
 
 
 
 
 
 
 
VOLUME 5 OF 5                                        OMI NO. - S0007VL5
DATE: 07-01-99                                       REV.    - Z-1
 
 
 
 
                        BACKUP SIGNATURE SHEET
 
         OMI TITLE: SHUTTLE COUNTDOWN (LPS)
 
                  AGENCY                        SIGNATURES
 SYSTEM       CONTRACTOR/NASA      CONTRACTOR           GOVERNMENT
 ------       ---------------      ----------           ----------
 
 ORBITER (CONT)
 --------------
 
 PRSD         SFOC/NASA           ___________________  ________________
 
 MECH/STRUC   SFOC/NASA           ___________________  ________________
 
 OMS/RCS      SFOC/NASA           ___________________  ________________
 
 ECLSS        SFOC/NASA           ___________________  ________________
 
 TPE/PEO      SFOC/NASA           ___________________  ________________
 
 VITT         NASA/JSC             NA                   _______________
 
 JSC RESIDENT
 OFFICE       NASA/JSC             NA                   _______________
 
 TPS          SFOC/NASA           ___________________  ________________
 
 FCS          SFOC/NASA           ___________________  ________________
 
 G&N          SFOC/NASA           ___________________  ________________
 
 FLT CNTLS    SFOC/NASA           ___________________  ________________
 
 ORB SOFTWARE SFOC/NASA           ___________________  ________________
 
 JSC MISSION
 INTEGRATION  RI-LSS/JSC-TA       ___________________  _______________
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
VOLUME 5 OF 5                                        OMI NO. - S0007VL5
DATE: 07-01-99                                       REV.    - Z-1
 
 
 
 
                        BACKUP SIGNATURE SHEET
 
         OMI TITLE: SHUTTLE COUNTDOWN (LPS)
 
                  AGENCY                        SIGNATURES
 SYSTEM       CONTRACTOR/NASA      CONTRACTOR           GOVERNMENT
 ------       ---------------      ----------           ----------
 
 ET/SRB
 ------
 
 TEST COND    SFOC (ROR)           ___________________  NA
 
 PROJ ENGR    SFOC/NASA            ___________________  ________________
 
 EPD&C        SFOC/NASA            ___________________  ________________
 
 INSTR        SFOC/NASA            ___________________  ________________
 
 MECH (ET)    SFOC/NASA            ___________________  ________________
 
 STRUC        SFOC/NASA            ___________________  ________________
 
 ORDNANCE     SFOC/NASA            ___________________  ________________
 
 PNEUMATICS   SFOC/NASA            ___________________  ________________
 
 TPS          SFOC/NASA            ___________________  ________________
 
 PROPELLANTS/
 LO2          SFOC/NASA            ___________________  ________________
 
 PROPELLANTS/
 LH2          SFOC/NASA            ___________________  ________________
 
 MECH (SRB)   SFOC/NASA            ___________________  ________________
 
 SRSS         SFOC/NASA            ___________________  ________________
 
 FLT CNTLS    SFOC/NASA            ___________________  ________________
 
 DPS          SFOC/NASA            ___________________  ________________
 
 HYD          SFOC/NASA            ___________________  ________________
 
 
 
 
 
 
 
 
 
 
VOLUME 5 OF 5                                        OMI NO. - S0007VL5
DATE: 07-01-99                                       REV.    - Z-1
 
                        BACKUP SIGNATURE SHEET
 
         OMI TITLE: SHUTTLE COUNTDOWN (LPS)
 
 
                  AGENCY                        SIGNATURES
 SYSTEM       CONTRACTOR/NASA      CONTRACTOR               NASA
 ------       ---------------      ----------           ------------
 
 PAYLOAD
 -------
 
 __________   _______________      ___________________  _______________
 TEST
 CONDUCTOR    MDSSC                ___________________  NA
 
 P/L INTEG
 ENGR         MDSSC/CS-PPD-1       ___________________  _______________
 
 ELECT INTEG  MDSSC/CS-PPD-32      ___________________  NA
 
 SOFTWARE     MDSSC/SC-PPD-33      ___________________  NA
 
 IUS          BAO/6555TH           ___________________  _______________
 
 MIDDECK EXP  CS-EED-1             NA                   _______________
 
 ULS          ESA                  ___________________  NA
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
VOLUME 5 OF 5                                        OMI NO. - S0007VL5
DATE: 07-01-99                                       REV.    - Z-1
 
                       DESIGN CENTER CONCURRENCE
                        BACKUP SIGNATURE SHEET
                       -------------------------
 
         OMI TITLE: SHUTTLE COUNTDOWN (LPS)
 
                  AGENCY                        SIGNATURES
 SYSTEM       CONTRACTOR/NASA      CONTRACTOR*              NASA
 ------       ---------------      -----------          ------------
 
 ORBITER      RI LSS LEVEL III     ___________________          NA
 
 ORBITER      JSC LEVEL III                  NA         _______________
 
 ET           MMC LSS              ___________________          NA
 
 ET           MSFC LEVEL III                 NA         _______________
 
 SRB          USBI LSS             ___________________          NA
 
 SRB          MSFC LEVEL III                 NA         _______________
 
 SSME         ROCKETDYNE LSS       ___________________          NA
 
 SSME         MSFC LEVEL III                 NA         _______________
 
 NSTS CARGO
 ENGR INTEG   RI LSS LEVEL II      ___________________          NA
 
 NSTS INTEG
 OPS          CARGO LEVEL II                 NA         _______________
 
 NSTS
 ENGR INTEG   JSC LEVEL II                   NA         _______________
 
 VITT         TP-TMS-A                       NA         _______________
 
 JSC MISSION
 INTEGRATION  RI-LSS/JSC-TA        ___________________  _______________
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
VOLUME 5 OF 5                                        OMI NO. - S0007VL5
DATE: 07-01-99                                       REV.    - Z-1
 
                         TABLE OF CONTENTS
                         -----------------
 
                                                              PAGE
                                                              ----
 
COVER PAGE
APPROVAL PAGE/CHANGE RECORD PAGE
TABLE OF CONTENTS
OBJECTIVE/DESCRIPTION .....................................     NA
ILLUSTRATIONS .............................................     NA
HAZARDOUS MANLOADING ......................................     NA
BAR CHARTS ................................................     NA
 
SECTION I - INFORMATION
 
    1.1  REFERENCED INSTRUCTIONS...........................      1
    1.2  COMPUTER SYSTEMS .................................     NA
    1.3  SPECIAL TOOLS, EQUIPMENT AND MATERIALS ...........     NA
    1.4  SUPPORT TOOLS, EQUIPMENT AND MATERIALS ...........     NA
    1.5  PERSONNEL REQUIREMENTS............................      5
    1.6  SAFETY REQUIREMENTS ..............................     NA
    1.7  SPECIAL INSTRUCTIONS  ............................     NA
    1.8  OMRS REQUIREMENTS SATISFIED BY THIS TOP...........      6
 
SECTION II - PRE-OPERATION SETUP INSTRUCTIONS                   NA
 
SECTION III - OPERATION SUPPORT SETUP INSTRUCTIONS              NA
 
SECTION IV - OPERATION INSTRUCTIONS
 
    98-000   PREPLANNED CONTINGENCY PROCEDURES............       9
    98-001   ECS/PVD......................................       9
    98-002   VENT DOOR OVERRIDE OPERATION (CONTINGENCY)....      9
    98-015   ORBITER VENT DOOR INDICATOR ANOMALY PREPLANNED
             CONTINGENCY PROCEDURE (CPVD)..................     13
    98-025   OPTION A - VENT DOOR OPEN INDICATOR ON SHOULD
             BE OFF........................................     20
    98-036   OPTION C - VENT DOOR PURGE INDICATOR ON SHOULD
             BE OFF........................................     28
    98-044   OPTION D - VENT DOOR PURGE INDICATOR OFF
             SHOULD BE ON..................................     32
    98-049   OPTION E - VENT DOOR CLOSE INDICATOR OFF
             SHOULD BE ON..................................     35
    98-055   OPTION F - VENT DOOR CLOSE INDICATOR OFF
             SHOULD BE ON..................................     39
 
 
 
 
 
 
 
 
 
 
 
VOLUME 5 OF 5                                        OMI NO. - S0007VL5
DATE: 07-01-99                                       REV.    - Z-1
 
    99-000   EPD (GSE)....................................      43
    99-001   GROUND PIC PREMATURE ARM FAILURE..............     43
    99-014   LAUNCH RELEASE PIC FIRE 1 ANOMALY (REF SSID
             GSE-25)......................................      48
    100-000  LACC (GSE)....................................     53
    100-001  OAA ACCUMULATOR RECHARGE FAILURE (LCC GSE-11)      53
    100-004  OAA/GVA ARM POSITION VERIFICATION............      54
    100-006  OAA RETRACT RECONFIGURATION..................      54
    100-007  OAA LPS EXTEND/RETRACT........................     54
    100-008  OAA 2700 PSIG GN2 ADJUSTMENT..................     54
    100-009  SOUND SUPPRESSION SOLENOID POWER BUS FAILURE..     54
    100-012  SOUND SUPPRESSION FR CMD BUS FAILURE..........     56
    101-000  BUHGDS REMOTE PMSC RESET AFTER TERMINAL
             KEYBOARD LOCKUP..............................      57
    101-012  HGDS TO BUHGDS SWITCH OVER AND RECOVERY
             CONTINGENCY..................................      61
    102-000  ET............................................     67
    102-001  ET LO2/LH2....................................     67
    102-002  ET NOSECONE PURGE TEMPERATURE (SWITCH TO
             HEATER OUTPUT CONTROL) (CIF) (REF LCC ET-01)
             (T-6 HR THRU T-1M15S)........................      68
    102-003  ET NOSECONE PURGE TERMINATION (CIF) (REF LCC
             ET-02) (T-1M15S)..............................     69
    102-004  ET LO2 HELIUM INJECT TERMINATION (CIF) (REF
             LCC ET-03) (T-4M20S)..........................     70
    102-005  ET LH2 ULLAGE PRESSURE SWITCHOUT (CIF) (REF
             LCC ET-05)....................................     71
    102-006  ET LO2 ULLAGE PRESSURE FAILURE (CIF) (REF LCC
             ET-06)........................................     72
    102-007  ET LO2 FLIGHT LEVEL MONITOR (CIF) (REF LCC
             ET-10) (T-19M THRU T-5M)......................     73
    102-008  ET LO2 DRAINBACK (CIF) (REF LCC MPS-09)
             (T-4M55S TO T-48S)............................     74
    102-009  ET INTERTANK TEMPERATURE (T-1 HOUR TO T-3 MIN)
             (ET-07)......................................      75
    102-010  ET INTERTANK PURGE TERMINATION (T-1 MIN 15
             SEC) (ET-08)..................................     76
    102-011  ET LH2 FLIGHT LEVEL MONITOR (T-1 MIN 57 SEC)
             (ET-09)......................................      77
    102-012  ET LH2 FILL LINE DRAIN (T-1 MIN 38 SEC TO T-48
             SEC) (MPS-06)................................      78
    102-013  EXCESSIVE H2 CONCENTRATION IN LH2 TSM (FROM
             START OF LH2 LOADING TO T-1 MIN 57 SEC)
             (HAZ-10)......................................     79
    102-014  T-0 UMBILICAL EXCESSIVE H2 CONCENTRATION AT 8
             IN. FEEDLINE TORQUE BOX (FROM START OF LH2
             LOADING TO T-1 MIN 57 SEC) (HAZ-11)..........      80
 
 
 
 
 
 
 
 
 
 
VOLUME 5 OF 5                                        OMI NO. - S0007VL5
DATE: 07-01-99                                       REV.    - Z-1
 
    102-015  EXCESSIVE H2 CONCENTRATION AT ET GROUND
             UMBILICAL (FROM START OF LH2 LOADING TO T-1
             MIN 57 SEC) (HAZ-09)..........................     81
    102-016  BIPOD HEATER TO ALTERNATE POWER..............      82
    103-000  SRB..........................................      95
    103-096  SRB RECOVERY SYSTEM PIC CAP VOLTAGE ANOMALY
             SSID:BREC-02..................................    135
    103-100  SRB IGNITION S & A CONTINGENCY PROCEDURE......    136
    104-000  MPS..........................................     141
    105-000  SSME..........................................    143
    105-001  SSME FUEL SYSTEM PURGE CONTINGENCY............    143
    105-006  SSME MOV/MFV HYDRAULIC TEMPERATURE CONTINGENCY    144
    105-012  SSME LPOT DISCHARGE PRESSURE CONTINGENCY......    145
    105-024  SSMEC RE-INITIALIZATION OF ENGINE READY
             MONITORING AND FAILURE ID PARAMETER..........     148
    105-031  SSME ANTIFLOOD VALVE DOWNSTREAM SKIN TEMP
             CONTINGENCY (REF LCC SSME-04)................     151
    105-040  SSME HPOTP IMSL PURGE ANOMALY CONTINGENCY (REF
             LCC SSME-10)..................................    155
    106-000  PRSD/FUEL CELL................................    159
    106-001  PROBLEM: O2 TANK PRESS OR HTR CNTL PRESS LOW
             (SSID PRSD-01)................................    160
    106-002  PROBLEM: O2 TANK PRESS OR HTR CNTL PRESS HIGH
             (SSID PRSD-01)................................    162
    106-003  PROBLEM: O2 OR H2 MANIF ISO VLV INDICATES
             CLOSED (SSID PRSD-02)........................     164
    106-004  PROBLEM: FCP REACT VLV INDICATES CLOSED (SSID
             PRSD-03)......................................    165
    106-005  PROBLEM: ONE O2 HTR CURRENT TRIP SNSR ON (SSID
             PRSD-04)......................................    167
    106-006  PROBLEM: T-0 VLV INDICATES OPEN (SSID PRSD-05)    169
    106-007  PROBLEM: H2 TANK PRESS OR HTR CNTL PRESS LOW
             (SSID PRSD-06)................................    170
    106-008  PROBLEM: H2 TANK PRESS OR HTR CNTL PRESS HIGH
             (SSID PRSD-06)................................    172
    106-009  PROBLEM: O2 TANK QUANTITY LOW, H2 TANK
             QUANTITY LOW (SSID PRSD-07/08)................    174
    106-010  PROBLEM: O2 ECS VLV INDICATES CLOSED (SSID
             PRSD-09)......................................    175
    106-011  PROBLEM: FCP VOLTS LOW (SSID FCP-01..........     176
    106-012  PROBLEM: FCP CURRENT LOW (SSID FCP-01)........    177
    106-013  PROBLEM: FCP TEMPS (STACK IN, STACK OUT,
             CONDENSER EXIT) HIGH OR LOW (SSID FCP-02)....     178
    106-014  PROBLEM: SUBSTACK DELTA V NEAR 50 MV OR NEAR 0
             MV (SSID FCP-03)..............................    179
    106-015  PROBLEM: SUBSTACK DELTA V > 28MV CHANGE DURING
             LOAD ADJUST (SSID FCP-03)....................     180
    106-016  PROBLEM: SUBSTACK DELTA V > 18 MV CHANGE AT
             STEADY STATE LOADS (SSID FCP-03)..............    181
 
 
 
 
 
 
 
 
VOLUME 5 OF 5                                        OMI NO. - S0007VL5
DATE: 07-01-99                                       REV.    - Z-1
 
    106-017  PROBLEM: FCP COOLANT PRESS LOW/HIGH (SSID
             FCP-04)......................................     182
    106-018  PROBLEM: FCP COOLANT PUMP INDICATES OFF (SSID
             FCP-04)......................................     183
    106-019  PROBLEM: H2 PUMP MOTOR CONDITION HIGH OR LOW
             (SSID FCP-04)................................     184
    106-020  PROBLEM: PH SNSR ON > 5 MINUTES (SSID FCP-05)     185
    106-021  FUEL CELL WATER PH SENSOR TEST AT GALLEY......    186
    106-039  PROBLEM: RLF NOZZLE TEMP HIGH OR LOW (A OR B)
             (SSID FCP-05)................................     191
    106-040  PROBLEM: RLF VLV TEMPS, RLF LINE TEMPS, ALT
             LINE TEMPS LOW (SSID FCP-06)..................    192
    107-000  OMS/RCS......................................     193
    107-001  RCS THRUST INJECTOR TEMPERATURE ANOMALY
             (RCS-06)......................................    194
    107-002  RCS THRUST INJECTOR TEMPERATURE ANOMALY
             (RCS-06) (CONT'D)............................     195
    107-003  RCS THRUST INJECTOR TEMPERATURE ANOMALY
             (RCS-06) (CONT'D)............................     196
    107-004  RCS THRUST CHAMBER PRESSURE (RCS-08)..........    197
    107-005  RCS CHAMBER PRESSURE INDICATION ANOMALY......     197
    107-006  LEFT OMS CROSSFEED B VALVE ANOMALY (OMS 07)..     197
    107-007  LOMS CROSSFEED B OXID OR FUEL VALVE PRESENCE
             OF OPEN VP1 OPTION............................    198
    107-016  LOMS CROSSFEED B OXID OR FUEL VALVE LACK OF
             CLOSED VP1 OPTION............................     201
    107-018  OMS GN2 ARM VALVE ANOMALY (OMS 10)............    203
    107-020  OMS GN2 ARM VALVE ANOMALY (OMS 10) COMPLETE..     203
    108-000  APU..........................................     205
    109-000  HYD..........................................     247
    109-001  LCC HY10 WSB OK ANOMALY......................     247
    109-002  WSB "OK" AFTER T-30M N2 VALVE ACTIVATION......    247
    110-000  ECLSS........................................     249
    110-001  CABIN VENT....................................    249
    110-002  DUMP POTABLE WATER THRU THE OVERBOARD BLEED
             VALVE........................................     249
    110-003  VENT GN2 FROM THE GAS SIDE OF THE POTABLE
             WATER TANKS..................................     249
    110-004  CONFIRM HEATER STRING FAILURE................     249
    110-005  RECONFIGURE FES CONTROLLER....................    249
    110-006  TRANSFER GCU SUPPORT TO BACKUP................    249
    110-007  LOSS OF ALL THREE SETS OF S70-0509/0510 REFR
             UNITS........................................     250
    110-008  S70-0510 RESTART (510 AMPERAGE LESS THAN 2....    251
    110-009  S70-0509 RESTART (UNIT OFF)..................     252
    110-010  S70-0509 PROBLEM INDICATION RESET (FOR INFO
             ONLY AFTER T-6 HOURS)........................     253
    110-011  S70-1203 CRITICAL FAULT......................     254
 
 
 
 
 
 
 
 
 
VOLUME 5 OF 5                                        OMI NO. - S0007VL5
DATE: 07-01-99                                       REV.    - Z-1
 
    110-012  S70-1203 PROBLEM INDICATION..................     255
    110-013  GCU HARDWIRE SAFING PANEL OPERATION
             (REFRIGERATION OPERATIONS ONLY)..............     255
    111-000  DPS/BFS......................................     257
    111-001  1. PASS MCDS ANOMALY RECOVERY................     258
    111-011  2. GPC I-FAIL CONTINGENCY (CIF)..............     262
    111-018  3. G1 FC MDM BYPASS RECOVERY..................    264
    111-036  4. G9 MDM BYPASS RECOVERY....................     268
    111-051  6. BFS I/O ERROR PCM RECOVERY................     272
    111-066  7. MMU2 POSITION TAPE ERROR RECOVERY..........    277
    111-088  8. BFS PL MDM BYPASS RECOVERY................     280
    111-106  9. BFS MCDS ANOMALY RECOVERY..................    283
    111-117  10. DDU GOOD FAILURE RECOVERY (CIF)..........     286
    111-139  11. DDU POWER SUPPLY A, B, OR C ANOMALY (CIF)     294
    111-152  12. G9 QUICK RECYCLE..........................    297
    111-193  13. REMOTE BFS DEACTIVATION..................     305
    112-000  COMM AND TRACK................................    311
    112-001  TACAN POWER STATUS PREPLANNED PROCEDURE
             (CT-01)......................................     311
    112-002  TACAN BLANKING - TEST PREPLANNED PROCEDURE....    313
    112-003  TACAN BLANKING - TEST PREPLANNED PROCEDURE....    315
    112-004  TACAN BLANKING - TEST PREPLANNED PROCEDURE....    316
    112-005  TACAN AGC (INTERFERENCE) PREPLANNED PROCEDURE     317
    112-006  TACAN AGC (INTERFERENCE) PREPLANNED PROCEDURE     318
    112-007  TACAN AGC (INTERFERENCE) PREPLANNED PROCEDURE     319
    112-008  RADAR ALTIMETER READY STATUS PREPLANNED
             PROCEDURE (CT-08)............................     320
    112-009  TACAN VALIDITY PREPLANNED PROCEDURE..........     322
    112-010  TACAN RECONFIGURE FOR A PRESSURE DROP........     326
    112-011  LCC PROCEDURE - AGC LOSS......................    327
    112-012  LCC PROCEDURE - AGC PARTIAL LOSS..............    328
    112-013  LCC PROCEDURE - GCIL INACTIVE................     329
    112-014  LCC PROCEDURE - NSP FRAME SYNC LOSS..........     330
    112-015  LCC PROCEDURE - PA POWER OUTPUT LOSS..........    331
    112-016  LCC SUB PROCEDURE - MILA OUTPUT VERIFY........    332
    112-017  COMM LCC SUB PROCEDURE - FRAME SYNC LOSS
             COMPARE......................................     333
    112-018  COMM LCC SUB PROCEDURE - CHECKOUT COMMANDS....    334
    112-019  COMM LCC SUB PROCEDURE - CMD TO STRING 2......    335
    112-020  S-BAND/UHF UPLINK/DOWNLINK NETWORK............    336
    112-021  A/G ORBITER DOWNLINK NETWORK..................    337
    112-022  A/G ORBITER UPLINK NETWORK....................    338
    112-023  A/G BACKUP LANDLINES AND ALTERNATE VOICE PATHS    339
    112-024  LCC PROCEDURE - NSP BITE FAILURE..............    340
    112-025  LCC PROCEDURE - A/G1 LOSS....................     341
    112-026  LCC SUB-PROCEDURE - KSC A/G1 PROBLEM..........    343
    112-027  LCC SUB-PROCEDURE - KSC/MILA AG1 PROBLEM......    346
    112-028  LCC PROCEDURE - MILA/JSC/GSFC AG1 PROBLEM....     348
 
 
 
 
 
 
 
 
 
VOLUME 5 OF 5                                        OMI NO. - S0007VL5
DATE: 07-01-99                                       REV.    - Z-1
 
    112-029  LCC PROCEDURE - ORBITER AG1 PROBLEM..........     349
    112-030  LCC PROCEDURE - FIXED AG1 LINK................    350
    112-031  CDR PLT OR MS2 VOICE FAILURE..................    351
    112-032  COMM LCC CONTINGENCY PROCEDURES..............     353
    112-033  COMM SUB PROCEDURES - MILA OUTPUT VERIFY......    353
    112-038  AGC TOTAL LOSS CONTINGENCY....................    356
    112-042  AGC PARTIAL LOSS CONTINGENCY..................    357
    112-073  GCIL INACTIVE CONTINGENCY....................     365
    112-128  FRAME SYNC LOSS CONTINGENCY..................     381
    112-151  UHF A/A VOICE LOSS CONTINGENCY................    387
    112-165  PA POWER OUT LOSS CONTINGENCY................     390
    112-209  SWITCH FROM LOW TO HIGH FREQUENCY OPTION......    400
    112-219  SWITCH FROM HIGH TO LOW FREQUENCY OPTION......    403
    112-229  COMM LCC PROCEDURES COMPLETE..................    405
    112-230  TACAN CHANNEL SELECT (59Y)....................    405
    112-236  TACAN MULTIPATH VERIFICATION (OPTIONAL)......     407
    112-245  FLIGHT CREW LOSS OF COMMUNICATION............     408
    113-000  INST LCC WORKAROUNDS..........................    411
    113-001  GENERAL INSTRUCTIONS FOR INST LCC WORKAROUNDS     411
    113-002  INS-01/PCM POWER STATUS......................     415
    113-003  INS-01/PCM MTU BITE..........................     416
    113-004  INS-01/FETCH PROM PARITY......................    417
    113-005  INS-01/128KB FORMATER........................     418
    113-006  INS-01/INPUT DATA VALID......................     419
    113-007  INS-01/RAM PARITY............................     420
    113-008  INS-01/TOGGLE BUFFER PARITY..................     421
    113-009  INS-01 PCMMU BITE BIT 14 - NO RESPONSE
             COMPUTER BUS V75X2134D........................    422
    113-010  INS-02/OPS 1 BITE............................     423
    113-011  INS-02/OPS 1 TEMP............................     424
    113-012  INS-02/OPS 1 MOTION..........................     425
    113-013  INS-02/OPS 2 BITE............................     426
    113-014  INS-02/OPS 2 TEMP............................     427
    113-015  INS-02/OPS 2 MOTION..........................     428
    113-016  INS-02/OPS 1 & 2 BITE........................     429
    113-017  INS-03/MTU AMP 1..............................    430
    113-018  INS-03/MTU AMP 2..............................    431
    113-019  INS-03/MTU FREQ DIFF..........................    432
    113-020  INS-03/MTU TEMP 1............................     433
    113-021  INS-03/MTU TEMP 2............................     434
    113-022  INS-03/MTU PS 1 VOLT..........................    435
    113-023  INS-03/MTU PS 2 VOLT..........................    436
    113-024  INS-03/MTU CMD CHAN A........................     437
    113-025  INS-03/MTU CMD CHAN B........................     438
    113-026  INS-03/MTU CMD CHAN C........................     439
    113-027  INS-03/MTU IRIG-B............................     440
    113-028  INS-03/MTU DIV 1..............................    441
    113-029  INS-03/MTU DIV 2..............................    442
 
 
 
 
 
 
 
 
 
VOLUME 5 OF 5                                        OMI NO. - S0007VL5
DATE: 07-01-99                                       REV.    - Z-1
 
    113-030  INS-03/MTU DIV 3..............................    443
    113-031  INS-04/DSC BITE FAIL..........................    444
    113-032  INS-05/MDM WRAP FAIL..........................    445
    113-033  INS-06/C/W FAILURE............................    446
    113-034  LCC SRM-11 - SRM CASE ACREAGE TEMPERATURE
             ANOMALY......................................     447
    113-035  NON LCC/RCD START UNCOMMAND..................     448
    113-036  NON LCC/RECORD MODE MUX FAIL..................    449
    113-037  NON LCC/DSC-MDM CARD FAIL....................     450
    113-038  NON LCC/CW LIGHT BULB FAIL....................    451
    113-039  NON LCC/RECORDER RUNTIME......................    452
    113-040  NON LCC/MADS ACTIVATION FAIL..................    453
    113-041  NON LCC/OI DATA DROPOUT......................     454
    113-042  NON LCC/GLS PCM TO GSE CNTL NOT PERFORMED....     455
    113-043  NON LCC/GLS PCM TO GSE CNTL NOT CONFIRMED....     456
    113-044  SCM FEEDBACK NOT FA OR 99....................     457
    113-045  INSTRUMENTATION DETAILED WORKAROUND STEPS....     458
    113-046  DETAIL A - PCM SWITCH TO ALTERNATE PCM........    458
    113-052  DETAIL B - TFL RELOAD FOR FLIGHT..............    461
    113-068  DETAIL C - OPS 1 AND 2 BITE VERIFICATION......    464
    113-080  DETAIL D - PSP VERIFICATION..................     467
    113-106  DETAIL E - FMSP 1 VERIFICATION................    474
    113-116  DETAIL F - FMSP 2 VERIFICATION................    476
    114-000  EPDC..........................................    479
    114-001  FUEL CELL AND MAIN BUS VOLTAGE FAILURE (REF
             SSID EPDC-01)................................     479
    114-002  CONTROL BUS SOURCE FAILURE (REF SSID EPDC-02)     480
    114-003  AC CURRENT MEASUREMENTS FAILURE (REF SSID
             EPDC-04)......................................    481
    114-004  ESSENTIAL BUS SOURCE FAILURE (REF SSID
             EPDC-06)......................................    482
    114-005  MEC CORE "B" POWER (REF SSID EPDC-08)........     483
    115-000  GNC..........................................     485
    115-001  FWD RHC COMMAND ANOMALY (GNC-01)..............    485
    115-002  ORBITER RATE GYRO POWER ANOMALY (GNC-08)......    486
    115-003  ACCELEROMETER POWER ANOMALY (GNC-09)..........    487
    115-004  ACCELEROMETER POWER ANOMALY (GNC-09) CONT'D..     488
    115-005  ACCELEROMETER POWER ANOMALY (GNC-09) CONT'D..     489
    115-006  SRB BUS C POWER (GNC-10)......................    490
    115-007  PROCEDURE FOR LOSS FOR MEAS: V76X4393E1 LEFT
             SRB BUS C RPC C..............................     490
    115-008  PROCEDURE FOR LOSS FOR MEAS: V76X4394E1 RIGHT
             SRB BUS C RPC C..............................     491
    115-009  PROCEDURE FOR LOSS OF MEAS: V76X4399E1 LEFT
             SRB BUS C RPC A..............................     492
    115-010  PROCEDURE FOR LOSS OF MEAS: V76X4390E1 RIGHT
             SRB BUS C RPC A..............................     493
    115-011  ORBITER RATE GYRO FAIL (GNC-12)..............     494
 
 
 
 
 
 
 
 
 
VOLUME 5 OF 5                                        OMI NO. - S0007VL5
DATE: 07-01-99                                       REV.    - Z-1
 
    115-014  ACCELEROMETER FAIL (GNC-13)..................     496
    115-017  ELEVON ACTUATOR POSITION ANOMALY (GNC-22)....     498
    115-018  ELEVON ACTUATOR POSITION ANOMALY (GNC-22) CONT    499
    115-019  ELEVON SECONDARY DELTA PRESSURE ANOMALY
             (GNC-24)......................................    500
    115-020  ELEVON AEROSURFACE PROFILE ANOMALY (GNC-25)..     502
    115-021  RUDDER/SPEEDBRAKE POSITION ANOMALY (GNC-26)..     503
    115-022  RUDDER/SPEEDBRAKE POSITION ANOMALY (GNC-26)
             (CONT)........................................    504
    115-023  RUDDER/SPEEDBRAKE SECONDARY DELTA PRESSURE
             ANOMALY (GNC-27)..............................    505
    115-024  RUDDER/SPEEDBRAKE SECONDARY DELTA PRESSURE
             ANOMALY (GNC-27) (CON'T)......................    506
    115-025  RUDDER AEROSURFACE PROFILE ANOMALY (GNC-28)..     507
    115-026  SPEEDBRAKE AEROSURFACE PROFILE ANOMALY
             (GNC-28)......................................    508
    115-027  ORBITER ASA POWER ANOMALY (GNC-32)............    509
    115-028  FCS CHANNEL FAILURE (GNC-38)..................    511
    115-029  AERO SURFACE MSID REF (GNC-38)................    513
    115-030  MPS TVC MSID REF (GNC-38)....................     514
    115-031  ORBITER ATVC POWER ANOMALY (GNC-39)..........     515
    115-032  MPS TVC ACTUATOR POSITION ANOMALY (GNC-40)....    516
    115-033  MPS TVC SECONDARY DELTA PRESSURE ANOMALY
             (GNC-41)......................................    517
    115-034  MPS TVC SECONDARY DELTA PRESSURE ANOMALY
             (GNC-41) (CON'T)..............................    518
    115-035  OMS GIMBAL PROFILE ANOMALY (GNC-44)..........     519
    115-036  TABLE GNC-44..................................    520
    115-037  RCS JET CHAMBER PRESSURE INDICATION ANOMALY
             (GNC-45, RCS-08)..............................    521
    115-038  RCS JET CHAMBER PRESSURE INDICATION ANOMALY
             (GNC-45, RCS-08) (CONT'D)....................     523
    115-039  RCS JET CHAMBER PRESSURE INDICATION ANOMALY
             (GNC-45, RCS-08) (CONT'D)....................     524
    115-040  RCS JET CHAMBER PRESSURE INDICATION ANOMALY
             (GNC-45, RCS-08) (CONT'D)....................     525
    115-041  RCS VERNIER DRIVER OUT FAILURE (GNC-46)......     526
    115-042  MSID TABLE (GNC-46)..........................     527
    115-043  RCS VERNIER LOGIC RPC FAILURE (GNC-47)........    528
    115-044  MSID TABLE GNC-47............................     529
    115-045  RCS DRIVER POWER FAILURE (GNC-48)............     530
    115-046  RJD TRICKLE CURRENT ANOMALY (GNC-49)..........    534
    115-047  RJD TRICKLE CURRENT ANOMALY (GNC-49) CONT....     535
    115-048  IMU HARDWARE BITE ANOMALY (GNC-56)............    536
    115-049  ORBITER IMU POWER ANOMALY (GNC-57)............    537
    115-050  IMU TEMPERATURE READY ANOMALY (GNC-58)........    538
    115-051  IMU OVER TEMPERATURE INDICATOR (GNC-59)......     539
    115-052  IMU SOFTWARE BITE ANOMALY (GNC-61)............    540
 
 
 
 
 
 
 
 
 
VOLUME 5 OF 5                                        OMI NO. - S0007VL5
DATE: 07-01-99                                       REV.    - Z-1
 
    115-053  IMU GYROCOMPASS ANOMALY (GNC-62)..............    541
    115-054  IMU GYROCOMPASS 1 ALIGNMENT ANOMALY (GNC-63)..    542
    115-055  IMU REQUIREMENTS WHEN IRAMS IN USE (GNC-64)..     543
    115-056  IMU TRANSMISSION WORD FAILURE (GNC-66)........    544
    115-057  IMU PRESSURE/COMMUNICATION ANOMALY (GNC-67)..     545
    115-058  BRAKE PRESSURE ANOMALY (GNC-79)..............     546
    115-059  BRAKE POWER ANOMALY (GNC-80)..................    547
    115-060  PROCEDURE FOR LOSS OF MEASUREMENT: V76X5800E1
             BRAKE/SKID SUB BUS C/A RPC PWR A..............    547
    115-061  PROCEDURE FOR LOSS OF MEASUREMENT: V76X5805E1
             BRAKE/SKID SUB BUS B/C RPC PWR B..............    548
    115-062  PROCEDURE FOR LOSS OF MEASUREMENT: V76X5806E1
             BRAKE/SKID SUB BUS B/C RPC PWR C..............    549
    115-063  PROCEDURE FOR LOSS OF MEASUREMENT: V76X5811E1
             BRAKE/SKID SUB BUS C/A RPC PWR C..............    550
    115-064  LANDING GEAR ANTI-SKID ANOMALY (GNC-81)......     551
    115-065  ANTI-SKID FAIL LIGHT ANOMALY (GNC-82)........     552
    115-066  NOSEWHEEL ANOMALY (GNC-83)....................    553
    115-067  NOSEWHEEL ANOMALY (GNC-83) CONT'D............     554
    115-068  NOSEWHEEL ANOMALY (GNC-83) CONT'D............     555
    115-069  NOSEWHEEL ANOMALY (GNC-83) CONT'D............     556
    115-070  NOSE WHEEL POSITION SIGNAL PATH ANOMALY
             (GNC-84)......................................    557
    116-000  MECHANISMS....................................    559
    116-001  ET UMBL DR CENTERLINE LATCH LOCKED INDICATION
             FAILED OFF S/B ON............................     559
    116-046  ET UMBL DR CENTERLINE LATCH STOW INDICATION
             FAILED ON S/B OFF............................     574
    116-075  ET UMBILICAL DOOR CLOSE INDICATION FAILED ON
             S/B OFF......................................     585
    116-087  ET UMBILICAL DOOR OPEN INDICATION FAILED OFF
             S/B ON........................................    590
    116-101  ET UMBL DR LATCH - LATCH INDICATION FAILED ON
             S/B OFF......................................     595
    116-119  ET UMBILICAL DR LATCH - RELEASES INDICATION
             FAILED OFF S/B ON............................     602
    116-133  RADIATOR DEPLOY INDICATION FAILED ON S/B OFF..    608
    116-140  RADIATOR STOW INDICATION FAILED OFF S/B ON....    613
    116-150  RADIATOR LATCHES - LATCH INDICATION FAILED OFF
             S/B ON........................................    618
    116-172  RADIATOR LATCHES RELEASE INDICATION FAILED ON
             S/B OFF......................................     628
    116-179  PAYLOAD BAY DOOR OPEN INDICATION FAILED ON S/B
             OFF..........................................     631
    116-199  PLB DR BKHD LCH "LATCH" INDICATION FAILED OFF
             S/B ON........................................    638
    116-224  PLB DR RT FWD BKHD LCH MOTOR 1 CHECK AC - ON..    646
    116-230  PLB DR RT FWD BKHD LCH MOTOR 2 CHECK WITH AC -
             ON............................................    647
 
 
 
 
 
 
 
 
VOLUME 5 OF 5                                        OMI NO. - S0007VL5
DATE: 07-01-99                                       REV.    - Z-1
 
    116-252  PLB DR BKHD LCH "RELEASE" INDICATION FAILED ON
             S/B OFF......................................     652
    116-284  PLBD READY TO LATCH INDICATION FAILED OFF S/B
             ON............................................    663
    116-285  PLB DR CENTERLINE LCH "LATCH" INDICATION
             FAILED OFF S/B ON............................     663
    116-290  PLB DR C/L LCH 1-4 MOTOR 1 CHECK AC - ON......    667
    116-337  PLB DR CENTER LINE LCH "RELEASE" INDICATION
             FAILED ON S/B OFF............................     678
    116-369  LANDING GEAR/DOOR UPLOCK INDICATION FAILED OFF
             S/B ON........................................    689
    116-374  LANDING SHUTTLE VALVE INDICATION FAILED OFF
             S/B ON (SSID: AFM-11)........................     692
    116-394  PRMS SHOULDER STOW INDICATION FAILED OFF S/B
             ON............................................    700
    116-405  PORT RMS SHLD DEPLOY INDICATION FAILED ON S/B
             OFF..........................................     706
    116-412  PORT RMS RETN LCH "RELEASE" INDICATION FAILED
             ON S/B OFF....................................    709
    116-419  PRMS LCH "LATCH" INDICATION FAILED OFF S/B ON     712
    116-434  STAR TRACKER DOOR CLOSE INDICATION FAILED OFF
             S/B ON........................................    718
    116-448  STAR TRACKER DOOR OPEN INDICATION FAILED ON
             S/B OFF......................................     722
    116-459  ADP DOOR "STOW" INDICATION FAILED OFF S/B ON..    725
    116-474  ADP DOOR "DEPLOY" INDICATION FAILED ON S/B OFF    730
    116-498  FORWARD MOTOR CONTROL ASSEMBLY................    736
    116-505  CONCLUSION/RECOMMENDATION....................     738
    116-506  MID MOTOR CONTROL ASSEMBLY OPERATIONAL STATUS
             ANOMALY (AFM-17)..............................    739
    116-518  CONCLUSION/RECOMMENDATION....................     744
    116-519  AFT MOTOR CONTROL ASSEMBLY OPERATIONAL STATUS
             ANOMALY (AFM-18)..............................    745
    116-526  CONCLUSION/RECOMMENDATION....................     747
    116-527  HATCH LEAK CHECK FAILURE (CONTINGENCY)........    763
    116-579  LIMIT SWITCH VERIFICATION FAILURE
             (CONTINGENCY)................................     783
    116-656  HATCH ACTUATOR LOCKING LEVER OVERCENTER
             VERIFICATION FAILURE..........................    809
    116-675  HATCH ACTUATOR LOCKING LEVER OVERCENTER
             VERIFICATION FAILURE..........................    814
    116-689  HATCH PAWL FAILURE (CONTINGENCY)..............    818
    116-700  I/E HATCH HANDLE REMOVAL (CONTINGENCY)........    821
    116-706  I/E HATCH CARRIER PANEL (CONTINGENCY)-3......     823
    117-000  LAUNCH POLYNOMIAL UPDATE OPTION..............     837
    117-001  G1 LAUNCH POLYNOMIAL UPDATE OPTION............    837
 
 
 
 
 
 
 
 
 
 
 
VOLUME 5 OF 5                                        OMI NO. - S0007VL5
DATE: 07-01-99                                       REV.    - Z-1
 
    118-000  PAYLOAD RETENTION LATCHES....................     849
    118-039  TABLE 1 - MID MCA OP STATUS..................     867
    119-000  RANGE SAFETY AND SRB SECURING (POST G9
             TRANSITION)..................................     927
    120-000  INTEGRATED....................................    929
    120-001  CONTINGENCY/RED CREW DEVELOPMENT AND
             IMPLEMENTATION PROCESS........................    929
    120-002  POST CRYOGENIC LOADING PAD ACCESS............     930
    120-033  CONTINGENCY CREW ENTRY AFTER ECS CONFIGURED TO
             GN2 FLOW MODE................................     941
    120-062  MLP RE-ENTRY DURING POST LAUNCH SECURING......    952
    120-065  SECURE GN2 SUPPLY TO MLP......................    954
    121-000  LPS..........................................     963
    121-001  C1 CONSOLE RECOVERY PROCEDURE................     964
    121-019  C2 CONSOLE RECOVERY PROCEDURE................     968
    121-040  C3 CONSOLE RECOVERY PROCEDURE................     973
    121-063  C4 CONSOLE RECOVERY PROCEDURE................     980
    121-088  C5 CONSOLE RECOVERY PROCEDURE................     989
    121-108  C6 CONSOLE RECOVERY PROCEDURE................     993
    121-131  C7 CONSOLE RECOVERY PROCEDURE................     999
    121-149  C8 CONSOLE RECOVERY PROCEDURE................    1003
    121-167  C9 CONSOLE RECOVERY PROCEDURE................    1007
    121-181  C10 CONSOLE RECOVERY PROCEDURE................   1012
    121-197  C11 CONSOLE RECOVERY PROCEDURE................   1018
    121-198  C11 CONSOLE RECOVERY PROCEDURE................   1019
    121-225  C12 CONSOLE CRASH FLOWCHART (FIG 121-002) |..    1031
    121-226  C12 CONSOLE CRASH RECOVERY PROCEDURE..........   1032
    121-291  MSTR CONSOLE RECOVERY PROCEDURE..............    1047
    121-315  INTG CONSOLE RECOVERY PROCEDURE..............    1061
    121-335  INTEGRATION CRASH RECOVERY (T-0600/00 THRU
             T-0200/00)....................................   1066
    121-336  INTEGRATION CRASH RECOVERY (T-0200/00 THRU
             T-0045/00)....................................   1067
    121-337  INTEGRATION CRASH RECOVERY (T-0045/00 THRU
             T-0005/00)....................................   1068
    121-338  INTEGRATION CRASH RECOVERY (T-0230/00 THRU
             T-0009/00)....................................   1072
    121-347  INTEGRATION OR BACKUP CONSOLE CRASH RECOVERY
             (T-0200/00 THRU T-0005/00)....................   1074
    121-355  BKUP CONSOLE RECOVERY PROCEDURE..............    1076
    121-369  BACKUP CRASH RECOVERY (T-0200/00 THRU
             T-0005/00)....................................   1080
    121-370  GPCA FEP RECOVERY PROCEDURE..................    1083
    121-384  GPCS FEP RECOVERY PROCEDURE..................    1085
    121-396  OIA FEP RECOVERY PROCEDURE....................   1087
    121-410  OIS FEP RECOVERY PROCEDURE....................   1089
    121-422  LDB FEP RECOVERY PROCEDURE....................   1091
    121-434  LDB TRANSMISSION SYSTEM RECOVERY PROCEDURE....   1093
 
 
 
 
 
 
 
 
 
VOLUME 5 OF 5                                        OMI NO. - S0007VL5
DATE: 07-01-99                                       REV.    - Z-1
 
    121-444  LDB TRANSMISSION SYSTEM RECOVERY PROCEDURE
             (LCC LPS 4-17)................................   1095
    121-445  GS___ FEP RECOVERY PROCEDURE..................   1096
    121-456  GOAL/SYSTEM SOFTWARE RECOVERY FOR TOTAL FEP
             LOSS..........................................   1098
    121-468  PDR RECOVERY PROCEDURE........................   1102
    121-471  RF DATA LOSS RECOVERY PROCEDURE..............    1103
    121-475  HARDLINE DATA LOSS RECOVERY PROCEDURE........    1104
    121-480  RF DATA INTERRUPTION RECOVERY PROCEDURE......    1105
    121-490  HL DATA INTERRUPTION RECOVERY PROCEDURE......    1107
    122-000  HIM LOSS AFTER T-8 HOURS......................   1109
    123-000  SRSS VEHICLE AGC LEVEL VERIFICATION (MULTIPATH
             INTERFERENCE)................................    1187
    124-000  GLS..........................................    1193
    124-006  GLS REAL TIME MASK/RESET AND CONTINGENCY
             LAUNCH SEQUENCE COMMANDS......................   1194
    125-000  LCC WORKAROUND FOR FIREX LOOP AND TANK T-3
             PRESSURE ANOMALY - LCC EGR-03................    1215
    125-008  WORKAROUND FOR FIREX PUMP FAILURE - T-09
             MINUTES TO T-31 SECONDS......................    1218
    125-011  WORKAROUND FOR FIREX PUMP FAILURE - T-09
             MINUTES TO T-31 SECONDS......................    1219
    126-000  CRIM VISUAL ALARM RESET WORKSTEPS............    1225
    127-000  STL BLOWN FUSE REPLACEMENT....................   1229
    128-000  LOSS OF FACILITY AIR COMPRESSOR..............    1231
    129-000  ROEU HOOK ANOMALY (SSID ROEU-01)..............   1233
    130-000  ROEU RELAX ANOMALY (SSID: ROEU-02)............   1265
    131-000  ROEU STOW ANOMALY (SSID: ROEU-03)............    1281
 
SECTION V - POST OPERATION INSTRUCTIONS                         NA
 
 
APPENDICES
 
    A THRU Y ..............................................     NA
 
    Z        EMERGENCY INSTRUCTIONS .......................   1297
 
    132-000  EMERGENCY INSTRUCTIONS - INTEGRATED..........    1297
    132-001  LOSS OF ORBITER GROUND COOLING................   1297
    132-002  INITIAL CONFIG FOR LOSS OF GROUND COOLING
             CONTROL SEQ..................................    1299
    132-024  SYSTEMS DEACTIVATION FOR LOSS OF GROUND
             COOLING CONTROL SEQ..........................    1306
    132-038  SYSTEMS DEACTIVATION FOR LOSS OF GROUND
             COOLING CONTROL SEQ..........................    1309
    132-122  TOTAL LOSS OF COOLING EXPEDITED POWER DOWN....   1330
 
 
 
 
 
 
 
 
 
 
VOLUME 5 OF 5                                        OMI NO. - S0007VL5
DATE: 07-01-99                                       REV.    - Z-1
 
    132-140  FLIGHT AND GROUND CREW EMERGENCY EGRESS/ESCAPE   1334
    132-158  RCS/OMS HELIUM REGULATOR LEAKAGE/FAILURE......   1341
    133-000  EMERGENCY INSTRUCTIONS - TEST SUPPORT........    1343
    133-001  EMERGENCY FIREX WATER FLOW....................   1343
    133-004  GO2/GH2 EMERGENCY SHUTDOWN....................   1348
    133-011  LOSS OF AIR LIQUIDE GN2 SUPPLY (HPGN2 AND
             LPGN2) DURING EXTERNAL TANK LOADING/DRAINING..   1349
    133-027  FIRE ANNUNCIATIONS............................   1358
    134-000  EMERGENCY INSTRUCTIONS - ORBITER..............   1417
    134-001  EMERGENCY SHUTDOWN - ORBITER - ELECTRICAL
             POWER SYSTEM..................................   1417
    134-002  EMERG ORBITER POWER DOWN - LPS................   1417
    134-018  EMERGENCY MLP AND PAD P/S POWER DOWN - MANUAL
             - MLP/PAD....................................    1421
    134-026  ORBITER EMERGENCY POWER DOWN - SAFING PANEL..    1424
    134-036  CONFIGURE PAYLOAD PRIMARY TO MAIN B..........    1426
    134-049  RECONFIGURE PAYLOAD PRIMARY TO MAIN C........    1429
    134-063  FUEL CELL EMERGENCY PWR DOWN (MANUAL)........    1432
    134-105  FUEL CELL EMERGENCY PWR DOWN (REMOTE)........    1444
    134-174  POSSIBLE FIRE IN AV BAYS 1,2 OR 3A............   1460
    134-182  PREDETERMINED FIRE INDICATION IN CREW MODULE..   1463
    134-188  FREON COOLANT LOOP UNDERTEMP EMERGENCY
             PROCEDURE....................................    1467
    135-000  EMERGENCY INSTRUCTIONS - MPS/LOX..............   1471
    135-001  INADVERTENT OPENING OF A86462 TSM DRAIN VALVE
             DURING LOADING (OXYGEN 65)....................   1471
    135-004  PV10 INBD LOX F/D VALVE OR PV9 OUTBD LOX F/D
             VALVE AND PV19 LOX OVERBOARD BLEED VALVE
             FAILED CLOSED (OXYGEN 66)....................    1472
    135-008  LOSS OF BLEED FLOW FROM VEHICLE WITH NO LOSS
             OF DRAIN CAPABILITY (OXYGEN 67)..............    1473
    135-014  MAJOR OXYGEN LEAK (10,000 PPM OR GREATER) IN
             THE ORBITER AFT FUSELAGE (OXYGEN 68)..........   1475
    135-032  INADVERTENT ET GUCP SEPARATION (OXYGEN 69)....   1480
    135-035  MAJOR LEAK/FIRE IN LOX STORAGE TANK
             PRESSURIZATION LINES (OXYGEN 70)..............   1481
    135-038  MAJOR LEAK/FIRE BETWEEN A141 AND A126 OR A126
             LOCKUP/OUT OF CONTROL (OXYGEN 71)............    1481
    135-041  MAJOR LEAK/FIRE BETWEEN A98 AND A127 OR A127
             LOCKUP/OUT OF CONTROL (OXYGEN 72)............    1482
    135-044  MAJOR LEAK/FIRE IN LOX STORAGE AREA (OXYGEN
             73)..........................................    1482
    135-047  MAJOR LEAK/FIRE BETWEEN MLP VALVE SKID AND
             VEHICLE (OXYGEN 74)..........................    1482
    135-050  INADVERTENT LO2 T-0 CARRIER PLATE SEPARATION
             (OXYGEN 75)..................................    1483
    135-057  HARDWIRE SYSTEM SAFING (OXYGEN 76)............   1484
 
 
 
 
 
 
 
 
 
 
VOLUME 5 OF 5                                        OMI NO. - S0007VL5
DATE: 07-01-99                                       REV.    - Z-1
 
    135-060  EMERGENCY PWR SHUTDOWN (LOX FACILITY) LPS
             (OXYGEN 77)..................................    1484
    135-066  INITIATION/SAFING OF ORBITER PAD WATER SPRAY
             SYSTEM - LPS (OXYGEN 79)......................   1488
    135-071  LO2 ET VENT AREA FIRE DURING LOADING (OXYGEN
             80)..........................................    1491
    135-073  DRAIN WITH LOX ET VENT AND RELIEF VALVE FAILED
             OPEN (OXYGEN 81)..............................   1491
    135-075  EXCESSIVE GASEOUS OXYGEN CONCENTRATION IN ET
             INTERTANK (LCC PAGE HAZ-07) (OXYGEN 82)......    1492
    135-090  ABRUPT TOTAL LOSS OF ORBITER POWER (OXYGEN 83)   1496
    135-095  IMMINENT TOTAL LOSS OF ORBITER POWER (OXYGEN
             84)..........................................    1499
    135-105  GRADUAL LOSS OF GN2 OR GHE (OXYGEN 86)........   1502
    135-107  TOTAL LOSS OF GN2 (ANY AREA) (OXYGEN 87)......   1502
    135-109  TOTAL LOSS OF GHE IN ANY AREA (OXYGEN 88)....    1502
    135-112  LOSS OF POWER - MLP ONLY (OXYGEN 89)..........   1502
    135-114  LOSS OF GSE POWER - STORAGE AREA AND/OR PTCR
             (OXYGEN 90)..................................    1503
    135-116  LARGE ACREAGE LOSS OF LOX ET TPS (OXYGEN 91)..   1503
    135-118  LOSS OF HELIUM INJECT (OXYGEN 92)............    1503
    135-120  GO2 VENT HOOD EMERGENCY/CONTINGENCY LIFT/
             LOWER (OXYGEN 94)............................    1503
    135-125  SSME OPOV OR MOV LEAKAGE (OXYGEN 95)..........   1504
    135-130  LOSS OF GPC/OI LINES (OXYGEN 98)..............   1504
    136-000  EMERGENCY INSTRUCTIONS - MPS/LH2..............   1505
    136-001  LEAK INDICATION IN LH2 TSM (LH2 106)..........   1505
    136-004  LEAK INDICATION ON T-0 UMBILICAL (LH2 107)....   1505
    136-007  LEAK ON LH2 ET VENT UMBILICAL QD (LH2 108)....   1506
    136-011  MAJOR HYDROGEN (10,000 PPM OR GREATER) LEAK IN
             THE ORBITER AFT FUSELAGE (HYDROGEN 109)......    1507
    136-024  SSME LEAKAGE, MFV LEAKAGE AND HPFTP LIFT OFF
             SEAL LEAKAGE (LH2 110)........................   1510
    136-027  MAJOR LEAK/FIRE INDICATION AT ORBITER/ET LH2
             DISCONNECT (FD44, FD45, LD54, LD55) (LH2 111)    1511
    136-037  MAJOR LEAK/FIRE IN TANK PRESSURIZATION LINES
             BETWEEN VAPORIZER INLETS AND A3338
             (PRE-CONDITION VENT) VLV (LH2 112)............   1514
    136-040  MAJOR LEAK/FIRE BETWEEN A3301 (XFER LINE) VLV
             OR A3309 (XFER LINE CHILLDOWN) VLV AND MLP VLV
             SKID (LH2 113)................................   1515
    136-043  MAJOR LEAK/FIRE BETWEEN MLP VLV SKID AND T-0
             UMBILICAL DISCONNECT (LH2 114)................   1516
    136-046  MAJOR LEAK/FIRE IN MLP/FACILITY VENT (LH2 115)   1516
    136-049  MAJOR LEAK/FIRE IN LH2 ET VENT SYSTEM (LH2
             116)..........................................   1517
    136-052  INADVERTENT TSM T-0 LH2 CARRIER PLATE
             SEPARATION (LH2 117)..........................   1518
    136-055  INADVERTENT I/T UMBILICAL RELEASE (LH2 118)..    1519
 
 
 
 
 
 
 
 
VOLUME 5 OF 5                                        OMI NO. - S0007VL5
DATE: 07-01-99                                       REV.    - Z-1
 
    136-058  HARDWIRE SYSTEM SAFING (LH2 119)..............   1519
    136-061  MPS HARDWIRE DRAIN (LH2 120)..................   1520
    136-066  ET VENT VALVE FAILURE (VALVE FAILED OPEN) (LH2
             121)..........................................   1521
    136-068  ET VENT VALVE FAILED CLOSED DURING FILL (VENT
             VALVE CYCLING ACTIVE) (LH2 123)..............    1521
    136-070  LOSS OF FEP GS1A (LH2 124)....................   1521
    136-072  LOSS OF FEP GS2A (LH2 125)....................   1522
    136-074  LOSS OF OI LINK (LH2 126)....................    1522
    136-076  LOSS OF GPC (LH2 127)........................    1522
    136-078  LOSS OF CRITICAL PURGES (LH2 128)............    1523
    136-080  EXCESSIVE GASEOUS OXYGEN OR HYDROGEN
             CONCENTRATION IN ET/IT (LH2 129)..............   1524
    136-084  IMMINENT TOTAL LOSS OF ORBITER POWER (LH2130)    1525
    136-092  GRADUAL LOSS OF GN2 OR GHE (ANY AREA) (LH2
             131)..........................................   1527
    136-094  TOTAL LOSS OF STORAGE AREA GN2 (LH2 132)......   1528
    136-096  TOTAL LOSS OF FSS GN2 (LH2 133)..............    1528
    136-098  TOTAL LOSS OF MLP GN2 (LH2 134)..............    1528
    136-100  TOTAL LOSS OF GN2 (ALL AREAS) (LH2 135)......    1528
    136-102  TOTAL LOSS OF FSS GHE (LH2 136)..............    1528
    136-104  TOTAL LOSS OF MLP GHE (LH2 137)..............    1528
    136-106  TOTAL LOSS OF GHE (ALL AREAS) (LH2 138)......    1529
    136-108  LOSS OF STORAGE AREA POWER (LH2 139)..........   1529
    136-110  LOSS OF FSS POWER (LH2 140)..................    1529
    136-112  LOSS OF MLP POWER (LH2 141)..................    1529
    136-114  LOSS OF ALL POWER (GSE) (LH2 142)............    1529
    137-000  EMERGENCY INSTRUCTIONS - SRB..................   1531
    137-001  INSTRUCTION 1 - IGNITION S&A DEVICE MANUAL
             SAFING........................................   1531
    137-008  INSTRUCTION 2 - POWER OFF....................    1535
    137-019  INSTRUCTION 3 - SRSS S&A DEVICE MANUAL SAFING    1537
    137-023  INSTRUCTION 4 - LEAK N2H4, SRB AFT SKIRT,
             SUSPECTED OR CONFIRMED........................   1539
    138-000  EMERGENCY INSTRUCTIONS - LOSS OF FIRING ROOM
             CONTROL/VISIBILITY............................   1541
    138-001  OPTION A - T-6 HOURS TO T-4 MINUTES..........    1541
    138-026  OPTION B - T-4 MINUTES TO T-31 SECONDS........   1546
    138-057  OPTION C - T-31 SECONDS THRU SSME START......    1552
    139-000  EMERGENCY INSTRUCTIONS - PAYLOADS............    1563
    139-001  INSTRUCTION 1 - IUS EMERGENCY POWER DOWN......   1563
    140-000  P/L POWER DE-ACTIVATION......................    1565
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
VOLUME 5 OF 5                                        OMI NO. - S0007VL5
DATE: 07-01-99                                       REV.    - Z-1
 
                        OPERATION INSTRUCTIONS
 
  SEQ       TIME    CMD  RESP            DESCRIPTION            VERIF.
-------- ---------- ---- ---- --------------------------------- --------
 
                                             NOTE                     -1|
 
                                   DELETED                              |
 
105-031                       DELETED                                 -1|
 
105-032                       DELETED                                 -1|
 
105-033                       DELETED                                   |
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
                                                                     151
 
VOLUME 5 OF 5                                        OMI NO. - S0007VL5
DATE: 07-01-99                                       REV.    - Z-1
 
                        OPERATION INSTRUCTIONS
 
  SEQ       TIME    CMD  RESP            DESCRIPTION            VERIF.
-------- ---------- ---- ---- --------------------------------- --------
 
105-034                       DELETED                                 -1|
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
152
 
VOLUME 5 OF 5                                        OMI NO. - S0007VL5
DATE: 07-01-99                                       REV.    - Z-1
 
                        OPERATION INSTRUCTIONS
 
  SEQ       TIME    CMD  RESP            DESCRIPTION            VERIF.
-------- ---------- ---- ---- --------------------------------- --------
 
106-008                       PROBLEM: H2 TANK PRESS OR HTR           -1|
CON'T                         -----------------------------
                              CNTL PRESS HIGH (SSID PRSD-06) (CONT)
                              ------------------------------
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
                                                                     173
 
VOLUME 5 OF 5                                        OMI NO. - S0007VL5
DATE: 07-01-99                                       REV.    - Z-1
 
                        OPERATION INSTRUCTIONS
 
  SEQ       TIME    CMD  RESP            DESCRIPTION            VERIF.
-------- ---------- ---- ---- --------------------------------- --------
 
106-009                       PROBLEM: O2 TANK QUANTITY LOW, H2
                              ---------------------------------
                              TANK QUANTITY LOW (SSID PRSD-07/08)
                              -----------------------------------
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
174
 
VOLUME 5 OF 5                                        OMI NO. - S0007VL5
DATE: 07-01-99                                       REV.    - Z-1
 
                        OPERATION INSTRUCTIONS
 
  SEQ       TIME    CMD  RESP            DESCRIPTION            VERIF.
-------- ---------- ---- ---- --------------------------------- --------
 
106-039                       PROBLEM: RLF NOZZLE TEMP HIGH           -1|
                              -----------------------------
                              OR LOW (A OR B) (SSID FCP-06)             |
                              -----------------------------
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
                                                                     191
 
VOLUME 5 OF 5                                        OMI NO. - S0007VL5
DATE: 07-01-99                                       REV.    - Z-1
 
                        OPERATION INSTRUCTIONS
 
  SEQ       TIME    CMD  RESP            DESCRIPTION            VERIF.
-------- ---------- ---- ---- --------------------------------- --------
 
106-040                       PROBLEM: RLF VLV TEMPS, RLF LINE
                              --------------------------------
                              TEMPS, ALT LINE TEMPS LOW
                              -------------------------
                              (SSID FCP-06)
                              -------------
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
192
 
VOLUME 5 OF 5                                        OMI NO. - S0007VL5
DATE: 07-01-99                                       REV.    - Z-1
 
                        OPERATION INSTRUCTIONS
 
  SEQ       TIME    CMD  RESP            DESCRIPTION            VERIF.
-------- ---------- ---- ---- --------------------------------- --------
 
                                             NOTE                     -1|
 
                                   APU-20 PERFORM THE NEXT STEP
                                   TO EVALUATE A POSSIBLE LEAK          |
                                   IN THE INJECTOR H2O COOLING
                                   TANK.
 
108-055                  CAPU VWF57
 
                              1.   RECORD INJECTOR H2O TANK PRESS
                                   ______PSIA   BD            V46P0504A1
 
                              2.   RECORD INJECTOR H2O TANK TEMP
                                   ______ DEG F V46T0500A1
 
                              3.   RECORD INJECTOR H2O LINE TEMP 1
                                   ______ DEG F V46T0501A1
 
                              4.   RECORD INJECTOR H2O LINE TEMP 2
                                   ______ DEG F V46T0502A1
 
                              5.   RECORD INJECTOR H2O LINE TEMP 3
                                   ______ DEG F V46T0503A1
 
                              6.   USING DATA RETRIEVAL, PLOT THE
                                   ABOVE PARAMETERS AND DETERMINE
                                   IF THE NOTED CHANGE IN PRESSURE
                                   CAN BE ATTRIBUTED TO A CHANGE
                                   IN TEMPERATURE, OR IF THERE
                                   EXISTS A SATISFACTORY EXPLANATION
                                   FOR THE PRESSURE CHANGE.
 
                                                NOT PERFORMED     ______
 
108-056                  CAPU IF PERFORMED, EVALUATE THE RESULTS
                              OF THE ABOVE TWO STEPS OF TROUBLE
                              SHOOTING AND MAKE A RECOMMENDATION
                              TO THE OTC AND NTD BASED ON LCC
                              PAGE APU-20 INJECTOR COOLING
                              SYSTEM PRESSURE ANOMALY.
 
                                                NOT PERFORMED     ______
 
 
 
 
 
 
 
 
                                                                     243
 
VOLUME 5 OF 5                                        OMI NO. - S0007VL5
DATE: 07-01-99                                       REV.    - Z-1
 
                        OPERATION INSTRUCTIONS
 
  SEQ       TIME    CMD  RESP            DESCRIPTION            VERIF.
-------- ---------- ---- ---- --------------------------------- --------
 
                              APU FUEL TANK ISOLATION VALVE           -1|
                              -----------------------------             |
                              ANOMALY APU-23                            |
                              --------------                            |
                                                                        |
                                             NOTE                       |
                                                                        |
                                   PERFORM THE NEXT FOUR STEPS          |
                                   AS REQUIRED TO TROUBLESHOOT A        |
                                   FUEL ISOLATION VALVE POWER           |
                                   INDICATOR FAILURE TO INDICATE        |
                                   ON FOLLOWNG PRE-START.  IF THE       |
                                   POWER INDICATOR CAN NOT BE USED      |
                                   DUE TO A FAILURE, FUEL ISO VLV       |
                                   TEMP MAY BE USED TO VERIFY           |
                                   THAT THE ISOLATION VALVE COIL        |
                                   IS ENERGENIZED.  FUEL ISO VLV        |
                                   TEMP WILL INCREASE APPROXIMATELY     |
                                   1 DEGREE FOR EVERY MINUTE IT         |
                                   IS OPEN WITH NO FUEL FLOW.           |
                                                                        |
108-056A            CAPU      CRT VWF57                               -1|
                              1.   RECORD WHICH APU HAS AN              |
                                   ANOMALOUS CONDITION.                 |
                                                                        |
                                   APU _____                            |
                                                                        |
                              2.   RECORD FUEL ISLN VLV A               |
                                   PWR __________ V46X0X15E1.           |
                                                                        |
                              3.   RECORD FUEL ISLN VLV B               |
                                   PWR __________ V46X0X34E1.           |
                                                                        |
                              4.   RECORD FUEL ISO VLV A TEMP 1         |
                                   __________ DEG F V46T1X75A1.         |
                                                                        |
                              5.   RECORD FUEL ISO VLV A TEMP 2         |
                                   __________ DEG F V46T1X76A1.         |
                                                                        |
                              6.   RECORD FUEL ISO VLV B TEMP 1         |
                                   __________ DEG F V46T1X73A1.         |
                                                                        |
                              7.   RECORD FUEL ISO VLV B TEMP 2         |
                                   __________ DEG F V46T1X73A1.         |
                                                                        |
 
 
 
 
 
243.1
 
VOLUME 5 OF 5                                        OMI NO. - S0007VL5
DATE: 07-01-99                                       REV.    - Z-1
 
                        OPERATION INSTRUCTIONS
 
  SEQ       TIME    CMD  RESP            DESCRIPTION            VERIF.
-------- ---------- ---- ---- --------------------------------- --------
 
108-056B            PLT       PANEL R2                                -1|
                              APU/HYD                                   |
                                APU FU TK VLV ENA                       |
                                  _____ CB - CYCLE OPEN (OFF)/          |
                                                   CLOSED (ON)          |
                                APU FUEL TK VLV                         |
                                  _____ SW - CYCLE CLOSED/OPEN          |
                                                NOT PERFORMED     ______|
                                                                        |
108-056C            CAPU      CRT VWF57                               -1|
                              1.   RECORD WHICH APU HAS AN              |
                                   ANOMALOUS CONDITION.                 |
                                                                        |
                                   APU _____                            |
                                                                        |
                              2.   RECORD FUEL ISLN VLV A               |
                                   PWR __________ V46X0X15E1.           |
                                                                        |
                              3.   RECORD FUEL ISLN VLV B               |
                                   PWR __________ V46X0X34E1.           |
                                                                        |
                              4.   RECORD FUEL ISO VLV A TEMP 1         |
                                   __________ DEG F V46T1X75A1.         |
                                                                        |
                              5.   RECORD FUEL ISO VLV A TEMP 2         |
                                   __________ DEG F V46T1X76A1.         |
                                                                        |
                              6.   RECORD FUEL ISO VLV B TEMP 1         |
                                   __________ DEG F V46T1X73A1.         |
                                                                        |
                              7.   RECORD FUEL ISO VLV B TEMP 2         |
                                   __________ DEG F V46T1X73A1.         |
                                                                        |
108-056D            CAPU      IF PERFORMED, EVALUATE THE RESULTS      -1|
                              OF THE PREVIOUS THREE STEPS OF            |
                              THE TROUBLESHOOTING AND MAKE A            |
                              RECOMMENDATION TO THE OTC AND NTD         |
                              BASED ON LCC PAGE APU-23, APU FUEL        |
                              TANK ISOLATION VALVE ANOMALY.             |
                                                                        |
                                                NOT PERFORMED     ______|
 
 
 
 
 
 
 
 
 
                                                                   243.2
 
VOLUME 5 OF 5                                        OMI NO. - S0007VL5
DATE: 07-01-99                                       REV.    - Z-1
 
                        OPERATION INSTRUCTIONS
 
  SEQ       TIME    CMD  RESP            DESCRIPTION            VERIF.
-------- ---------- ---- ---- --------------------------------- --------
 
                              PCA APU CONTROLLER RPC POWER ON
                              -------------------------------
                              ANOMALY APU-24
                              --------------
 
                                             NOTE
 
                                   APU-24 PERFORM THE NEXT TWO
                                   STEPS IF REQUIRED TO CONFIRM
                                   INSTRUMENTATION FAILURE OF
                                   V76X400XE1 PRIOR TO APU START.
                                   THE APU AUTO BIT TEST VERIFIES
                                   REDUNDANT POWER INTO THE
                                   CONTROLLER.
 
108-057                  CAPU VWF47
 
                              RECORD CONTROLLER PWR J1 RPC
                              ______  V76X400XE1 (X=1, 4 OR 8)
 
                              RECORD CONTROLLER PWR J2 RPC
                              ______  V76X400XE1 (X=2, 5 OR 7)
 
                              PFK10 KEY - PRESS
 
                              CRT
                              VERIFY GROUND COMMANDS ARE BEING
                              ISSUED FOR CORRECT APU
 
                              CURSOR CNTL
                              BITE INITIATE ON CMD
                              XMIT CURSOR KEY - PRESS  V46K0X57NL
 
                              WAIT 60 SECONDS
 
                              HIGH SPEED A ON CMD
                              XMIT CURSOR KEY - PRESS  V46K0X29NL
 
                              HIGH SPEED B ON CMD
                              XMIT CURSOR KEY - PRESS  V46KOX49NL
 
                              PFK11 KEY - PRESS
 
                              CRT
                              VERIFY BITE COMPLETE ON
 
                                                NOT PERFORMED     ______
 
 
 
244
 
VOLUME 5 OF 5                                        OMI NO. - S0007VL5
DATE: 07-01-99                                       REV.    - Z-1
 
                        OPERATION INSTRUCTIONS
 
  SEQ       TIME    CMD  RESP            DESCRIPTION            VERIF.
-------- ---------- ---- ---- --------------------------------- --------
 
111-003       3.    CDPS      REVIEW MCDS PROGRAM NOTES, ITEM 15,
CON'T                         (LOCATED AT END OF THIS SEQUENCE).
                              VERIFY ANOMALY DUE TO OCCURRENCE OF
                              A MCDS PROGRAM NOTE CONDITION.
 
                              RECORD NOTE NO.__________
 
                                             NOTE
 
                                   IF "CRT BITE" FSM IS NOT
                                   EXPLAINED BY PROGRAM NOTE,
                                   HOLD COUNT, AND DO NOT
                                   PERFORM REMAINDER OF THIS
                                   OPTION.
 
              4.    CDPS CDR  ___KYBD (FAILED DEU KYBD)
                              ITEM E
                              EXEC
                              ITEM A
                              EXEC
                                                NOT PERFORMED     ______
                                                                SS4
 
              5.    CDPS CDR  PANEL C2
 
                              ___CRT SEL SW - ___ (ASSIGN TO GOOD
                                                  CRT)
                                                NOT PERFORMED     ______
                                                                SS5
 
              6.    CDPS CDR  ___KYBD (GOOD KYBD)
                              GPC/CRT ___ ___ (REASSIGN FAILED CRT)
                              EXEC
                                                NOT PERFORMED     ______
                                                                SS6
 
                                    ENTIRE STEP NOT PERFORMED     ______
 
 
 
 
 
 
 
 
 
 
 
 
 
                                                                     259
 
VOLUME 5 OF 5                                        OMI NO. - S0007VL5
DATE: 07-01-99                                       REV.    - Z-1
 
                        OPERATION INSTRUCTIONS
 
  SEQ       TIME    CMD  RESP            DESCRIPTION            VERIF.
-------- ---------- ---- ---- --------------------------------- --------
 
                                             NOTE
 
                                   PERFORM NEXT STEP IF MCDS
                                   ANOMALY WAS PASS "I/O ERROR
                                   CRT" FAULT SUMMARY MESSAGE.
 
                                   "I/O ERROR CRT" FSM WITH NO
                                   I/O ERROR LOG ENTRIES
                                   INDICATES A CHECKSUM
                                   MISCOMPARE.
 
111-004                  CDPS RECORD NUMBER OF I/O ERROR LOG
                              ENTRIES ASSOCIATED WITH THIS I/O
                              ERROR CRT FAULT SUM MSG:__________
 
                                                NOT PERFORMED     ______
 
                                             NOTE                     -1|
 
                                   HOLD COUNT IF ANOMALY IS
                                   "I/O ERROR CRT" FSM AND TWO
                                   OR MORE UNEXPLAINED I/O
                                   ERRORS HAVE BEEN LOGGED
                                   AGAINST THIS MCDS DURING
                                   COUNTDOWN.                           |
                                                                        |
                                   IF HOLDING COUNT, DO NOT             |
                                   PERFORM THE REMAINDER OF             |
                                   THIS OPTION.                         |
 
111-005             CDPS CDR  CRT ___
 
                              VERIFY GOOD DISPLAY WITH NO ANOMALIES
                              OBSERVED (IE, NO BIG X, DISTORTED
                              CHARACTERS, ETC.).
                                                NOT PERFORMED     ______
 
                                             NOTE
 
                                   IN NEXT STEP, ASSIGN KYBD
                                   TO FAILED DEU.
 
111-006             CDPS CDR  PANEL C2
                              ___ CRT SEL SW - ___
 
                                                NOT PERFORMED     ______
 
 
 
 
260
 
VOLUME 5 OF 5                                        OMI NO. - S0007VL5
DATE: 07-01-99                                       REV.    - Z-1
 
                        OPERATION INSTRUCTIONS
 
  SEQ       TIME    CMD  RESP            DESCRIPTION            VERIF.
-------- ---------- ---- ---- --------------------------------- --------
 
                                             NOTE
 
                                   PERFORM NEXT OPTION IF BFS
                                   MCDS ANOMALY OCCURS.
 
                                   IF ANOMALY IS "I/O ERROR CRT"
                                   AND GPC LOGGED MULTIPLE I/O
                                   ERRORS AGAINST CRT, HOLD
                                   COUNT AND DO NOT PERFORM
                                   NEXT OPTION.
 
111-106                       9. BFS MCDS ANOMALY RECOVERY
                              ----------------------------
 
                                         OPTION NOT PERFORMED     ______
 
                                             NOTE
 
                                   DURING PROGRESSION OF THIS
                                   OPTION, CDPS WILL RECORD
                                   PERTINENT INFORMATION IN
                                   ITEM 14 - DEU ANOMALY DATA
                                   SHEET, LOCATED AT END OF THIS
                                   SEQUENCE.
 
111-107             OTC  CDPS PERFORM RECOVERY FOR MCDS ___ ANOMALY
 
                                             NOTE
 
                                   PERFORM NEXT TWO STEPS IF
                                   MCDS ANOMALY WAS BFS "CRT
                                   BITE" FSM.
 
111-108                  CDPS REVIEW MCDS PROGRAM NOTES,ITEM 15
                              (LOCATED AT END OF THIS SEQUENCE).
                              VERIFY ANOMALY DUE TO RE-OCCURRENCE
                              OF MCDS PGM NOTE CONDITION.
 
                              RECORD PGM NOTE NO.: ____________
 
                                                NOT PERFORMED     ______
 
111-109             CDPS CDR  PANEL C2
                              CRT ___
                                POWER SW - OFF, THEN ON
 
                                                NOT PERFORMED     ______
 
 
 
                                                                     283
 
VOLUME 5 OF 5                                        OMI NO. - S0007VL5
DATE: 07-01-99                                       REV.    - Z-1
 
                        OPERATION INSTRUCTIONS
 
  SEQ       TIME    CMD  RESP            DESCRIPTION            VERIF.
-------- ---------- ---- ---- --------------------------------- --------
 
                                             NOTE                     -1|
 
                                   PERFORM NEXT STEP IF MCDS
                                   ANOMALY WAS BFS "I/O ERROR CRT"      |
                                   FAULT SUMMARY MESSAGE.
 
                                   "I/O ERROR CRT" FSM WITH NO I/O      |
                                   ERROR LOG ENTRIES INDICATES A
                                   CHECKSUM MISCOMPARE.
 
111-110                  CDPS RECORD NUMBER OF I/O ERROR LOG
                              ENTRIES ASSOCIATED WITH THIS I/O
                              ERROR CRT FAULT SUM MSG:__________
 
                                                NOT PERFORMED     ______
 
                                             NOTE                     -1|
 
                                   HOLD COUNT IF ANOMALY IS
                                   "I/O ERROR CRT" FSM AND TWO
                                   OR MORE UNEXPLAINED I/O
                                   ERRORS HAVE BEEN LOGGED
                                   AGAINST THIS MCDS DURING
                                   COUNTDOWN.                           |
                                                                        |
                                   IF HOLDING COUNT, DO NOT             |
                                   PERFORM THE REMAINDER OF             |
                                   THIS OPTION.                         |
 
111-111             CDPS CDR  CRT ___
 
                              VERIFY GOOD DISPLAY WITH NO ANOMALIES
                              OBSERVED (IE, NO BIG X, DISTORTED
                              CHARACTERS, ETC.)
                                                NOT PERFORMED     ______
 
                                             NOTE
 
                                   IN NEXT STEP, ASSIGN KYBD
                                   TO FAILED DEU.
 
111-112             CDPS CDR  PANEL C2
                              ___ CRT SEL SW - ___
 
                                                NOT PERFORMED     ______
 
 
 
 
 
284
 
VOLUME 5 OF 5                                        OMI NO. - S0007VL5
DATE: 07-01-99                                       REV.    - Z-1
 
                        OPERATION INSTRUCTIONS
 
  SEQ       TIME    CMD  RESP            DESCRIPTION            VERIF.
-------- ---------- ---- ---- --------------------------------- --------
 
                                             NOTE
 
                                   FOLLOWING OPTION WILL TRANSITION
                                   DPS BACK TO G9 FROM T-9 MIN CNFG
                                   TO SUPPORT CONTINGENCY OPERATIONS,
                                   THEN TRANSITION BACK TO G1.
                                   REMAINING SHUTTLE SYSTEMS WILL
                                   MAINTAIN A T-9 MIN CNFG.
 
                                   PERFORM G9 QUICK RECYCLE IF
                                   DPS QUICK G9 RECYCLE IS REQUIRED.
 
 
111-152                       12. G9 QUICK RECYCLE
                              --------------------
 
                                         OPTION NOT PERFORMED     ______
 
111-153             NTD  OTC  DPS WILL BE TRANSITIONING TO G9
                         TBC  FOR CONTINGENCY OPERATIONS.  VERIFY
                         SPE  READY TO PROCEED.
                    OTC  CGNC
                         CGLS
                    TBC  CLOX
                         CLHY
 
                                             NOTE
 
                                   PERFORM NEXT STEP IF BFS STORED
                                   PROGRAM COMMANDS HAVE BEEN SENT
                                   BUT NOT CLEARED.
 
111-154             NTD  *FLT CLEAR BFS SPC BUFFER.  REPORT           -1|
                              COMPLETION.
 
                                                NOT PERFORMED     ______
 
111-155             NTD  OTC  PERFORM QUICK RECYCLE TO G9.
                    OTC  CDPS
 
 
 
 
 
 
 
 
 
 
 
                                                                     297
 
VOLUME 5 OF 5                                        OMI NO. - S0007VL5
DATE: 07-01-99                                       REV.    - Z-1
 
                        OPERATION INSTRUCTIONS
 
  SEQ       TIME    CMD  RESP            DESCRIPTION            VERIF.
-------- ---------- ---- ---- --------------------------------- --------
 
111-156                  CDPS CURSOR CNTL (VASP9 PG-B)
                              RETURN TO HOST
                              XMIT CURSOR KEY - PRESS
 
                              CURSOR CNTL (VASP9 PG-B)
                              INHIBIT LCC MONITORING
                              XMIT CURSOR KEY - PRESS
 
111-157                  CDPS CURSOR CNTL (SAS01 PG-B)
                              DPS INIT DISPLAY (SAS01)
                              XMIT CURSOR KEY - PRESS
 
                              CURSOR CNTL (SAS01 PG-B)
                              TERMINATE OPS MGR5 (SAS25)
                              XMIT CURSOR KEY - PRESS
 
                              PFK 2 KEY - PRESS
 
111-158                  CDPS CONSOLE KYBD
                              VASJ6
                              PERF PGM KEY - PRESS
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
298
 
VOLUME 5 OF 5                                        OMI NO. - S0007VL5
DATE: 07-01-99                                       REV.    - Z-1
 
                        OPERATION INSTRUCTIONS
 
  SEQ       TIME    CMD  RESP            DESCRIPTION            VERIF.
-------- ---------- ---- ---- --------------------------------- --------
 
                              G1 TRANSITION
                              -------------
 
111-168             NTD  OTC  TRANSITION BACK TO G1.
                    OTC  CDPS
 
                                             NOTE                    -1 |
 
                                   BFS ONE SHOT DATA
                                   TRANSFER MUST BE REPERFORMED
                                   IF ANY OF THE FOLLOWING
                                   HAVE OCCURRED:
 
                                   -BFS GPC RE-IPL
                                   -LAUNCH POLYNOMIAL UPDATE
                                   -SRM CHAMBER PRESSURE CAL
                                    UPDATE
                                   -IMU PREFLIGHT CAL
 
                                   PERFORM NEXT THREE STEPS             |
                                   IF BFS ONE SHOT DATA
                                   TRANSFER REQUIRED.
 
111-169             CDPS CDR  PERFORM PASS/BFS TRANSFER PREP          -1|
                              PER YOUR CHECKLIST.                       |
                                                                        |
                                                NOT PERFORMED     ______
 
111-170                  CDPS CRT (VASJ6 PG-B)                        -1|
                              ONE SHOT ENABLED  - INVERT GREEN          |
 
                                                NOT PERFORMED     ______
                                                                        |
111-171                  CDPS PFP (VASJ6)                             -1|
                              PFPK1 KEY (ONE SHOT SELECT) - PRESS
 
                              CRT (VASJ6 PGB)
                              ONE SHOT COMPLETE MILESTONE
                              IN INVERT GREEN
 
                                                NOT PERFORMED     ______|
 
 
 
 
 
 
 
 
 
                                                                     301
 
VOLUME 5 OF 5                                        OMI NO. - S0007VL5
DATE: 07-01-99                                       REV.    - Z-1
 
                        OPERATION INSTRUCTIONS
 
  SEQ       TIME    CMD  RESP            DESCRIPTION            VERIF.
-------- ---------- ---- ---- --------------------------------- --------
 
111-172                       DELETED                                 -1|
                                                                        |
 
111-173                  CDPS PFP (VASJ6)
                              PFPK3 KEY - PRESS (OPS 101 SELECT)
 
                              CRT (VASJ6)
                              VERIFY MESSAGES:
                              "OPS TRANSITION IN PROGRESS"
                              "PASS IN 101, ACTIVE DOWNLIST"
 
111-174             CDPS OTC  PASS G1 TRANSITION COMPLETE.  DPS
                    OTC  NTD  READY FOR BFS TRANSITION TO G1.
 
111-175             OTC  CDR  TAKE BFS TO OPS 1 PER YOUR CHECKLIST.
 
                                             NOTE
 
                                   DUMP AND COMPARE WILL TAKE
                                   APPROXIMATELY TEN MINUTES.
 
111-176                  CDPS PFP (VASJ6)
                              PFPK5 KEY - PRESS (T-20M D&C SELECT)
 
111-177             CDPS OTC  G1 DUMP AND COMPARE IN PROGRESS.
 
111-178             CDR  OTC  BFS OPS 1 TRANSITION COMPLETE.
 
111-179                  CVFS CRT (VASB9)
                              VERIFY BFS TRACKING PASS ON FC 1-4
                              VERIFY NSP STAT GOOD
 
111-180             CVFS NTD  READY FOR BFS UPLINK.
 
111-181             NTD  *FLT PERFORM BFS PREFLIGHT UPLINK
                              LOADING.  REPORT COMPLETION.
 
111-182             OTC  PLT  CONFIGURE PASS AND BFS HORIZONTAL
                              SITUATION DISPLAYS.  REPORT COMPLETION.
 
 
 
 
 
 
 
 
 
 
 
302
 
VOLUME 5 OF 5                                        OMI NO. - S0007VL5
DATE: 07-01-99                                       REV.    - Z-1
 
                        OPERATION INSTRUCTIONS
 
  SEQ       TIME    CMD  RESP            DESCRIPTION            VERIF.
-------- ---------- ---- ---- --------------------------------- --------
 
111-183             OTC  CDR  CONFIGURE YAW STEERING PER YOUR
                              CHECKLIST.  REPORT COMPLETION.
 
111-184             CVFS NTD  T-20 MIN GPC DUMP IS COMPLETE.
                    NTD  OTC
 
                                             NOTE
 
                                   PERFORM NEXT STEP IF
                                   EXPECTED MISCOMPARES
                                   OCCUR.
 
111-185                  CDPS APPL PAGE (VASJ6 PG-B)
                              PFK 3 KEY - PRESS
 
                                                NOT PERFORMED     ______
 
                                             NOTE
 
                                   PERFORM NEXT STEP IF
                                   UNEXPECTED MISCOMPARES
                                   OCCUR.
 
111-186                  CDPS APPL PAGE (VASJ6 PG-B)
                              PFK 2 KEY - PRESS
                                                NOT PERFORMED     ______
 
111-187                  CDPS CURSOR CNTL (SAS01 PGB)
                              DPS INIT DISPLAY
                              XMIT CURSOR KEY - PRESS
 
                              CURSOR CNTL (SAS01 PGB)
                              ACTIVATE OPS MGR 5 (SAS25)
                              XMIT CURSOR KEY - PRESS
 
                              PFK2 KEY - PRESS
 
                                             NOTE                     -1|
 
                                   PERFORM NEXT STEP IF BFS SPC         |
                                   BUFFER WAS CLEARED FOR QUICK
                                   RECYCLE OPTION.
 
111-188             NTD  *FLT TRANSMIT BFS STORED PROGRAM COMMANDS.
                              REPORT COMPLETION.
 
                                                NOT PERFORMED     ______
 
 
 
                                                                     303
 
VOLUME 5 OF 5                                        OMI NO. - S0007VL5
DATE: 07-01-99                                       REV.    - Z-1
 
                        OPERATION INSTRUCTIONS
 
  SEQ       TIME    CMD  RESP            DESCRIPTION            VERIF.
-------- ---------- ---- ---- --------------------------------- --------
 
                                             NOTE
 
                                   PERFORM NEXT TWO STEPS
                                   TO CLEAR RSLS HOLD FLAG,
                                   V90X8667X1, WHICH WILL HAVE
                                   BEEN INITIALIZED TO ON BY
                                   RSLS AT G9 TO G1 TRANSITION
                                   AND WILL BE CLEARED UPON
                                   INITIAL LAUNCH SEQUENCE
                                   RESUME COMMAND.
 
111-189                  CGLS VERIFY MSRB MILESTONE INHIBITED
                              DUE TO RSLS HOLD FLAG.
 
111-190                  CGLS CONSOLE KYBD
                              PFP (RESUME)
                              PFPK1 - PRESS
                              PFP (RESUME EXECUTE)
                              PFPK6 - PRESS
 
                              VFY GND AND ONBOARD CLOCKS RESUME
                              AND RE ENTER HOLD AT T-9 MIN.
 
111-191             OTC  CGLS REVIEW EXPECTED HITS AND RESET AS
                              REQUIRED.
 
111-192                       G9 QUICK RECYCLE COMPLETE.
 
                              G9 QUICK RECYCLE COMPLETE
                              -------------------------
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
304
 
VOLUME 5 OF 5                                        OMI NO. - S0007VL5
DATE: 07-01-99                                       REV.    - Z-1
 
                        OPERATION INSTRUCTIONS
 
  SEQ       TIME    CMD  RESP            DESCRIPTION            VERIF.
-------- ---------- ---- ---- --------------------------------- --------
 
114-004A                      ESSENTIAL BUS SOURCE FAILURE
                              ----------------------------
                              (REF SSID EPDC-07)
                              ------------------
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
                                                                   482.1
 
VOLUME 5 OF 5                                        OMI NO. - S0007VL5
DATE: 07-01-99                                       REV.    - Z-1
 
                        OPERATION INSTRUCTIONS
 
  SEQ       TIME    CMD  RESP            DESCRIPTION            VERIF.
-------- ---------- ---- ---- --------------------------------- --------
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
                    THIS PAGE INTENTIONALLY BLANK
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
482.2
 
VOLUME 5 OF 5                                        OMI NO. - S0007VL5
DATE: 07-01-99                                       REV.    - Z-1
 
                        OPERATION INSTRUCTIONS
 
  SEQ       TIME    CMD  RESP            DESCRIPTION            VERIF.
-------- ---------- ---- ---- --------------------------------- --------
 
117-000                       LAUNCH POLYNOMIAL UPDATE OPTION
                              -------------------------------
 
                                             NOTE
 
                                   PERFORM G1 LAUNCH POLYNOMIAL
                                   UPDATE OPTION IF CURRENTLY
                                   IN G1 AND LAUNCH POLYNOMIAL
                                   UPDATE IS REQUIRED.
 
117-001                       G1 LAUNCH POLYNOMIAL UPDATE OPTION
                              ----------------------------------
 
                                                NOT PERFORMED     ______
 
117-002             NTD  OTC  DPS WILL BE TRANSITIONING TO G9 FOR
                         TBC  LAUNCH POLYMONIAL I-LOAD UPDATE.
                         SPE  VERIFY READY TO PROCEED.
                    OTC  CGNC
                         CGLS
                    TBC  CLOX
                         CLHY
 
                                             NOTE
 
                                   PERFORM NEXT STEP IF BFS STORED
                                   PROGRAM COMMANDS HAVE BEEN
                                   SENT BUT NOT CLEARED.
 
117-003             NTD  *FLT CLEAR BFS SPC BUFFER.  REPORT           -1|
                              COMPLETION.                               |
                                                NOT PERFORMED     ______
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
                                                                     837
 
VOLUME 5 OF 5                                        OMI NO. - S0007VL5
DATE: 07-01-99                                       REV.    - Z-1
 
                        OPERATION INSTRUCTIONS
 
  SEQ       TIME    CMD  RESP            DESCRIPTION            VERIF.
-------- ---------- ---- ---- --------------------------------- --------
 
117-004             *FLT NTD  STARTING ADDRESSES FOR
                         CVFS DOWNLIST DUMP IS:
 
                              GMT L/O:__________
 
117-005             NTD  OTC  PERFORM QUICK RECYCLE TO G9.
                    OTC  CDPS
 
117-006                  CDPS CURSOR CNTL (VASP9 PG-B)
                              RETURN TO HOST
                              XMIT CURSOR KEY - PRESS
 
                              CURSOR CNTL (VASP9 PG-B)
                              INHIBIT LCC MONITORING
                              XMIT CURSOR KEY - PRESS
 
117-007                  CDPS CURSOR CNTL (SAS01 PG-B)
                              DPS INIT DISPLAY (SAS01)
                              XMIT CURSOR KEY - PRESS
 
                              CURSOR CNTL (SAS01 PG-B)
                              TERMINATE OPS MGR 5 (SAS25)
                              XMIT CURSOR KEY - PRESS
 
                              PFK 2 KEY - PRESS
 
117-008                  CDPS CONSOLE KYBD
                              VASJ6
                              PERF PGM KEY - PRESS
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
838
 
VOLUME 5 OF 5                                        OMI NO. - S0007VL5
DATE: 07-01-99                                       REV.    - Z-1
 
                        OPERATION INSTRUCTIONS
 
  SEQ       TIME    CMD  RESP            DESCRIPTION            VERIF.
-------- ---------- ---- ---- --------------------------------- --------
 
                                             NOTE                     -1|
 
                                   G9 RECYCLE IS PERFORMED BY
                                   SEQUENCER VASJ6.  IF BFS IS
                                   ACTIVE IN OPS 101, VASJ6 WILL
                                   FIRST PROMPT CDR TO PERFORM          |
                                   A BFS RECYCLE TO OPS 0 STANDBY.      |
 
                                   ONCE BFS RECYCLE IS COMPLETE,
                                   PROGRAM WILL TRANSITION PASS
                                   TO G9 VIA DEU EQUIVALENT.
                                   PASS G9 TRANSITION TAKES
                                   APPROXIMATELY 90 SECONDS.
 
117-009                  CDPS PFP (VASJ6)
                              PFPK4 KEY - PRESS (COUNTDOWN RECYCLE)
                              FOLLOW RECYCLE PROMPTS
 
                              CRT (VASJ6 PG-B)
 
                              VERIFY MSG: "RECYCLE COMPLETE"
 
117-010                  CVFS CURSOR CNTL (SAS10 PGB)
                              FSW DISPLAY SELECT MENU (SDS13)
                              XMIT CURSOR KEY - PRESS
 
117-011                  CVFS CURSOR CNTL (SAS10 PGB)
                              UPLINK MONITOR (VWS14)
                              XMIT CURSOR KEY - PRESS
 
117-012             CDPS OTC  TRANSITION TO G9 COMPLETE.  READY FOR
                    OTC  NTD  LAUNCH POLYNOMIAL UPDATE.
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
                                                                     839
 
VOLUME 5 OF 5                                        OMI NO. - S0007VL5
DATE: 07-01-99                                       REV.    - Z-1
 
                        OPERATION INSTRUCTIONS
 
  SEQ       TIME    CMD  RESP            DESCRIPTION            VERIF.
-------- ---------- ---- ---- --------------------------------- --------
 
                                             NOTE
 
                                   NOTED REQUIREMENT IS SATISFIED
                                   BY COMPLETION OF TWO OF NEXT
                                   SEVEN STEPS.  (REQUIREMENT WILL
                                   ONLY BE SATISIFIED DURING S0007)
 
                                   OMRS S00FF0.250-A
 
117-013             NTD  *FLT CONFIGURE FOR TWO STAGE COMMAND
                              MANUAL EXECUTE.  PERFORM AND VERIFY
                              LAUNCH POLYNOMIAL UPLINK.
 
                              OMRS S00FF0.250-A
 
117-014                  CDPS CURSOR CNTL (VASP9 PG-B)
                              ACTIVATE LCC MONITORING
                              XMIT CURSOR KEY - PRESS
 
                              PFK 1 KEY - PRESS
 
117-015                  CDPS APPL PAGE (VASJ6 PG-B)
                              PFK1 KEY - PRESS (RECYCLE CMPLT CONTINUE)
                              PFK1 KEY - PRESS (BSR CONTINUE)
                              PFK1 KEY - PRESS (NBAT CONTINUE)
 
117-016             CDPS CDR  PERFORM PASS/BFS TRANSFER PREP          -1|
                              PER YOUR CHECKLIST.                       |
                                                                        |
117-017                  CDPS CRT (VASJ6 PG-B)                        -1|
                              ONE SHOT ENABLED  - INVERT GREEN          |
                                                                        |
117-018                       DELETED                                   |
 
117-019             *FLT NTD  LAUNCH POLYNOMIAL UPLINK COMPLETE.
 
                              OMRS S00FF0.250-A
 
 
 
 
 
 
 
 
 
 
 
 
 
840
 
VOLUME 5 OF 5                                        OMI NO. - S0007VL5
DATE: 07-01-99                                       REV.    - Z-1
 
                        OPERATION INSTRUCTIONS
 
  SEQ       TIME    CMD  RESP            DESCRIPTION            VERIF.
-------- ---------- ---- ---- --------------------------------- --------
 
117-064                       COMPLETION OF PREVIOUS NINE STEPS
                              SATISFIES NOTED OMRS REQUIREMENT
                              WHEN PERFORMED DURING S0007.
 
                              OMRSD S00FF0.250-B
 
                                                NOT PERFORMED     ______
 
117-065                  CVFS PFP (VWS14)
                              PFPK2 - PRESS (RETURN)
 
117-066                  CVFS APPLICATION PAGE (VWS14 PG-B)
                              PFK15 KEY - PRESS (TERMINATE)
 
117-067                  CVFS APPLICATION PAGE (SAS10 PG-B)
                              PFK2 KEY - PRESS
 
117-068                  CGLS REVIEW EXPECTED HITS AND RESET
                              ACCORDINGLY.
 
117-069                       G1 LAUNCH POLYNOMIAL UPDATE OPTION
                              COMPLETE.
 
                                             NOTE                     -1|
 
                                   PERFORM NEXT STEP IF BFS
                                   SPC BUFFER WAS CLEARED FOR           |
                                   QUICK RECYCLE OPTION.
 
117-070             NTD  *FLT TRANSMIT BFS STORED PROGRAM COMMANDS.
                              REPORT COMPLETION.
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
                                                                     847
 
VOLUME 5 OF 5                                        OMI NO. - S0007VL5
DATE: 07-01-99                                       REV.    - Z-1
 
                        OPERATION INSTRUCTIONS
 
  SEQ       TIME    CMD  RESP            DESCRIPTION            VERIF.
-------- ---------- ---- ---- --------------------------------- --------
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
                    THIS PAGE INTENTIONALLY BLANK
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
848
 
VOLUME 5 OF 5                                        OMI NO. - S0007VL5
DATE: 07-01-99                                       REV.    - Z-1
 
                        OPERATION INSTRUCTIONS
 
  SEQ       TIME    CMD  RESP            DESCRIPTION            VERIF.
-------- ---------- ---- ---- --------------------------------- --------
 
121-046             CLOX LPS  CRT (SLP50 PG-A)
                    156       VERIFY LO2 SAFING PGM (SAL06) EXECUTING
                              OR COMPLETE.
 
                              VERIFY FOLLOWING MSGS:
 
                              SAL06 - LOX CONSOLE IS NOT SUPPORTING
 
                              SAL06 - LOX LOADING/DRAIN IN PROGRESS,
                                      SAFING COMMANDS ISSUED.  LOX
                                      ET ULLAGE PRESS RSYS TRANSFERRED.
 
                                                NOT PERFORMED     ______
 
                              LOX IN REVERT OR STOP DRAIN
                              ---------------------------
                              CONFIGURATION COMPLETE
                              ----------------------
 
                                             NOTE
 
                                   PERFORM NEXT STEP IF C3 CONSOLE
                                   FAILED DURING LOADING OR DRAIN
                                   AND CONSOLE RSYS TRANSFER NOT
                                   SUCCESSFUL.
 
121-047             LPS  NTD  C3 CONSOLE TRANSFER WAS NOT             -1|
                    232       SUCCESSFUL.  PERFORM HARDWIRE SAFING
                    NTD  CLOX PER S1003 OXYGEN 76.                      |
 
                                                NOT PERFORMED     ______
 
                              LOX IN BACKUP REPLENISH
                              -----------------------
 
                                             NOTE
 
                                   PERFORM NEXT TWO STEPS IF
                                   LOX IN BACKUP REPLENISH.
 
121-048             CLOX NTD  PERFORMING SAFING PER S1003             -1|
                    232       OXYGEN 94 - CONSOLE C3 LOSS - LO2         |
                    NTD  LPS  IN BACKUP REPLENISH.                      |
 
                                                NOT PERFORMED     ______
 
 
 
 
 
                                                                     975
 
VOLUME 5 OF 5                                        OMI NO. - S0007VL5
DATE: 07-01-99                                       REV.    - Z-1
 
                        OPERATION INSTRUCTIONS
 
  SEQ       TIME    CMD  RESP            DESCRIPTION            VERIF.
-------- ---------- ---- ---- --------------------------------- --------
 
121-049             CLOX LPS  LO2 BACKUP REPLENISH CONTROL HAS
                    156       BEEN PERFORMED BY PGM SA001 AT
                              MASTER CONSOLE.  MONITOR FOR ANY
                              EXCEPTION AND NOTIFY CLOX IMMEDIATELY.
 
                                                NOT PERFORMED     ______
 
                              LOX IN BACKUP REPLENISH COMPLETE
                              --------------------------------
 
                                             NOTE
 
                                   DO NOT PERFORM NEXT TWO STEPS
                                   IS C3 CONSOLE FAILED IN PRE-
                                   CHILLDOWN, AFTER T-10 SEC OR
                                   IN POST LAUNCH.
 
121-050                  LPS  CRT (SLP50 PG-A)
 
                              VERIFY GREEN MESSAGE:
 
                              RSYS/SAFING FOR CONSOLE C3 TO BKUP
                              COMPLETE.
 
                                                NOT PERFORMED     ______
 
121-051             LPS  NTD  C3 RSYS TRANSFER TO BKUP CONSOLE
                    232  CTPE COMPLETE.
 
                                                NOT PERFORMED     ______
 
                              HOT SPARE INITIALIZATION
                              ------------------------
 
121-052             LPS  C1MC PERFORM FOLLOWING AT MSTR CONSOLE
                              KEYBOARD:
 
                              1.   A_KU_HSP___(1, 2 OR 3)
 
                              2.   C PP C3 _ _
 
121-053             LPS  C1SE AT HSP___(1, 2, OR 3) H/W
 
                              1.   PERFORM $BMAP C3
 
                              2.   HALT HSP___
 
 
 
 
976
 
VOLUME 5 OF 5                                        OMI NO. - S0007VL5
DATE: 07-01-99                                       REV.    - Z-1
 
                        OPERATION INSTRUCTIONS
 
  SEQ       TIME    CMD  RESP            DESCRIPTION            VERIF.
-------- ---------- ---- ---- --------------------------------- --------
 
121-054             LPS  C1MC AT BUFFER ENTER PWA LIMITS IN
                              B/S ___,___; LL _____ UL _____.
 
121-055             LPS  C1SE BOOT CPU #0203
 
121-056             LPS  NTD  C3 CONSOLE HOT SPARE INITIALIZATION
                    NTD  CLOX COMPLETE.  HOT SPARE CONSOLE IS
                    232  CMPL LOCATED IN CONSOLE______.
 
                                             NOTE
 
                                   DO NOT PERFORM NEXT STEP IF
                                   C3 CONSOLE FAILED IN PRE-
                                   CHILLDOWN, AFTER T-10 SEC OR
                                   IN POST LAUNCH.
 
121-057                  LPS  CRT (SLP50 PG-A)
 
                              VERIFY GREEN MESSAGE:
 
                              RSYS/SAFING FOR CONSOLE C3 TO C3 COMPLETE.
 
                                                NOT PERFORMED     ______
 
                              HOT SPARE INITIALIZATION, LOX IN
                              --------------------------------
                              REVERT OR STOP DRAIN CONFIGURATION
                              ----------------------------------
 
                                             NOTE
 
                                   PERFORM NEXT TWO STEPS IF
                                   LOX IN REVERT OR STOP DRAIN
                                   CONFIGURATION.
 
121-058             CLOX LPS  CRT (SLP50 PG-A)
                    156
                              WHEN HOT SPARE CONSOLE IS INITIALIZED
 
                              VERIFY LO2 SAFING PGM (SAL06)
                              EXECUTING OR COMPLETE.
 
                              VERIFY FOLLOWING MSGS:
 
                              SAL06 - LOX CONSOLE SUPPORTING
 
                              SAL06 - LOX RSYS RETURNED TO LOX
                                      CONSOLE
                                                NOT PERFORMED     ______
 
                                                                     977
 
VOLUME 5 OF 5                                        OMI NO. - S0007VL5
DATE: 07-01-99                                       REV.    - Z-1
 
                        OPERATION INSTRUCTIONS
 
  SEQ       TIME    CMD  RESP            DESCRIPTION            VERIF.
-------- ---------- ---- ---- --------------------------------- --------
 
121-059             CLOX NTD  SAFING PER OXYGEN 93 - CONSOLE C3
                    232       LOSS DURING LOAD OR DRAIN COMPLETE.
 
                                                NOT PERFORMED     ______
 
                              HOT SPARE INITIALIZATION, LOX IN
                              --------------------------------
                              REVERT OR STOP DRAIN CONFIGURATION
                              ----------------------------------
                              COMPLETE
                              --------
 
                              HOT SPARE CONSOLE INITIALIZATION,
                              ---------------------------------
                              LOX IN BACKUP REPLENISH
                              -----------------------
 
                                             NOTE
 
                                   PERFORM NEXT TWO STEPS IF
                                   LOX IN BACKUP REPLENISH.
 
121-060             CLOX NTD  LOX REPLENISH CONTROL HAS BEEN          -1|
                    232       TRANSFERRED BACK TO C3 HOT SPARE          |
                              CONSOLE.  LOX SYSTEM IS IN STABLE
                              REPLENISH.
 
                                                NOT PERFORMED     ______
 
121-061             CLOX NTD  SAFING PER OXYGEN 94 - CONSOLE C3       -1|
                    232       LOSS - LOX IN BACKUP REPLENISH
                              COMPLETE.
 
                                                NOT PERFORMED     ______
 
                              HOT SPARE CONSOLE INITIALIZATION,
                              ---------------------------------
                              LOX IN BACKUP REPLENISH COMPLETE
                              --------------------------------
 
 
 
 
 
 
 
 
 
 
 
978
 
VOLUME 5 OF 5                                        OMI NO. - S0007VL5
DATE: 07-01-99                                       REV.    - Z-1
 
                        OPERATION INSTRUCTIONS
 
  SEQ       TIME    CMD  RESP            DESCRIPTION            VERIF.
-------- ---------- ---- ---- --------------------------------- --------
 
125-016                  JBFX ON NON-LAUNCH PAD FIREX HARDWIRE  CWSS
                              BACKUP PANEL, START FIREX BACKUP
                              PUMP P-1 BY PERFORMING THE FOLLOWING:
 
                              1.   SWITCH               POSITION
                                   ------               --------
                                   P1 START             ON (UP)
 
                              2.   INDICATOR            STATE
                                   ---------            -----
                                   P1 RUNNING           ON (RED)
 
                                                NOT PERFORMED     ______
 
125-017                  JBFX DEACTIVATE NON-LAUNCH PAD FIREX   CWSS
                              HARDWAIRE BACKUP PANEL BY
                              PERFORMING THE FOLLOWING:
 
                              1.   SWITCH               POSITION
                                   ------               --------
                                   COMMAND POWER        OFF (DOWN)
 
                              2.   INDICATOR            STATE
                                   ---------            -----
                                   COMMAND POWER        RED LAMP OFF
 
                                                NOT PERFORMED     ______
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
                                                                    1221
 
VOLUME 5 OF 5                                        OMI NO. - S0007VL5
DATE: 07-01-99                                       REV.    - Z-1
 
                        OPERATION INSTRUCTIONS
 
  SEQ       TIME    CMD  RESP            DESCRIPTION            VERIF.
-------- ---------- ---- ---- --------------------------------- --------
 
125-018                  JBFX ON CONSOLE, NON-LAUNCH PAD              -1|
                              SKELETON P2A/P2B, ACTIVATE        WSSA    |
                              FIREX COMMAND BUS BY                      |
                              PERFORMING THE FOLLOWING:
 
                              1.   TAB CURSOR ONTO "NON-FHCP"
                                   COMMAND TARGET.
 
                              2.   PRESS "XMIT CURSOR" KEY.
 
                              3.   SELECT "PAD ___"/"RESTORE
                                   C1 CONFIG" STATE.
 
                              4.   PRESS "EXEC CMD" KEY.
 
                              5.   VERIFY:
 
                              INDICATOR               STATE
                              ---------               -----
                              CCS BUS A PWR           ON (GREEN)
                              CCS BUS B PWR           ON (GREEN)
                              CCS FIREX CMD BUS       ON (GREEN)
 
                                                NOT PERFORMED     ______
 
                                             NOTE                     -1|
 
                                   FOLLOWING STEP WILL BE
                                   PERFORMED IF BACKUP PUMP P-1         |
                                   IS SUPPORTING.
 
125-019             JBFX NTD  BACKUP PUMP P-1 IS ON LINE.       WSSA
                    212       RECOMMEND CONTINUE WITH COUNT.
 
                                                NOT PERFORMED     ______
 
                              OPTION A COMPLETE
                              -----------------
 
 
 
 
 
 
 
 
 
 
 
 
1222
 
VOLUME 5 OF 5                                        OMI NO. - S0007VL5
DATE: 07-01-99                                       REV.    - Z-1
                              APPENDIX Z
 
                        EMERGENCY INSTRUCTIONS
                        ----------------------
 
  SEQ    CMD  RESP                  DESCRIPTION                 VERIF.
-------- ---- ----  ------------------------------------------- --------
 
 
132-000             EMERGENCY INSTRUCTIONS - INTEGRATED
                    -----------------------------------
 
132-001             LOSS OF ORBITER GROUND COOLING
                    ------------------------------
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
                                                                    1297
 
VOLUME 5 OF 5                                        OMI NO. - S0007VL5
DATE: 07-01-99                                       REV.    - Z-1
 
                        EMERGENCY INSTRUCTIONS
 
  SEQ    CMD  RESP                  DESCRIPTION                 VERIF.
-------- ---- ----  ------------------------------------------- --------
 
                                                                      -1|
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
FIGURE 132-001 - LOSS OF ALL THREE SETS OFS70-0509/0510 REFR UNITS
 
1298
 
VOLUME 5 OF 5                                        OMI NO. - S0007VL5
DATE: 07-01-99                                       REV.    - Z-1
 
                        EMERGENCY INSTRUCTIONS
 
  SEQ    CMD  RESP                  DESCRIPTION                 VERIF.
-------- ---- ----  ------------------------------------------- --------
 
134-000             EMERGENCY INSTRUCTIONS - ORBITER
                    --------------------------------
 
134-001             EMERGENCY SHUTDOWN - ORBITER - ELECTRICAL
                    -----------------------------------------
                    POWER SYSTEM
                    ------------
 
                                             NOTE
 
                                   ANY OR ALL OF THE FOLLOWING
                                   STEPS SHALL BE PERFORMED
                                   ONLY UPON DIRECTION OF OTC.
 
134-002             EMERG ORBITER POWER DOWN - LPS
                    ------------------------------
 
                                             CAUTION                  -1|
 
                                   DELETED                              |
 
134-003  OTC  NTD   EMERGENCY POWER DOWN WILL BE PERFORMED.
         232  TBC
              PTC
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
                                                                    1417
 
VOLUME 5 OF 5                                        OMI NO. - S0007VL5
DATE: 07-01-99                                       REV.    - Z-1
 
                        EMERGENCY INSTRUCTIONS
 
  SEQ    CMD  RESP                  DESCRIPTION                 VERIF.
-------- ---- ----  ------------------------------------------- --------
 
                                             NOTE
 
                                   PERFORM NEXT STEP FOR IUS
                                   MISSIONS AND IF IUS IS
                                   POWERED UP AND TIME IS
                                   AVAILABLE FOR IUS POWER
                                   DOWN. (APPROX 20 MINUTES)
 
134-004  OTC        PERFORM IUS EMERGENCY POWER DOWN PER DOP.
 
                                                NOT PERFORMED     ______
 
134-005  PTC  ICTC  PERFORM IUS POWER DOWN PER DOP D290-50020-27.     -1|
                    REPORT COMPLETION.
 
134-006  ICTC PTC   IUS POWER DOWN PER DOP D290-50020-27 COMPLETE.    -1|
 
134-007  PTC  NTD   IUS POWER DOWN COMPLETE.
 
134-008  OTC  CEPD  PERFORM EMERGENCY ORBITER POWER DOWN.
         132
 
                                             CAUTION
 
                                   IN THE EVENT THE FUEL CELLS
                                   ARE SUPPLYING POWER TO THE
                                   ORBITER, VERIFY OR PERFORM
                                   THE FOLLOWING STEP PRIOR TO
                                   EXECUTING AN EMERGENCY
                                   POWER DOWN.
 
                                             NOTE
 
                                   PERFORM NEXT STEP IF CREW
                                   MODULE MANNED.
 
134-009  CEPD PLT   PANEL R1
                    POWER DISTRIBUTION
                      ESS BUS SOURCE
                        FC 1 SW - OFF
                        FC 2 SW - OFF
                        FC 3 SW - OFF
                                                NOT PERFORMED     ______
 
 
 
 
 
 
 
1418
 
VOLUME 5 OF 5                                        OMI NO. - S0007VL5
DATE: 07-01-99                                       REV.    - Z-1
 
                        EMERGENCY INSTRUCTIONS
 
  SEQ    CMD  RESP                  DESCRIPTION                 VERIF.
-------- ---- ----  ------------------------------------------- --------
 
134-030       CEPD  ORBITER ELECTRICAL SAFING PANEL
                    ORBITER
                      MN A SW - OFF (MOM)
                      MN B SW - OFF (MOM)
                      MN C SW - OFF (MOM)
 
                    ORBITER
                      MN A OFF LITE ON (MOM)
                      MN B OFF LITE ON (MOM)
                      MN C OFF LITE ON (MOM)
 
                    ITCU
                      MN A SW - OFF
                      MN B SW - OFF
                      MN C SW - OFF
 
                    ITCU
                      MN A OFF LITE  ON
                      MN B OFF LITE  ON
                      MN C OFF LITE  ON
 
134-031       CEPD  ORBITER ELECTRICAL SAFING PANEL
                    VOLT/AMPS SELECT SWITCH
                    MN "A" LL
                    MN "B" LL
                    MN "C" LL
 
134-032       CEPD  ORBITER ELECTRICAL SAFING PANEL
                    ITCU
                      PF 1 SW - OFF
                      PF 2 SW - OFF
                    ITCU
                      PF 1 OFF LITE ON
                      PF 2 OFF LITE ON
 
134-033       CEPD  ORBITER ELECTRICAL SAFING PANEL
                    VOLT/AMPS SELECT SWITCH
                      PF-1 LL
                      PF-2 LL
 
134-034  CEPD OTC   ORBITER EMERGENCY POWER DOWN COMPLETE.
         132
 
134-035  OTC  CDR   VERIFY ORBITER POWER HAS BEEN REMOVED.
              CEPD
              CTPE
 
 
 
 
                                                                    1425
 
VOLUME 5 OF 5                                        OMI NO. - S0007VL5
DATE: 07-01-99                                       REV.    - Z-1
 
                        EMERGENCY INSTRUCTIONS
 
  SEQ    CMD  RESP                  DESCRIPTION                 VERIF.
-------- ---- ----  ------------------------------------------- --------
 
134-036             CONFIGURE PAYLOAD PRIMARY TO MAIN B
                    -----------------------------------
 
                                             CAUTION                  -1|
 
                                   FOR IUS MISSIONS ONLY, PAYLOAD       |
                                   PRIMARY POWER MUST REMAIN ON         |
                                   FROM IUS POWER ON THRU LAUNCH.       |
                                   IF P/L PRI MN C IS LOST BEFORE       |
                                   L-20 MINUTES, IUS WILL POWER         |
                                   DOWN.  IUS COUNTDOWN MUST BE         |
                                   REPEATED.  AFTER L-20 MINUTES,       |
                                   IUS WILL SWITCH TO ASE BATTERIES     |
                                   AND WILL BE NO-GO FOR LAUNCH.        |
 
                                   SHOULD ANY LOSS OF P/L PRI MN C
                                   OCCUR, NOTIFY PTC IMMEDIATELY.
                                   DO NOT REAPPLY P/L PRI POWER
                                   WITHOUT NOTIFING PTC.
 
                                             NOTE
 
                                   FOLLOWING STEPS WILL BE RUN
                                   PER OTC DIRECTION IN EVENT
                                   OF LOSS OF MAIN C POWER FEED
                                   TO PAYLOAD PRIMARY BUS AFTER
                                   CLOSE OF PAYLOAD BAY DOORS.
 
                                   ORBITER SWITCHES MAY BE
                                   CONFIGURED BY SCO, PLT, CDR
                                   AND MSI; AS DIRECTED BY ANY
                                   OF THE FOLLOWING ENGINEERS:
                                   OTC, CPLE, CEPD OR TPE.
 
                                   WHILE ON GND PWR, ONLY ONE
                                   MAIN BUS SOURCE (MAIN B OR
                                   MAIN C) MAY BE TURNED ON
                                   WHEN APPLYING P/L PRI PWR.
 
134-037  PTC  NTD   PERFORM P/L PRIMARY MN C POWER DOWN.
         NTD  OTC
         OTC  PLT
 
 
 
 
 
 
 
 
1426
 
VOLUME 5 OF 5                                        OMI NO. - S0007VL5
DATE: 07-01-99                                       REV.    - Z-1
 
                        EMERGENCY INSTRUCTIONS
 
  SEQ    CMD  RESP                  DESCRIPTION                 VERIF.
-------- ---- ----  ------------------------------------------- --------
 
134-049             RECONFIGURE PAYLOAD PRIMARY TO MAIN C
                    -------------------------------------
 
                                             CAUTION                  -1|
 
                                   FOR IUS MISSIONS ONLY, PAYLOAD       |
                                   PRIMARY POWER MUST REMAIN ON         |
                                   FROM IUS POWER ON THRU LAUNCH.       |
                                   IF P/L PRI MN C IS LOST BEFORE       |
                                   L-20 MINUTES, IUS WILL POWER         |
                                   DOWN.  IUS COUNTDOWN MUST BE         |
                                   REPEATED.  AFTER L-20 MINUTES,       |
                                   IUS WILL SWITCH TO ASE BATTERIES     |
                                   AND WILL BE NO-GO FOR LAUNCH.        |
 
                                   SHOULD ANY LOSS OF P/L PRI MN C
                                   OCCUR, NOTIFY PTC IMMEDIATELY.
                                   DO NOT REAPPLY P/L PRI POWER
                                   WITHOUT NOTIFING PTC.
 
                                             NOTE
 
                                   FOLLOWING STEPS WILL BE PER
                                   OTC DIRECTION IF PAYLOAD
                                   PRIMARY POWER HAS BEEN
                                   SWITCHED TO MAIN B.  THEY
                                   WILL RECONFIGURE PAYLOAD
                                   PRIMARY POWER TO NORMAL
                                   MAIN C FEED FOR LAUNCH.
 
                                   ORBITER SWITCHES MAY BE
                                   CONFIGURED BY SCO, PLT, CDR
                                   OR MSI; AS DIRECTED BY ANY OF
                                   FOLLOWING ENGINEERS: OTC,
                                   CPLE, CEPD OR TPE.
 
                                   WHILE ON GND PWR, ONLY ONE
                                   MAIN BUS SOURCE (MAIN B OR
                                   MAIN C) MAY BE TURNED ON WHEN
                                   APPLYING P/L PRI PWR.
 
134-050  PTC  NTD   REQUEST CONCURRENCE TO RECONFIGURE PAYLOAD
         NTD  OTC   PRIMARY POWER TO MAIN C.  PAYLOAD PRIMARY
         OTC  PLT   POWER WILL BE LOST MOMENTARILY.
 
134-051  OTC  PLT   PERFORM P/L PRIMARY MN B POWER DOWN.
 
 
 
 
                                                                    1429
 
VOLUME 5 OF 5                                        OMI NO. - S0007VL5
DATE: 07-01-99                                       REV.    - Z-1
 
                        EMERGENCY INSTRUCTIONS
 
  SEQ    CMD  RESP                  DESCRIPTION                 VERIF.
-------- ---- ----  ------------------------------------------- --------
 
                                             CAUTION
 
                                   MN B CONTR CB WILL APPLY
                                   CONTROL POWER TO FUEL CELL
                                   NO. 2 MAIN BUS SWITCHES.
                                   CAUTION SHOULD BE USED IN
                                   POSITIONING FOLLOWING
                                   SWITCHES TO AVOID INADVERTANT
                                   FUEL CELL ACTIVATION.
 
134-052  OTC  PLT   PANEL O13
                    ROW C
                      ESS 2CA
                        MN C CONTR CB - CLOSE (NOTE IF
                                               VERIFIED OR CB
                                               CLOSURE REQUIRED)
 
134-053  OTC  PLT   PANEL R1
                    POWER DISTRIBUTION
                      PAYLOAD
                         PRI MN B SW - OFF (MOM)
 
 
                    VERIFY:
                    PRI MN B TB OFF
 
                                             NOTE
 
                                   PERFORM THE NEXT STEP IF
                                   CB WAS ORGINALLY OPEN.
 
134-054  OTC  PLT   PANEL O13
                    ROW C
                      ESS 2CA
                        MN B CONTR CB - OPEN
 
                                                NOT PERFORMED     ______
 
134-055  OTC  NTD   P/L PRIMARY MN B POWER DOWN IS COMPLETE.
         NTD  PTC
 
134-056  NTD  PTC   VERIFY READY FOR P/L PRI MAIN C PWR.
 
134-057  OTC  PLT   PERFORM P/L PRI MN C PWR UP
 
 
 
 
 
 
1430
 
VOLUME 5 OF 5                                        OMI NO. - S0007VL5
DATE: 07-01-99                                       REV.    - Z-1
 
                        EMERGENCY INSTRUCTIONS
 
  SEQ    CMD  RESP                  DESCRIPTION                 VERIF.
-------- ---- ----  ------------------------------------------- --------
 
135-071             LO2 ET VENT AREA FIRE DURING LOADING
                    ------------------------------------
                    (OXYGEN 80)
                    -----------
 
                                             WARNING
 
                                   PAD PERSONNEL - IMMEDIATE
                                   SAFETY HAZARD
 
                                   THIS EMERGENCY MAY REQUIRE
                                   IMMEDIATE FLIGHT CREW/
                                   GROUND CREW EGRESS AND ESCAPE
                                   PER SEQ 132 - EMERGENCY
                                   INSTRUCTIONS - INTEGRATED,
                                   AT DISCRETION OF NTD.
 
135-072  CLOX NTD   THERE HAS BEEN A FIRE IN LOX ET VENT AREA.
              TBC   STOP FLOW HAS BEEN INITIATED AND ET VENT
                    VALVE HAS BEEN CLOSED (OXYGEN 80).
 
135-073             DRAIN WITH LOX ET VENT AND RELIEF VALVE
                    ---------------------------------------
                    FAILED OPEN (OXYGEN 81)
                    -----------------------
 
                                             WARNING
 
                                   THIS EMERGENCY MAY REQUIRE
                                   IMMEDIATE FLIGHT CREW/
                                   GROUND CREW EGRESS AND ESCAPE
                                   PER SEQ 132 - EMERGENCY
                                   INSTRUCTIONS - INTEGRATED,
                                   AT DISCRETION OF NTD.
 
135-074  CLOX NTD   ET LOX DRAIN WITH VENT VALVE FAILED OPEN HAS
              TBC   BEEN INITIATED (OXYGEN 81).
 
 
 
 
 
 
 
 
 
 
 
 
 
                                                                    1491
 
VOLUME 5 OF 5                                        OMI NO. - S0007VL5
DATE: 07-01-99                                       REV.    - Z-1
 
                        EMERGENCY INSTRUCTIONS
 
  SEQ    CMD  RESP                  DESCRIPTION                 VERIF.
-------- ---- ----  ------------------------------------------- --------
 
135-075             MAJOR PROPELLANT LEAK IN ET/IT (OXYGEN 82)        -1|
                    ------------------------------------------          |
                                                                        |
                                             WARNING                  -1|
                                                                        |
                                   PAD PERSONNEL - IMMEDIATE            |
                                   SAFETY HAZARD.                       |
                                                                        |
                                   THIS EMERGENCY SEQUENCE MAY          |
                                   REQUIRE IMMEDIATE FLIGHT             |
                                   CREW/GROUND CREW EGRESS AND          |
                                   ESCAPE PER SEQ 132, EMERGENCY        |
                                   INSTRUCTIONS - INTEGRATED, AT        |
                                   THE DISCRETION OF THE NTD.           |
                                                                        |
135-076  CHGD NTD   THERE IS A MAJOR PROPELLANT LEAK IN THE           -1|
                    ET/IT (10,000 PPM OR GREATER O2 OR H2).             |
                    EMERGENCY SAFING IS REQUIRED. CONDITION             |
                    IS YELLOW.                                          |
                                                                        |
135-077  NTD  TBC   PERFORM SAFING FOR MAJOR PROPELLANT LEAK          -1|
         TBC  CLOX  IN ET/IT PER OXYGEN 82.                             |
                                                                        |
135-078  CLOX TBC   ET LOX DRAIN HAS BEEN INITIATED.                  -1|
              NTD                                                       |
                                                                        |
135-079  CLOX TBC   SAFING PER OXYGEN 82 - MAJOR PROPELLANT             |
         TBC  NTD   LEAK IN ET/IT COMPLETE.                             |
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
1492
 
VOLUME 5 OF 5                                        OMI NO. - S0007VL5
DATE: 07-01-99                                       REV.    - Z-1
 
                        EMERGENCY INSTRUCTIONS
 
  SEQ    CMD  RESP                  DESCRIPTION                 VERIF.
-------- ---- ----  ------------------------------------------- --------
 
135-080             DELETED                                           -1|
 
                                             NOTE                     -1|
 
                                   DELETED                              |
 
135-081             DELETED                                           -1|
 
135-082             DELETED                                           -1|
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
                                                                    1493
 
VOLUME 5 OF 5                                        OMI NO. - S0007VL5
DATE: 07-01-99                                       REV.    - Z-1
 
                        EMERGENCY INSTRUCTIONS
 
  SEQ    CMD  RESP                  DESCRIPTION                 VERIF.
-------- ---- ----  ------------------------------------------- --------
 
                                             NOTE                     -1|
 
                                   DELETED                              |
 
135-083             DELETED                                           -1|
 
135-084             DELETED                                             |
 
135-085             DELETED                                             |
 
135-086             DELETED                                           -1|
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
1494
 
VOLUME 5 OF 5                                        OMI NO. - S0007VL5
DATE: 07-01-99                                       REV.    - Z-1
 
                        EMERGENCY INSTRUCTIONS
 
  SEQ    CMD  RESP                  DESCRIPTION                 VERIF.
-------- ---- ----  ------------------------------------------- --------
 
                                             NOTE                     -1|
 
                                   DELETED                              |
 
135-087             DELETED                                             |
 
135-088             DELETED                                             |
 
135-089             DELETED                                           -1|
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
                                                                    1495
 
VOLUME 5 OF 5                                        OMI NO. - S0007VL5
DATE: 07-01-99                                       REV.    - Z-1
 
                        EMERGENCY INSTRUCTIONS
 
  SEQ    CMD  RESP                  DESCRIPTION                 VERIF.
-------- ---- ----  ------------------------------------------- --------
 
135-090             ABRUPT TOTAL LOSS OF ORBITER POWER
                    ----------------------------------
                    (OXYGEN 83)
                    -----------
 
                                             WARNING
 
                                   PAD PERSONNEL - IMMEDIATE
                                   SAFETY HAZARD.
 
                                   THIS EMERGENCY MAY REQUIRE
                                   IMMEDIATE FLIGHT CREW/
                                   GROUND CREW EGRESS AND ESCAPE
                                   PER SEQ 132 - EMERGENCY
                                   INSTRUCTIONS - INTEGRATED,
                                   AT DISCRETION OF NTD.
 
                                             CAUTION
 
                                   THIS SEQUENCE COVERS LOSS OF
                                   ALL THREE MAIN ORBITER POWER
                                   BUSES DURING EACH PHASE OF
                                   LOAD/DRAIN.
 
                                   IN ALL PHASES, THE FOLLOWING
                                   FUNCTIONS WILL BE LOST:
 
                                   ET VENT VALVE CLOSED
                                   INDICATOR
 
                                   ET ULLAGE PRESSURE
                                   (4K, 4L, 4M)
 
                                   MPS VALVE POSITION IND
 
                                   ET LIQUID LEVEL SENSORS
                                   AND MPS ECO SENSORS
 
 
 
 
 
 
 
 
 
 
 
 
 
1496
 
VOLUME 5 OF 5                                        OMI NO. - S0007VL5
DATE: 07-01-99                                       REV.    - Z-1
 
                        EMERGENCY INSTRUCTIONS
 
  SEQ    CMD  RESP                  DESCRIPTION                 VERIF.
-------- ---- ----  ------------------------------------------- --------
 
135-114             LOSS OF GSE POWER - STORAGE AREA AND/OR
                    ---------------------------------------
                    PTCR (OXYGEN 90)
                    ----------------
 
135-115  CLOX NTD   THERE HAS BEEN LOSS OF POWER IN _____ AREA.
              TBC   REVERT/STOP DRAIN HAS BEEN INITIATED (OXYGEN 90).
 
135-116             LARGE ACREAGE LOSS OF LOX ET TPS
                    --------------------------------
                    (OXYGEN 91)
                    -----------
 
135-117  CLOX NTD   THERE HAS BEEN A LARGE ACREAGE LOSS OF TPS
              TBC   ON LOX ET.  STOP FLOW HAS BEEN INITIATED.
                    PERFORMING DRAIN FROM STOP FLOW (OXYGEN 91).
 
135-118             LOSS OF HELIUM INJECT (OXYGEN 92)
                    ---------------------------------
 
135-119  CLOX NTD   SAFING PER OXYGEN 92 - LOSS OF HELIUM INJECT
              TBC   HAS BEEN PERFORMED.
 
135-120             GO2 VENT HOOD EMERGENCY/CONTINGENCY LIFT/         -1|
                    -----------------------------------------
                    LOWER (OXYGEN 95)                                   |
                    -----------------
 
135-121  CMEC TBC   GO2 VENT HOOD CONTINGENCY HOOD LIFT/LOWER WILL
         136        BE INITIATED.  REQUEST LOX ET VENT VALVE BE
         TBC  CLOX  CLOSED.
 
135-122  CLOX TBC   LOX ET VENT VALVE IS CLOSED.
         136
         TBC  CMEC
 
135-123  CMEC TBC   GO2 VENT HOOD LIFT/LOWER COMPLETE.
         136        LOX ET VENT VALVE MAY BE RE-OPENED.
         TBC  CLOX
 
135-124  CLOX TBC   GO2 EMERGENCY/CONTINGENCY HOOD LIFT/LOWER         -1|
         136        COMPLETE (OXYGEN 95).                               |
         TBC  NTD
         232
 
 
 
 
 
 
                                                                    1503
 
VOLUME 5 OF 5                                        OMI NO. - S0007VL5
DATE: 07-01-99                                       REV.    - Z-1
 
                        EMERGENCY INSTRUCTIONS
 
  SEQ    CMD  RESP                  DESCRIPTION                 VERIF.
-------- ---- ----  ------------------------------------------- --------
 
135-125             SSME OPOV OR MOV LEAKAGE (OXYGEN 96)              -1|
                    ------------------------------------
 
135-126  CSME NTD   ME-___ LOX SUPPLY LINE TEMP HAS DECREASED
              OTC   BELOW LCC SSME-1 LIMIT.  INITIATING SAFING
                    PER OXYGEN 96.                                      |
 
135-127  CLOX NTD   1.   LO2 PREVALVES HAVE BEEN CLOSED TO
              TBC        ISOLATE SSME LEAKAGE.
 
                    2.   STOP FLOW HAS BEEN INITIATED.
                         REQUEST CONCURRENCE TO INITIATE
                         DRAIN (IF ET LEVEL GREATER THAN
                         2 PCT).
 
                                                NOT PERFORMED     ______
                                                                  SS2
 
135-128  NTD  CLOX  INITIATE LO2 DRAIN PER OMI S1003
         TBC        (IF ET LO2 LEVEL GREATER THAN 2 PCT).
 
                                                NOT PERFORMED     ______
 
135-129  CSME NTD   LO2 SAFING PER OXYGEN 96 IS COMPLETE.  LO2        -1|
              OTC   PREVALVES HAVE BEEN CLOSED AND LO2 DRAIN
                    HAS BEEN INITIATED (IF ET LO2 LEVEL GREATER
                    THAN 2 PCT).  CURRENT TREND IS __________.
 
135-130             LOSS OF GPC/OI LINES (OXYGEN 99)                  -1|
                    --------------------------------
 
135-131  CLOX NTD   LOX SYSTEM STOP FLOW HAS BEEN INITIATED DUE TO
              TBC   LOSS OF GPC OR OI LINK. IF LINK IS NOT RESTORED
                    LOX DRAIN (USING LOW RANGE XDUCERS IF GPC FAILED)
                    WILL BE REQUIRED.
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
1504
 
VOLUME 5 OF 5                                        OMI NO. - S0007VL5
DATE: 07-01-99                                       REV.    - Z-1
 
                        EMERGENCY INSTRUCTIONS
 
  SEQ    CMD  RESP                  DESCRIPTION                 VERIF.
-------- ---- ----  ------------------------------------------- --------
 
136-078             LOSS OF CRITICAL PURGES (LH2 128)
                    ---------------------------------
 
                                             NOTE
 
                                   IF IN DRAIN, CONTINUE IN
                                   DRAIN.  ONE OF FOLLOWING
                                   PURGES HAS BEEN LOST:
 
                                   1.  ET/IT PGE
 
                                   2.  ORB AFT FUSELAGE GN2
                                       PURGE AND PAYLOAD BAY
                                       PURGE
 
                                   3.  ET VENT DISC CAVITY
                                       PURGE
 
                                   4.  ORB/ET LH2 DISC CARRIER
                                       PL PGE
 
                                   5.  T-0 UMBILICAL CAVITY PURGE.
 
136-079  CLHY TBC   ET CRITICAL PURGE __________  MALFUNCTIONED
              NTD   AND TERMINATED.  LH2 SYSTEM IN REVERT AND
                    DRAIN BEING INITIATED.
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
                                                                    1523
 
VOLUME 5 OF 5                                        OMI NO. - S0007VL5
DATE: 07-01-99                                       REV.    - Z-1
 
                        EMERGENCY INSTRUCTIONS
 
  SEQ    CMD  RESP                  DESCRIPTION                 VERIF.
-------- ---- ----  ------------------------------------------- --------
 
136-080             MAJOR PROPELLANT LEAK IN ET/IT (LH2 129)          -1|
                    ----------------------------------------            |
                                                                        |
                                             WARNING                    |
                                                                        |
                                   PAD PERSONNEL - IMMEDIATE            |
                                   SAFETY HAZARD.                       |
                                                                        |
                                   THIS EMERGENCY SEQUENCE MAY          |
                                   REQUIRE IMMEDIATE FLIGHT             |
                                   CREW/GROUND CREW EGRESS AND          |
                                   ESCAPE PER SEQ 132, EMERGENCY        |
                                   INSTRUCTIONS - INTEGRATED,           |
                                   AT THE DISCRETION OF THE NTD.        |
                                                                        |
                                             NOTE                     -1|
                                                                        |
                                   SEVERE OXYGEN LEAKAGE INTO           |
                                   INTERTANK (SUCH AS RUPTURED          |
                                   LOX TANK) MAY WARRANT USE OF         |
                                   EMERGENCY DRAIN.  REALTIME           |
                                   EVALUATION OF SYSTEM IS REQUIRED.    |
                                                                        |
136-081  CHGD NTD   THERE IS A MAJOR PROPELLANT LEAK IN THE             |
                    ET/IT (10,000 PPM OR GREATER O2 OR H2).             |
                    EMERGENCY SAFING IS REQUIRED. CONDITION             |
                    IS YELLOW.                                          |
                                                                        |
136-082  NTD  CLHY  PERFORM SAFING FOR MAJOR PROPELLANT LEAK          -1|
                    IN ET/IT PER S1004 (SEQ 129).                       |
                                                                        |
136-083  CLHY NTD   ET LH2 DRAIN INITIATED.                           -1|
                                                                        |
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
1524
 
VOLUME 5 OF 5                                        OMI NO. - S0007VL5
DATE: 07-01-99                                       REV.    - Z-1
 
                        EMERGENCY INSTRUCTIONS
 
  SEQ    CMD  RESP                  DESCRIPTION                 VERIF.
-------- ---- ----  ------------------------------------------- --------
 
139-000             EMERGENCY INSTRUCTIONS - PAYLOADS
                    ---------------------------------
 
139-001             INSTRUCTION 1 - IUS EMERGENCY POWER DOWN
                    ----------------------------------------
 
                                             NOTE
 
                                   IF IUS IS PERFORMING
                                   BATTERY CHECKS AND TVC
                                   CHECKS, WAIT UNTIL IUS
                                   RETURNS TO MAIN C.
                                   SCENARIO WILL TAKE
                                   APPROXIMATELY 2 MINUTES
                                   TO COMPLETE.
 
139-002  PTC  OTC   REQUIRE EITHER MS2 AND/OR CEPD SUPPORT
         132        ON OIS CHANNEL 134 FOR IUS EMERGENCY
                    POWER DOWN.
 
139-003  PTC  ICTC  PERFORM EMERGENCY POWER DOWN FOR IUS.
         134
 
                                             NOTE                     -1|
 
                                   PERFORM NEXT STEP IF FLIGHT
                                   CREW OR SCO IS PRESENT.
 
139-004  ICTC MS2   PANEL L10-PCP
                    PANEL
                      POWER
                        PRI CB - CLOSE                          L10CB1
                        ALT CB - CLOSE                          L10CB2
                      IUS CONV POWER
                        PRI SW - OFF                            L10S1
                        PRI TB BP                               L10I1
                        ALT TB BP                               L10I31
 
                                                NOT PERFORMED     ______
 
 
 
 
 
 
 
 
 
 
 
                                                                    1563
 
VOLUME 5 OF 5                                        OMI NO. - S0007VL5
DATE: 07-01-99                                       REV.    - Z-1
 
                        EMERGENCY INSTRUCTIONS
 
  SEQ    CMD  RESP                  DESCRIPTION                 VERIF.
-------- ---- ----  ------------------------------------------- --------
 
                                             NOTE
 
                                   PERFORM NEXT TWO STEPS IF
                                   FLIGHT CREW OR SCO IS NOT
                                   PRESENT AND COS HAS CONTROL.
 
139-005  PTC  ICTC  POWER OFF IUS FROM THE COS.
         134
 
                                                NOT PERFORMED     ______
 
139-006  ICTC ICC1  COS CRT/KYBD
                    PG, 189
                    TYPE:  10 (IUS CONV PWR - OFF)
                    ENTER - PRESS
 
                                                NOT PERFORMED     ______
 
139-007  ICTC PTC   IUS IS POWERED OFF.
 
139-008  PTC  NTD   IUS IS POWERED DOWN.                              -1|
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
1564
 
 
 
 DATE:  1999-07-02   15.25.06
 
 S0007VL5
 
 SHUTTLE COUNTDOWN - (LPS)
 
 DISTRIBUTION F - FINAL
 
 
 JILL JAHNKOW..........................2
   FA-99
   BOEING NORTH AMERICAN
   MISSION SUPPORT ROOM
   12214 LAKEWOOD BLVD
   DOWNEY, CA  90241
 CHRIS WEAVER..........................8
   PZ-L
 
 
 TOTAL QTY:   287
 
 FOR CHANGES TO THIS DISTRIBUTION LIST, CONTACT:
 
 MARY            M. HESTER              , USK-187, (407) 861-3301 EXT
 ELIZABETH       C. KLOS                , USK-187, (407) 861-3430 EXT
 
1
 DATE:  1999-07-02   15.25.06
 
 S0007VL5
 
 SHUTTLE COUNTDOWN - (LPS)
 
 DISTRIBUTION F - FINAL
 
 
 AE70/J. HOWARTH                          NASA/JSC............5
   BOEING NORTH AMERICAN                    C/O TRANSPORTATION OFFICE
   12214 LAKEWOOD BLVD                      BUILDING 420
   DOWNEY, CA  90241                        HOUSTON, TX  77058
 AFQA/LGQAB/P. MCDANIEL                     ATTN: DA82/MARY C. THOMAS
 BA/FC-50/W. BRAGG.....................2    BLDG 30M, ROOM 235
 BA/FC-51/ELS DATA FILES                  NN-L/PAYLOAD ENGINEERING
 BA/FC-51/J. HAGOOD....................2  NN-M1
 BA/FC-51/J. LEWIS.....................2  NN-M2
 BA/FC-51/N. BIHR......................3  NN-M3
 BNA SPACEHAB/NANCY CRABTREE...........2  THIO-LSS/BRIAN ST. AUBIN
   SPACEHAB, INC                          USBI-LSS/LIBRARY
   620 MAGELLAN RD                        USK-078/CCC, C-1 PNEU
   CAPE CANAVERAL, FL 32920               USK-078/CCC, C-1 WATER
 C07A/J. LECHER                           USK-078/CCC, C-3 POWER
   JSC, TX  77058                         USK-078/CCC, INTEGRATION
 EC-B/DAVID SPACEK                        USK-225/JODI SILLS
 EI-C-C/NSF CONSOLE                       USK-391/SAFETY OPS (PAD B)
 EI-C-C/NSF LC39 PROCEDURES               USK-550/VITT OFFICE......2
 EI-C-C/PAC CONSOLE                       ZA03/DAVID BARNES
 EI-C-D/NASA VAB SAFETY                     BOEING NORTH AMERICAN
 EI-C-F/NASA OPF SAFETY                     555 DISCOVERY DRIVE
 EP2/LIBRARY                                HUNTSVILLE, AL  35806
   JSC, TX   77058                        3 SLS/DOOT/CAPT. G. FENTRESS
 ESMC-SEO/CAMPBELL                        3 SLS/MA/B. STRACENER....2
 LLOYD MUSTIN SSM                         45 SPACE WING/SESL/PAFB
   MAIL STOP AE26                         AIR-FORCE CCAFS
   BOEING NORTH AMERICAN                    N/A
   SPACE SYSTEMS DIV.                       45 RANS/DOOB
   P.O. BOX 7009                            (CCAFS)
   DOWNEY, CA  90241-7009                   PHILLIPS PARKWAY/10400
 MS-E68/R. BAKES                            PATRICK AFB, FL  32925
   THIOKOL CORP.                          CCC LIBRARY..............3
   P.O. BOX 707                             USK-093
   BRIGHAM CITY, UT  84302-0707           MISSION SUPPORT
 MV2/D. STAMPER                             SGS-347
   JSC, TX  77058                         EG&G PROTECTIVESYSTEMS
 MV3/KENNETH BROWN                          BOC-326
   JSC, TX  77058
 
1
 DATE:  1999-07-02   15.25.06
 
 S0007VL5
 
 SHUTTLE COUNTDOWN - (LPS)
 
 DISTRIBUTION F - FINAL
 
 
 SECTION NASANAVAIDSSYSTEMS               SFOC SAFETY-CONSOLE
   PK-F3                                    USK-399
 SECTION NASACOMM/RFSYSTEMS               SUPV-SAFETY RELIABILITY-ENGR
   PK-F3                                    USK-291
 NASA-FLT ELECTR-SYS-SECT                 SRS-SSC OPERATIONS-SAFTEY
   PK-F                                     MU6110
 FLOW DIRECTOR-OFFICE                     TECHNICAL DOC-CTR.......50
   PH-B2                                    USK-038
 SECTION NASAECLSSSYSTEM                  TSMO SITE-MGRS
   PK-G5                                    USK-299
 BOEING P/L-TEST-CONDUCTOR.............3  TSMO OMD
   F214                                     USK-075
 GUIDANCE-AND NAVIGATION                  USA INSTRUMENTATION.....2
   USK-195                                  USK-194
 GEL LCC-RM-3R18                          USA LAUNCH-OPERATIONS..2
   USK-542                                  USK-C09
 LAUNCH DIRECTOR.......................2  VITT OFFICE
   PH                                       F204
 ORB MECHANISM                              O&C BLDG
   PK-H5                                  SWING ARMS-ENG'G
 NASA QA-FR1                                USK-290
   USK-268                                ET MECHANICAL-ENG
 OTC ORBTESTCONDUCTOR..................4    USK-251
   USK-023                                ET LH2PAD-A
 SPC PAD-SAFETY                             USK-174
   USK-257                                ET LH2PAD-B
 TEST-OPS PAD-A                             USK-390
   USK-307                                ET-LOX PAD-A
 TEST-OPS PAD-B                             USK-173
   USK-389                                ET-LOX PAD-B
 BRANCH INSTRUM.&P/LSYS................2    USK-316
   PK-F3                                  MEQ ORB-MECHANISMS-ENG
 PNEUMATICS ENGINEERING                     USK-408
   USK-043                                OMS/RCS ENG-PADA
 OFFICE NASAFIRE/RESCUE                     USK-484
   IM-SPS-A                               OMS/RCS ENG-PADB
 PAD SWING-ARMS-SHOP                        USK-347
   USK-398                                CENTRL WRK-PKG-BLD
                                            USK-409
 
1
 DATE:  1999-07-02   15.25.06
 
 S0007VL5
 
 SHUTTLE COUNTDOWN - (LPS)
 
 DISTRIBUTION F - FINAL
 
 
 COMM CONTROL..........................2  STEVE GODFREY
   USK-145                                  USK-241
 TSMO PAD-A                               BILL NUTTER........5
   USK-076                                  USK-214
 TSMO PAD-B                               JANIENE L. PAPE
   USK-404                                  USK-284
 TSMO SUPV-STM.........................3  PAUL L. QUANDT
   USK-299                                  USK-356
 ROBERT T. ROOK II                        TODD M. GRACOM
   USK-356                                  USK-195
 FRANK A. DEBERNARDO                      PAUL R. GRATSCH....2
   USK-116                                  USK-195
 NEAL R. GRIFFITH                         MARK F. DEZENDORF
   USK-112                                  USK-285
 DON GARCEAU                              EARL D. COOLEY
   USK-109                                  USK-269
 THOMAS E. JACOBS......................2  ERIC D. HENRY
   USK-107                                  USK-225
 JIM TOWNSEND                             BOB DOUGERT.......2
   USK-108                                  USK-356
 SHOE SHOEMAKER                           DEAN T. TYRE
   USK-144                                  USK-421
 PAT CHAPPELL                             E HALL III........3
   USK-074                                  USK-420
 DENNIS E. LOHAUS                         STEVE VELLIGAN
   USK-069                                  USK-213
 RICHARD H. MURRAY.....................2  RANDY DUNCAN......2
   USK-414                                  USK-196
 ROBERT RODRIGUEZ......................2  DON GREEN
   USK-198                                  USK-043
 ED DICRISTINA                            RTW/SECUR  R. HOEFER
   USK-305                                  USK-453
 TOM WELLS.............................2  PEGGY S. HATTAWAY
   USK-420                                  USK-246
 MARTIN L. CARLSON                        GARY A. WOODS
   USK-420                                  USK-281
 JUDY HOOPER...........................3  PAUL E. BRANDT
   USK-247                                  USK-111
 
1
 DATE:  1999-07-02   15.25.06
 
 S0007VL5
 
 SHUTTLE COUNTDOWN - (LPS)
 
 DISTRIBUTION F - FINAL
 
 
 OZZIE FISH                               PHIL WEBER
   USK-314                                  PK-H6
 PAUL A. KRAUSE                           PAT MARKEY
   USK-214                                  PK-J
 ANDY BUNDY                               RENEE HART
   PK-E3                                    USK-669
 DAVID R. SCHECHTER                       DONALD G. SIMMONS
   PZ-C                                     USK-647
 JIMBO BOLTON                             BOBBY E. ORR......2
   USBI-LSS                                 USK-607
 BILL CLEVER II                           OLAN J. BERTRAND
   SK                                       CA4
 KATHLEEN A. CONWAY                         HOUSTON, TX  77058
   USK-669                                KEN FORD
 TERRI L. HERST                             USK-637
   PK-D                                   RICHARD MIZELL
 ED MANGO                                   PK-F6
   PK-D2                                  ERVIN G. WALKER
 SCOTT CHANDLER........................2    JCI-VITC-2
   PK-E4                                  ANGELO PACE
 MICHAEL GARSKE                             USK-682
   DF24                                   RANDY DAVIES
   JSC, TX  77058                           CSR-3200
 STEVE SWICHKOW                             CAPE CANAVERAL AFS, FL 32899
   PK-F6                                  RONALD W. WETMORE
 AL DIAZ                                    MMC-15
   PK-F                                   ERIC P. GARDZE
 BOB BEIL                                   ROC-OSB
   PK-G3                                  HAROLD E. REED
 ANDY DIBBERN                               JJ-3-B
   PK-G6                                  JEFF LEVITT
 PATRICIA E. GLADNEY                        F256
   PK-G5                                  CHUCK GIVENS
 PETE CHITKO                                BOC-342
   PK-H6                                  RAYMOND G. PREECE
 GREG KATNIK                                ZK-07
   PK-H7
 JORGE E. RIVERA
   PK-H7
 
1
 DATE:  1999-07-02   15.25.06
 
 S0007VL5
 
 SHUTTLE COUNTDOWN - (LPS)
 
 DISTRIBUTION F - FINAL
 
 
 RAY W. NUSS                              FERDINAND JONES
   EV4                                      AC-58
   JOHNSON SPACE CENTER                     BOEING NORTH AMERICAN
   HOUSTON, TX  77058                       6633 CANOGA AVE
 ROBERT B. LUECKING                         CANOGA PARK, CA  91304
   ZK-86                                  CALVIN J. CULBERTSON.....2
 MATTHEW J. HOFMANN                         FC-51
   ROC-LSS                                  CCAS, FL  32899
 JIM ALLAMON                              LISA A. MALONE
   ZK-21                                    PA-MSB
 CANDICE F. NORMAN.....................2  BRUCE D. BOUTON
   BOC-349                                  8A-44
 TOM HILL                                   BOEING DEFENSE & SPACE G
   ASC/ERD-FL                               P.O. BOX 3999
 TAB CHOATE                                 SEATTLE, WA   98124-2499
   SA21                                     K. GRANT
   BOEING - ROCKETDYNE DIVI                 USH-440X
   MARSHALL SPACE FLIGHT CE                 UNITED SPACE ALLIANCE
   BLDG 4202, RM 405                        600 GEMINI
   HUNTSVILLE, AL  35812                    HOUSTON, TX  77058
 AL SOFGE                                 JERRY L. GREENWOOD
   EC                                       3731
 TONY IPPOLITO                              MICHOUD ASSY FACILITY
   MILA                                     LOCKHEED MARTIN
 NEAL E. VANSCYOC                           P.O. BOX 29304
   F224                                     NEW ORLEANS, LA  70189
 JAMES B. PARKS                           ALEX RODRIGUEZ.......3
   PK-J-B                                   ZK-86
 PHIL LINTEREUR........................2  DEBBIE HAHN
   F264                                     NN-M2
 RONALD L. ECKER                          MEGAN MISCHKOT
   BOC-327                                  N/A
 PETE WILSON                                MICHOUD ASSEMBLY FACILIT
   ZK-07                                    P.O. BOX 29300
 JAMES REED                                 NEW ORLEANS, LA  70189
   EY-C                                     DEPT 4250
 WHIT BARTLETT
   PK-D2